Comment

Butte, Montana ยท Copper mine guide

Butte Mine, Montana: Copper Output, History and Today

Butte’s working mine is the Continental Pit, run by Montana Resources east of the flooded Berkeley Pit. It mills about 45,000 tons of ore a day for copper, molybdenum and silver, on a hill that produced 21 billion pounds of copper between 1889 and 1982.

Authored by Farmonaut Research & Content Team
Reviewed and verified by Farmonaut Mining & Mineral Exploration Team
Updated 12 November 2026 ยท 13 min read
Sentinel-2 Satellite View Of Berkeley And Continental Pits, Butte, Silver Bow County, Montana
Sentinel-2 true-colour composite of Berkeley and Continental pits, Butte, Silver Bow County, Montana (46.02ยฐN, 112.50ยฐW). Contains modified Copernicus Sentinel data, 2022 to 2026, processed in Google Earth Engine.

Key takeaways

  • The active Butte mine is the Continental Pit, operated by Montana Resources since mining restarted in June 1986 (Elko Daily, 2023).
  • The company described typical output of about 65 million lb of copper, 8-9 million lb of molybdenum and 600,000 oz of silver a year (2023).
  • In 2023 it sent 15.7 million tons of ore to the concentrator, about 43,000 tons a day (Montana Resources filing to Montana DEQ).
  • Butte produced 21 billion lb of copper from 1889 to 1982, plus 4.9 billion lb of zinc and 3.7 billion lb of manganese from 1880 to 1972 (MBMG, 2023).
  • The Berkeley Pit is kept below 5,410 ft by pumping and treatment under the Superfund program (PitWatch; US EPA).
In this article
  1. Butte mine at a glance
  2. What is mined in Butte, Montana today
  3. How big is the Butte copper mine
  4. Estimate copper output from tonnage and grade
  5. Butte copper mine history: from Copper Kings to Montana Resources
  6. Berkeley Pit vs Continental Pit
  7. Superfund cleanup and the environment
  8. Jobs and the local economy
  9. Copper price and what it means for Butte
  10. Outlook: what to watch at the Butte mine
  11. How consultants use Butte as a reference case
  12. Frequently asked questions

The Butte mine that still runs today is the Continental Pit, an open-pit copper and molybdenum mine operated by Montana Resources about 2 km east of the flooded Berkeley Pit in Butte, Montana. In a July 2023 interview the company said it mills around 45,000 tons of ore a day and, over the previous ten years, typically made about 65 million pounds of copper, 8 to 9 million pounds of molybdenum and about 600,000 ounces of silver a year (Elko Daily, 2023).

Behind that working pit sits one of the most productive copper camps in history. The Montana Bureau of Mines and Geology records that the mines of the “Richest Hill on Earth” produced 21 billion pounds of copper between 1889 and 1982. This guide covers what is mined at Butte now, how the deposit works, the history from the Copper Kings to the Anaconda Company and ARCO, the Superfund cleanup, and what a consultant should check before using Butte as a benchmark. It ends with a production calculator you can run with your own numbers.

Butte mine at a glance

Item Detail Source and date
Active mine Continental Pit (open pit) MBMG, 2019
Operator Montana Resources, bought from ARCO by industrialist Dennis Washington; mining restarted June 1986 Elko Daily, 2023
Products Copper and molybdenum concentrates, with some silver Elko Daily, 2023
Ore milled About 45,000 tons per day (2023 interview); 15.7 million tons sent to the concentrator in 2023 Montana Resources filing to Montana DEQ, January 2024
Typical copper output About 65 million pounds a year (ten-year typical figure) Elko Daily, 2023
Head grade Generally about 0.225% copper, with some zones near 0.5% Elko Daily, 2023
Employees About 390 Elko Daily, 2023
Stated mine life About 32 years, subject to a further tailings lift Elko Daily, 2023
Historic output 21 billion pounds of copper, 1889-1982 MBMG Fact Sheet 2, 2023

Short tons are used here because that is how the operator reports them (1 short ton = 2,000 pounds, about 0.907 metric tonnes).

What is mined in Butte, Montana today

Three products come out of the Continental Pit: copper, molybdenum and silver. Copper is the main revenue metal. Molybdenum, a metal used to harden steel, is a by-product recovered from the mineral molybdenite. The Montana Bureau of Mines and Geology notes that the Continental deposit has a lower overall copper grade than the old Berkeley ore body, and that less than 0.1% molybdenite helps make the mine economic. The same report says the Continental Pit has been mined for low-grade copper and molybdenum since 1986, with a break in production.

Chart

What the Butte Hill produced

Historic district output, billion pounds

0.06.012.018.024.0Copper21.0Zinc4.9Manganese3.7Source: Montana Bureau of Mines and Geology, Fact Sheet 2 (2023). Copper 1889-1982; zinc and manganese 1880-1972.
0.06.012.018.024.0Copper21.0Zinc4.9Manganese3.7Source: Montana Bureau of Mines and Geology, Fact Sheet 2(2023). Copper 1889-1982; zinc and manganese 1880-1972.
Copper dwarfs everything else, but zinc and manganese output were also large.

The USGS confirms that Montana remains one of eight copper-mining states. In its Mineral Commodity Summaries 2026, Arizona supplied about 70% of US mine output in 2025, and copper was also mined in Alaska, Michigan, Missouri, Montana, Nevada, New Mexico and Utah. The USGS molybdenum chapter lists one by-product molybdenum operation in Montana among seven by-product producers in the country, which matches Butte.

Gold is not a meaningful product. Montana Resources’ human resources vice president said in 2023 that the old Berkeley ore had “a fair bit” of gold while the Continental has almost none, but it does carry molybdenum (Elko Daily, 2023).

Other metals the Butte Hill produced

Butte was never only a copper camp. MBMG describes the district as a zoned porphyry copper-molybdenum deposit. A porphyry deposit is a large, low-grade body of ore spread through a granite-like intrusion, rather than a narrow vein. Mines in the central zone (Kelley, Granite Mountain, Pilot Butte, Belmont and Steward) produced mostly copper; the intermediate zone (Anselmo, Emma, Ophir, Travona) produced mostly zinc and manganese; and the outer zone (Marget Ann, Orphan Girl and Orphan Boy) produced mostly manganese and silver. Between 1880 and 1972 the district also produced 4.9 billion pounds of zinc and 3.7 billion pounds of manganese (MBMG Fact Sheet 2, 2023).

The Pilot Butte mine, which some searches link to the “Copper King” era, was one of these central-zone copper mines. Its shaft is now one of the compliance points used to check water levels in the flooded underground workings (MBMG, 2019).

Copper mining explained: from open pit to electric car

โ–ถ Copper mining explained: from open pit to electric car ยท 6:03

How big is the Butte copper mine

Size can be measured in three ways: ore milled, area disturbed and metal produced. Montana Resources’ 2023 annual production report to the Montana Department of Environmental Quality gives exact tonnages for that calendar year.

Chart

Continental Pit: rock moved in 2023

Million short tons

0.05.010.015.020.0Ore to concentrator15.7Waste rock13.3Source: Montana Resources, 2023 annual production information to Montana DEQ (January 2024).
0.05.010.015.020.0Ore to concentrator15.7Waste rock13.3Source: Montana Resources, 2023 annual production informationto Montana DEQ (January 2024).
For every ton of ore the mine moved about 0.85 tons of waste.
  • Ore mined and milled: 15,715,558 tons, all sent through the crushers to the concentrator.
  • Waste rock mined: 13,288,410 tons, a waste-to-ore ratio of roughly 0.85 to 1.
  • Holes drilled and blasts: 14,254 blast holes and 131 blasts, using 6,394 tons of explosives.
  • Disturbed area: 5,566 acres, of which the exposed tailing pond was 1,106 acres.
  • Diesel used: 3,367,037 gallons.

These figures come from the operator’s 2023 production information filed under its air quality permit. The July 2023 press interview also described a fleet of 18 Caterpillar 793 haul trucks (240- to 250-ton class), two Atlas Copco drills, electric rope shovels and newly added Caterpillar 994 front-end loaders.

Grade is the share of metal in the rock. At about 0.225% copper, each ton of ore holds about 4.5 pounds of copper before processing losses. That is low by world standards, which is why Butte depends on high daily throughput, by-product molybdenum and reliable power. The company said power has typically been its largest consumable (Elko Daily, 2023).

Estimate copper output from tonnage and grade

Consultants often need a quick check on whether a stated output is plausible. Multiply tons milled per day by grade, by 2,000 pounds per ton, by recovery and by operating days. With 45,000 tons a day, 0.225% copper, an example 85% recovery and 365 days, the answer is about 63 million pounds, close to the 65 million pounds the operator described. Recovery is the share of copper in the ore that ends up in concentrate; 85% here is an illustrative input, not a published Butte figure. Use the calculator below with your own inputs and today’s copper price.

Calculator

How much copper does a mill this size make?

Enter tons milled, grade, recovery and your own copper price.

short tons

% Cu

%

days

US$/lb
62.83 million lbcopper per year
  • Copper per year (metric tonnes): 28,497
  • Gross value at your price (US$): $301,563,000
  • Copper per ton milled (lb): 3.83

Example values only. Defaults use Butte’s reported 45,000 tons a day and 0.225% copper; recovery of 85% is an illustrative input, not a published Butte figure. Pounds = tons/day x grade/100 x 2,000 x recovery x days. Gross value ignores smelter deductions and costs. Price is an input: example, use today’s price.

Butte copper mine history: from Copper Kings to Montana Resources

Butte began as a gold and silver camp. The National Park Service says the town was founded as a mining town after silver was found in 1872, but became known for copper, with the highest output in the United States and nearly one third of the world’s copper in the early 1900s. Demand rose with electrification and peaked during World War I, when copper went into ammunition.

Infographic

Butte mining in 6 steps

  1. 11872Silver discovery founds Butte as a mining town (NPS).
  2. 21880s-1900sCopper Kings build mines; Anaconda dominates.
  3. 31955Berkeley Pit opens; mines to 1982 (MBMG).
  4. 41982-83Pumps off, workings flood; ARCO halts mining.
  5. 51986Montana Resources restarts at the Continental Pit.
  6. 62003Mine reopens after the 2000 power-price shutdown.

The Copper Kings

Three men fought for control of the hill. Marcus Daly built the Anaconda business and, according to the NPS, formed the Amalgamated Copper Mining Company in 1899. William A. Clark, Daly’s political rival, later became a US Senator. F. Augustus Heinze was a mining engineer who used lawsuits to challenge the larger owners. Daly’s company ended up owning most of the mines, giving “The Company” a near monopoly in Butte, and by the 1900s Anaconda was one of the largest mining companies in the world, a position it held until ARCO bought it in 1977 (NPS).

Underground to open pit

The ground under Butte became a maze of roughly 10,000 miles of tunnels, some about a mile deep (Elko Daily, 2023). The Anaconda Company opened the Berkeley Pit in the 1950s; MBMG states the pit mined copper in the upper and central part of the ore body between 1955 and 1982. Underground mining largely ended in 1975, and selective vein mining stopped in 1977 (MBMG).

ARCO, shutdown and restart

The Atlantic Richfield Company (ARCO) bought Anaconda in 1977. On 22 April 1982 the mine-dewatering pumps were turned off and the underground workings began to flood (MBMG, 2019). ARCO halted Butte mining on 30 June 1983. Dennis Washington then bought the Continental Pit and other properties for about the value of the equipment, a price the company recalls as “somewhere around $7 million”, and mining restarted in June 1986. The mine shut again in 2000, when low copper prices met a jump in power costs after Montana deregulated electricity, and reopened in October 2003 (Elko Daily, 2023).

Berkeley Pit vs Continental Pit

Visitors often mix up the two pits. They sit close together but play opposite roles.

Feature Berkeley Pit Continental Pit
Status Closed in 1982, now a pit lake Active mine, operating 24 hours a day
Operator or responsible party Managed under Superfund by Atlantic Richfield and Montana Resources with EPA and Montana DEQ Montana Resources
Ore Higher copper grade, some gold, strongly altered and pyrite-rich Lower copper grade, molybdenum, less altered rock with some calcite
Water Acidic, metal-rich; kept below 5,410 ft Mostly near-neutral pH because the rock can neutralise acid

MBMG explains that the Continental fault, a west-dipping normal fault with about 1 km of vertical offset, separates the two ore bodies. The Continental rock contains fresh feldspar and biotite, less pyrite and up to 1-2% calcite, so it is less prone to generate acid. For the full story of the pit lake, see our guide to the Berkeley Pit in Butte, Montana.

Superfund cleanup and the environment

Butte’s mining left a large cleanup task. According to the US EPA, it has worked with Montana DEQ on cleanup actions across Butte and Silver Bow Creek since 1983, and that work is ongoing. MBMG notes that the damage from over 150 years of mining, milling and smelting reaches from Butte to Missoula along the upper Clark Fork River, including over 100 km of streamside tailings.

Keeping the Berkeley Pit below the protective level

Groundwater around the mine flows into the Berkeley Pit, not out of it. PitWatch, run by the Berkeley Pit Public Education Committee, explains that the critical water level is 5,410 feet above sea level, the lowest point in the valley at the bottom of Silver Bow Creek. Water is pumped from the pit and treated at the Horseshoe Bend Water Treatment Plant, then discharged to Silver Bow Creek after further treatment, so that the pit never reaches that level.

Since September 2019, MBMG reports, Horseshoe Bend spring water has been pumped straight to the Yankee Doodle tailings impoundment for co-disposal with mill tailings, while the lime plant switched to treating Berkeley Pit water full time. The active mine and mill use the treated water.

Butte Priority Soils

The Butte Priority Soils Operable Unit covers more than six square miles, over 4,000 acres, of the Butte Hill. Its history page reports about 21.5 billion pounds of copper produced from 1880 through 2004, and approximately 8.2 billion gallons of impacted groundwater collected and treated since 2009. In 2016 a large flock of snow geese died after landing on the pit; afterward Atlantic Richfield and Montana Resources expanded the waterfowl protection program in place since 1996 (Berkeley Pit history, Wikipedia).

The seven environmental impacts of mining, explained in clay

โ–ถ The seven environmental impacts of mining, explained in clay ยท 2:31

Jobs and the local economy

The Continental Pit is still one of Butte’s larger employers, with about 390 staff in 2023, and the company said it was then one of the largest electricity users in Montana. The camp’s history shaped the wider state too. Two impacts often asked about are the smelter at Anaconda that processed Butte ore, and the Butte, Anaconda & Pacific Railroad that linked them; both form part of the Butte-Anaconda Historic District, a National Historic Landmark District (NPS). Butte was also a center of the US labor movement, known as the “Gibraltar of Unionism”.

Chart

US copper mine output is easing

Recoverable copper, thousand metric tons

04008001,2001,6001,23020211,23020221,13020231,05020241,0002025Source: USGS, Mineral Commodity Summaries 2026, copper (2025 estimated).
04008001,2001,6001,23020211,23020221,13020231,05020241,0002025Source: USGS, Mineral Commodity Summaries 2026, copper (2025estimated).
US output fell for a third year; Montana is one of eight copper-mining states.

Nationally, Butte is a small share of output. The USGS estimates US mine production of recoverable copper at 1.0 million metric tons in 2025, down 5% from 2024, and 65 million pounds is about 29,500 tonnes. Readers looking for land or rights in the state can see our guide to Montana mineral rights, and a state-by-state view is on our US mining map of active mines.

Copper price and what it means for Butte

A low-grade mine is sensitive to price. The USGS reports the US producer cathode price averaged about 490 cents per pound in 2025, up from 431.8 cents in 2024, and the COMEX average about 480 cents. At an illustrative 480 cents a pound, 65 million pounds of copper would be worth about US$312 million before smelter charges, transport and costs. That is a rough gross figure for scale only; concentrate sales carry deductions and the price changes daily. Check the LME or COMEX for today’s price before using it.

Chart

Copper prices rose in 2025

Annual average, US cents per pound

012525037550020212022202320242025US producer cathode 490COMEX 480LME cash 440Source: USGS, Mineral Commodity Summaries 2026, copper (2025 estimated).
012525037550020212022202320242025US producer cathodeCOMEXLME cash490480440Source: USGS, Mineral Commodity Summaries 2026, copper (2025estimated).
Higher prices help low-grade mines such as Butte, which runs at about 0.225% copper.

Outlook: what to watch at the Butte mine

  • Tailings capacity. In 2023 the company said each 50-foot lift of the Yankee Doodle tailings dam gives eight to ten years of capacity and that it planned to request a 110-foot lift, which would cover the stated 32-year mine life. Permit decisions on that lift are the main driver of how long Butte keeps mining.
  • Power cost. The 2000 shutdown shows how much the mine depends on electricity contracts.
  • Grade changes. Higher-grade zones near 0.5% copper but without molybdenum change the product mix year to year.
  • Critical minerals. MBMG Fact Sheet 2 says the district has remaining ore reserves above 400 million tons and that water, sludge and waste may hold zinc and rare earth elements worth further sampling; zinc in Horseshoe Bend sludge is about 4.3%.
  • Cleanup milestones. EPA continues to update Superfund decisions, such as a residential soil-lead cleanup level amendment listed on its site page in November 2026.
How mining feeds an economy: exports, jobs and revenue

โ–ถ How mining feeds an economy: exports, jobs and revenue ยท 5:03

How consultants use Butte as a reference case

Butte is a useful benchmark for porphyry copper projects in North America because both historic and current data are public. When comparing a project to it, check:

  1. Grade basis. Is the comparison in percent copper, with or without molybdenum credit?
  2. Tonnage unit. Butte reports short tons; most project reports use metric tonnes.
  3. Acid potential. Pyrite-rich, strongly altered rock behaved very differently from the calcite-bearing Continental ore.
  4. Water. Plan for long-term pumping and treatment if the pit floor will sit below the local water table.
  5. Power and logistics. Energy cost made the difference between running and closing in 2000.

For early screening of a new area, satellite imagery can map alteration minerals and old workings before ground crews are sent. Farmonaut offers satellite-based mineral detection for this step, with results treated as exploration targets, not resources. You can request an assessment through the mining query form. If you are weighing a purchase, our guide to a copper mine for sale lists the checks to run.

Frequently asked questions

Is the Butte mine still operating?

Yes. Montana Resources operates the Continental Pit in Butte around the clock, and a 2023 interview described about 45,000 tons of ore milled per day. The Berkeley Pit next to it closed in 1982.

What is being mined in Butte, Montana?

Copper, molybdenum and some silver from the Continental Pit. Historically the district also produced large amounts of zinc and manganese (MBMG, 2023).

Who owns the copper mine in Butte, Montana?

Montana Resources, the company formed after Dennis Washington bought the Continental Pit and other Anaconda properties from ARCO in the mid-1980s.

How much copper does the Butte mine produce a year?

The company said in 2023 that over the previous ten years it typically made about 65 million pounds of copper a year, plus 8 to 9 million pounds of molybdenum.

How much copper has Butte produced in total?

MBMG puts it at 21 billion pounds from 1889 to 1982; the BPSOU history page gives about 21.5 billion pounds from 1880 through 2004.

Why is Butte called the Richest Hill on Earth?

Because of its huge copper output; the NPS says Butte supplied nearly one third of the world’s copper in the early 1900s.

What is the difference between the Berkeley Pit and the Continental Pit?

The Berkeley Pit is a closed, flooded pit managed under Superfund. The Continental Pit is the active mine about 2 km east, separated by the Continental fault.

When did copper mining in Butte stop and restart?

ARCO halted mining on 30 June 1983. Montana Resources restarted in June 1986, paused in 2000 and resumed in October 2003.

Can the Berkeley Pit overflow?

PitWatch says no: water is pumped and treated so the level stays below 5,410 feet, the protective level.

What two impacts did Butte copper mining have on other parts of Montana?

It built the smelter town of Anaconda and its railroad, and it left mine waste along the upper Clark Fork River as far as Missoula, now part of the Superfund cleanup.

How long will the Butte mine keep running?

The operator gave a mine life of about 32 years in 2023, depending on approval of further tailings capacity.

More from Farmonaut: contact us.

This page is for information only. It is not investment advice. Production figures are as reported by the operator and press on the dates given.

Authored by: Farmonaut Research & Content Team

Reviewed and verified by: Farmonaut Mining & Mineral Exploration Team

Reviewed November 2026 against MBMG publications, USGS Mineral Commodity Summaries 2026, Montana Resources’ 2023 DEQ filing, US EPA, NPS, PitWatch and BPSOU pages.

Farmonaut mining

Map your mining site from space

Screen a porphyry copper licence for alteration, old workings and pit-scale features before planning ground work.

Farmonaut Mining Pro 3D Target View (Sample, Synthetic Data)

Mining Pro sample view, synthetic data

Sources

  1. Elko Daily, After 150 years, mining continues in Butte (7 July 2023): minedocs.com
  2. Montana Resources, 2023 annual production information to Montana DEQ (January 2024): montanaresources.com
  3. Montana Resources, company website: montanaresources.com
  4. Montana Bureau of Mines and Geology, Fact Sheet 2: Critical mineral commodity potential in the Butte Mining District (2023): mbmg.mtech.edu
  5. Gammons and Duaime, The Berkeley Pit and surrounding mine waters, MBMG: mbmg.mtech.edu
  6. USGS, Mineral Commodity Summaries 2026: Copper: pubs.usgs.gov
  7. USGS, Mineral Commodity Summaries 2026: Molybdenum: pubs.usgs.gov
  8. National Park Service, Butte-Anaconda Historic District: nps.gov
  9. US EPA, Silver Bow Creek – Butte Area Superfund site: epa.gov
  10. PitWatch, Berkeley Pit Public Education Committee: pitwatch.org
  11. Butte Priority Soils Operable Unit, History: bpsou.com
  12. Wikipedia, Berkeley Pit: en.wikipedia.org
  13. Wikipedia, Marcus Daly: en.wikipedia.org



Discussion

Questions, corrections or field experience? Share them below. First-time comments are reviewed before they appear, and your email is never published.

No comments yet. Be the first to add a question or your experience.

Leave a comment

Farmonaut Farmonaut Trusted by 200,000+ users and 100+ businesses 200,000+ users trust us Get started