Every reconnaissance licence, prospecting licence and mining lease in Ghana starts with an online filing at the Minerals Commission. Below: who the Commission is, which mineral right fits your project, the statutory clock from submission to grant, the documents you need, how fees work, and how to check the cadastre before you commit money to a block.

Country Ghana
Regulator Minerals Commission
Law Act 703 + L.I. 2176
Filing Online only
21 haOne cadastral blockthe unit every Ghanaian licence is built from
5Types of mineral rightreconnaissance to small-scale
30 yrsMaximum mining lease termor less, depending on mine life; renewable
10%State free carried interestin mining lease holders (s. 43, Act 703)
Online onlyApplicationspaper not accepted since 1 Nov 2021

The Minerals Commission Ghana process is the only legal route to a mineral right in the country. Whether you want to fly a regional reconnaissance survey, prospect a gold concession in the Ashanti belt, open a sand and stone quarry, or run a small-scale mining operation as a Ghanaian citizen, your application goes to the Minerals Commission, is checked against its mining cadastre, and is decided by the Minister responsible for mines on the Commission’s recommendation.

Try it: Ghana block count and minimum-spend planner โ†’

The rules sit in two documents: the Minerals and Mining Act, 2006 (Act 703) and the Minerals and Mining (Licensing) Regulations, 2012 (L.I. 2176). They are clear on paper. Applicants still lose months to incomplete files, missed deadlines and blocks that turn out to be taken. What follows uses the Commission’s own published procedure and the text of the regulations, in plain language.

“A Ghanaian prospecting licence can cover up to 750 cadastral units: about 157.5 square kilometres of ground.”

๐Ÿ”‘ Open ground and good ground are different questions
The Minerals Commission Ghana cadastre tells you whether ground is legally available. It says nothing about whether the ground is geologically worth holding. Annual mineral right fees and minimum expenditure start on grant, so the best applicants answer both questions before they file.
Ghana Gold Discovery: How Satellite Tech Pinpoints Hidden Deposits

Who the Minerals Commission Ghana is, and who actually grants your licence

Under Article 257(6) of the 1992 Constitution, repeated in section 1 of Act 703, every mineral in its natural state in Ghana belongs to the Republic and is vested in the President in trust for the people. Nobody owns the gold under their farm in a legal sense. What an investor acquires is a mineral right: a licence or lease from the state to explore for, or extract, minerals within a defined area for a defined period.

The Minerals Commission was set up under Article 269 of the Constitution and the Minerals Commission Act, 1993 (Act 450). Its statutory job is to regulate and manage the use of Ghana’s mineral resources and to coordinate mining policy. In practice, the Minerals Commission Ghana team receives and reviews applications, keeps the priority and general registers, runs the cadastre (one of the national mining cadastre portals we compare country by country), publishes notices, and sends a recommendation to the Minister.

The decision itself sits with the Minister responsible for mines, whose portfolio sat within the Ministry of Lands and Natural Resources when we checked in September 2026. Section 5 of Act 703 gives the Minister power to negotiate, grant, revoke, suspend or renew mineral rights, and sections 12 and 100(2) require the Minister to act on the Commission’s advice. One more layer applies to large projects: under Article 268 of the Constitution, every mining lease must be ratified by Parliament.

The other agencies you will meet

  • Ghana Geological Survey Authority (GGSA): set up under the Ghana Geological Survey Authority Act, 2016 (Act 928), which replaced the 1962 Geological Survey Act. It carries out systematic geological mapping and curates national geoscience data. Its maps are the natural first reference before you design a work programme.
  • District Assemblies and traditional authorities: every pending application is copied to the relevant chief, traditional authority or landowner and the District Assembly, and objections are routed through the Assembly.
  • Office of the Administrator of Stool Lands and the Lands Commission: both receive notice of applications. Ground rent on stool lands is collected through the Administrator of Stool Lands.
  • โš  Environmental and other permits: a mineral right does not replace the separate environmental and operating approvals your project needs. Confirm those with the relevant agencies before you plan any field work.
โš  No facilitator can sell you a fast-track
Paying a “facilitator” who promises a fast-tracked licence. The Minerals Commission Ghana process has published statutory timelines, and every step runs through the Commission’s own online system. Nobody outside the Commission and the Ministry can grant, reserve or sell you a mineral right.

The five mineral rights: which Minerals Commission Ghana licence do you need?

Section 111 of Act 703 recognises five kinds of mineral right. They follow the life of a project: look at a region, then search a smaller area in detail, then extract. Picking the right instrument matters, because each carries different area limits, terms, eligibility rules and obligations. The table summarises the Commission’s own mineral-rights page.

Mineral right What it allows Maximum area Term Who can hold it
Reconnaissance Licence (RL) Regional exploration, no drilling or excavation Up to 5,000 contiguous blocks of 21 ha 12 months, renewable Qualifying companies
Prospecting Licence (PL) Searching for and evaluating minerals Up to 750 contiguous blocks (about 157.5 kmยฒ) 3 years, renewable with the area cut to no more than half Qualifying companies
Mining Lease (ML) Extraction of minerals Up to 300 contiguous blocks Up to 30 years depending on mine life, renewable Qualifying companies; Parliament ratifies
Restricted Mining Lease (RML) Building and industrial minerals (clay, sand, granite, salt) Up to 300 contiguous blocks Up to 15 years depending on mine life, renewable Ghanaians; non-Ghanaians only with at least US$10M investment
Small Scale Mining Licence Extraction of minerals on a small scale As prescribed in the regulations 5 years, renewable (see note below) Ghanaian citizens only, aged 18+

A note on small-scale terms: the Commission’s mineral-rights table lists a five-year renewable term, while its small-scale procedure page says the licence is renewed every three years. Check the term written on your own licence and confirm with the Commission’s district office before you plan a renewal.

The size limits span four orders of magnitude. L.I. 2176 caps a reconnaissance application at 5,000 cadastral units or 1,050 kmยฒ, a prospecting licence at 750 units or 157.5 kmยฒ, and a mining lease at 300 units or 63 kmยฒ. A small-scale licence is capped at twelve small-scale cadastral units, which the regulations put at 10.2 hectares (25.2 acres). That is why small-scale and large-scale applicants end up with such different paperwork: one is a plot, the other can be a district.

Maximum area of each Ghanaian mineral right, log scale Reconnaissance Licence 105,000 ha; Prospecting Licence 15,750 ha; Mining Lease 6,300 ha; Restricted Mining Lease 6,300 ha; Small-Scale Mining Licence 10.2 ha. How much ground each mineral right can cover Maximum application area in hectares, logarithmic scale (each gridline is 10ร— the last) 10 ha1001,00010,000100,000 Reconnaissance Licence105,000 ha (5,000 units) Prospecting Licence15,750 ha (750 units) Mining Lease6,300 ha (300 units) Restricted Mining Lease6,300 ha (300 units) Small-Scale Licence10.2 ha (12 small-scale units) Source: Minerals and Mining (Licensing) Regulations, 2012 (L.I. 2176); Minerals Commission mineral-rights page, checked Sep 2026

A reconnaissance licence can be ten thousand times the size of a small-scale licence. The prospecting licence, capped at 750 units, is where most exploration budgets are decided.

Who qualifies for a mineral right in Ghana?

Section 10 of Act 703 limits large-scale mineral rights to bodies incorporated under the Companies Act, 2019 (Act 992) or under the Incorporated Private Partnerships Act. In other words, a foreign investor needs a Ghanaian-registered vehicle before applying. Eligibility rules differ across the region, and our guides to Kenya’s cadastre licences and Nigeria’s mineral titles set out theirs. Two further rules shape who can apply for what in Ghana:

  • Restricted (industrial) minerals are generally reserved for Ghanaian citizens (s. 78). A non-Ghanaian may hold one only where the proposed investment is at least US$10 million (s. 79), and failing to spend it on time can lead to cancellation.
  • Small-scale mining licences go only to Ghanaians: an individual, a group of persons, a co-operative society or a company. Every natural person involved must be at least 18 (ss. 83 and 85).
  • โš  False statements have a lasting cost. Under L.I. 2176, if an application is rejected or a right terminated because of a false or misleading statement, the applicant cannot apply again for at least 180 days.

Block count is where licensing and money meet. Every Ghanaian licence is a set of whole 21-hectare units, the size caps above apply, and L.I. 2176 sets a minimum spend for reconnaissance and prospecting work at ten times the annual mineral right fee for each unit held. The planner below does that arithmetic. Enter the per-unit annual fee from the Commission’s current schedule, because we have not quoted cedi amounts.

Interactive

Ghana block count and minimum-spend planner

ha

GHโ‚ต
—

Assumptions: one cadastral unit is 21 ha; caps of 5,000, 750 and 300 units and the ten-times minimum-expenditure rule come from L.I. 2176 (regulation 4(2) and the licence chapters). At a prospecting licence extension the area may not exceed half the existing blocks, unless the licence has 125 blocks or fewer. Real blocks follow the grid, so irregular outlines need more units. Fees are not included by us; take them from the Minerals Commission and confirm before you pay. General information, not legal advice.

Find Hidden Minerals by Satellite | Farmonaut Detection

If you already have a block in mind, you can get a satellite read on it while you prepare the paperwork. Draw it on mining.farmonaut.com (Map Your Mining Site), or send the coordinates through our mining query form for a quote.

The Minerals Commission Ghana portal: searching the cadastre and filing online

Ghana’s mining cadastre runs on the Mining Cadastre Administration System (MCAS) built by the Revenue Development Foundation. Its public face, according to the Commission’s cadastre page, is the online repository at miningrepository.mincom.gov.gh, first launched in July 2016, with a public map at miningrepository.mincom.gov.gh/map. The map shows existing mineral rights and the payments made against them, so anyone can check who holds a block before talking to a vendor or a landowner.

Since 1 November 2021 the Commission no longer accepts paper applications. Everything now goes through the portal, reached by single sign-on at sso.revenuedev.org. According to the Commission’s notice on online submissions, the online channel covers:

  • New and renewal applications for large- and small-scale mineral rights.
  • Permits, licences, approvals and authorisations, including mineral dealing licences.
  • Mine support service registrations for contractors and service companies.
  • Cartographic and legal searches and general information requests.
  • Reports, documents and statutory returns from existing licence holders.

Minerals Commission Ghana portal registration is tied to an official company email address. Companies send that address to the Commission, the Commission validates it (sometimes by phone), and only then can the company register on the portal. All later submissions go from that registered address. For small-scale fees, the Commission also accepts mobile-money transfers.

๐Ÿ’ก Get the company email validated first
Get your official email validated before you need to file. Ghana records applications in a priority register, and a conflicting application recorded ahead of yours can cost you the block. Account set-up is the one delay you can remove completely by starting early.

The old address www.mincom.gov.gh/mcas no longer works. If you land on an unofficial copy of the cadastre, go back to the Commission’s main site and follow its links. Other African registries work along similar lines; the Tanzania cadastre portal guide is a useful comparison for anyone holding ground in both countries.

Modern Gold Rush: Inside the Global Race for Gold | Documentary

Minerals Commission Ghana application steps and timelines

The Commission publishes an eight-step path for large-scale applications, and L.I. 2176 fills in the detail. The same statutory clock applies, with small differences, to reconnaissance licences, prospecting licences and leases. Here is how a typical Minerals Commission Ghana application moves, with the day counts the Commission and the regulations give.

Statutory stages of a Minerals Commission Ghana large-scale application Review 5 days, error notice 5 days, objections 21 days after gazette, Commission recommendation 30 days, Minister decision 60 days, notification 21 days, fee payment 60 days, licence issue 30 days. How long each stage may take (maximum days, as published) Large-scale mineral right, Minerals Commission procedure and L.I. 2176 1. Review of application5 2. Notice of errors5 3. Gazette + objection window21 4. Commission considers30 5. Minister’s decision60 6. Notice to applicant21 7. Applicant pays fees60 8. Licence issued30 Gold = Minister’s stage; grey = applicant’s own payment window. Gazetting time itself is not published and is not shown. Source: Minerals Commission licence procedure page and L.I. 2176, checked Sep 2026

Add the stages together and a clean large-scale Minerals Commission Ghana application can run for several months before a licence is issued, even when every deadline is met.

Step 1: submit a complete application online

You file on the portal and pay the application fee. The Commission records the application and has 5 days to review it. The review checks that the area is correctly identified and the coordinates follow the cadastre’s geographic rules. It also checks that the area doesn’t conflict with other rights, pending applications or reserved, restricted or protected areas, that the documents are complete and that fees are paid.

Step 2: correct any errors within 10 days

If something is wrong, the Commission sends a notice within 5 days of its review. Under L.I. 2176, you then have 10 days to fix the errors or supply the missing information. Miss that window and the application is rejected. This is the most common failure point, and it is entirely avoidable.

Step 3: publication and the 21-day objection window

Once an application passes review, the Commission prepares a public notice with a map of the proposed boundary, within 15 days of recording it in the priority register. The notice is published in the Gazette and in a newspaper circulating in the area. It is also given to the chief, traditional authority or landowner and the District Assembly, posted on the Commission’s notice board and on the land itself, and sent to the Administrator of Stool Lands and the Lands Commission. Landowners and lawful occupiers then have 21 days from gazetting to submit written concerns through the District Assembly.

Step 4: the Commission’s recommendation

Within 30 days after the publication period, the Commission considers the application, including any objections, and makes its recommendation to the Minister.

Steps 5 to 8: decision, notice, fees and grant

The Minister decides within 60 days. The Commission notifies the applicant of approval or rejection within 21 days, together with the fees payable on grant. The applicant then has 60 days to pay and to accept the grant in writing. On proof of payment, the licence is issued within 30 days as a signed agreement between the Minister and the holder. Mining leases then go to Parliament for ratification.

โš  Another mineral’s holder gets first refusal on your block
If your application covers ground already held by someone else for a different mineral, the Commission must offer the existing holder the first option to add your mineral to their right. They have 15 days to take it. If they do, your application is rejected without a refund. Always check the Minerals Commission Ghana cadastre for overlapping rights before you pay.

How the small-scale route differs

Small-scale applications, which are for Ghanaians only, start at the Commission’s district offices and follow a slightly different path. After the same 5-day review and 5-day error notice, the application goes to the Mineral Titles Department within 10 days of registration. The department publishes it in the Gazette within 15 days of recording, and the application dossier follows within 10 days of publication. After that, approval and licensing follow the same pattern as large-scale rights. Plot sizes and terms for small-scale titles in Ghana and elsewhere are compared in our artisanal and small-scale mining licence guide.

Nigeria Gold

Documents the Minerals Commission Ghana will ask for

Exact document lists vary by licence type and change from time to time, so always download the current form from the Commission’s site. For a prospecting licence, the Commission lists these core items:

  1. A completed application form in the Commission’s current format.
  2. Certified copies of incorporation documents for the applicant company.
  3. Details of shareholding and directors, so the Commission can check ownership and control.
  4. A site plan stating the size, number of blocks and the cadastral coordinates of the area applied for.
  5. Particulars of the technical team: qualifications and experience of the people who will run the programme.
  6. A certified copy of the reconnaissance licence, if you are converting a reconnaissance licence into a prospecting licence.

A realistic work programme and budget sits behind all of this. L.I. 2176 ties the minimum expenditure under reconnaissance and prospecting licences to the annual mineral right fee, and the Commission checks the proposed programme against that minimum when you apply to extend. A programme with no geological basis is hard to defend at renewal.

๐Ÿ’ก Draw the site plan on the 21 ha grid, not across it
Build the site plan from whole 21-hectare cadastral blocks from the start. Ghana’s regulations check coordinates against the cadastre’s “geographic and geometric rules”, and a boundary that cuts across the grid is a quick way to receive a 10-day error notice.
How Gold is Extracted from Mines | Full Guide

Minerals Commission Ghana fees, rents and ongoing obligations

People searching for “Minerals Commission Ghana fees” usually want one number. In reality there are several separate payments, going to different recipients, at different points in a licence’s life. Amounts are set in the Second Schedule of L.I. 2176 and later fee instruments, and they are revised from time to time. We have deliberately not quoted cedi amounts here. Get the schedule in force from the Commission when you prepare your application, and confirm before paying.

  • Application and processing fees: paid when you file, and generally not refunded if the application fails.
  • Fees on grant: notified with the approval, and payable within 60 days.
  • Annual mineral right fees (s. 24, Act 703): paid every year to the Commission, no later than 90 days before each anniversary of the right. Unpaid fees become a debt to the Republic, and non-payment can terminate the right.
  • Minimum expenditure: for reconnaissance and prospecting licences, you must spend at least ten times the annual mineral right fee per 21-hectare cadastral unit. A bigger licence therefore commits you to a bigger programme; the planner earlier in this guide does the sum.
  • Ground rent (s. 23): paid to landowners. On stool lands, the Administrator of Stool Lands collects and distributes it.
  • Royalties (s. 25): payable by holders of mining leases, restricted mining leases and small-scale licences. The Commission’s Act 703 overview gives the rate as 5% of the total revenue of minerals won. Royalty rules have been revised since that overview was published, so confirm the rate that applies to your mineral.
  • Corporate income tax: the Commission’s overview gives 35% for mining companies.

“In Ghana, a prospecting programme must spend at least ten times the annual fee for every 21-hectare block held.”

๐Ÿ“ˆ 750 weak blocks cost more than 150 good ones
The minimum-expenditure rule makes block count a financial decision, not only a geological one. Holding 750 blocks of weak ground is expensive. Holding 150 well-chosen blocks is cheaper to keep and easier to justify at renewal, when a prospecting licence above 125 blocks must shrink to no more than half its area anyway. This is general information, not investment advice.

Government participation and fiscal agreements

The state takes a 10% free carried interest in the rights and obligations of every mining lease holder (s. 43), with no financial contribution from government. Large investors can also negotiate a stability agreement, lasting up to 15 years, that freezes the fiscal regime for a mining lease holder (s. 48). A development agreement with further negotiated terms needs a proposed investment of at least US$500 million (s. 49). Both need parliamentary ratification.

Transfers, joint ventures and change of control

Any dealing in a mineral right needs the Minister’s approval (s. 14). That covers transfers, joint ventures, option agreements and mortgages. A change of “controller” of a mining lease holder also needs approval (s. 52). A controller is anyone who, alone or with associates, can exercise or control more than 20% of the voting power. A 100% change in control is treated as a transfer. For buyers doing Minerals Commission Ghana due diligence, the lesson is simple: an unapproved deal can leave you owning a company that no longer validly holds the licence.

Renewals, relinquishment and keeping a licence alive

How long each right runs shapes how hard that clock bites. The Commission lists a reconnaissance licence at 12 months, a prospecting licence at 3 years, a small-scale licence at 5 years, a restricted mining lease at up to 15 years and a mining lease at up to 30 years, all renewable. The two leases also scale with mine life, so the figures below are ceilings, not promises.

Initial term of each Ghanaian mineral right, in years Reconnaissance Licence 1 year; Prospecting Licence 3 years; Mining Lease up to 30 years; Restricted Mining Lease up to 15 years; Small-Scale Mining Licence 5 years. How long each right lasts before renewal Initial term in years; the two leases are maximums that depend on mine life 102030 yrs 1 3 up to 30 up to 15 5 ReconnaissanceProspectingMining LeaseRestricted MLSmall-scale Source: Minerals Commission mineral-rights page, checked Sep 2026 (small-scale procedure page says renewal every 3 years)

Exploration rights are short on purpose. A prospecting licence gives you three years to prove the ground before the renewal cut-back.

Getting the licence is half the job. The system is just as strict about keeping one:

  • File extensions early. L.I. 2176 requires an extension application at least 90 days before the licence expires, with a work programme that meets the minimum expenditure.
  • Plan the prospecting licence cut-back. A renewed prospecting licence keeps no more than half its blocks, unless it holds 125 blocks or fewer. Decide early which blocks to keep.
  • โš  Don’t walk away from ground you might want back. You can’t apply for an area you relinquished, or one where your application was revoked, until 180 days have passed.
  • Keep working. The Minister may suspend or cancel a mining lease or restricted mining lease if the holder fails, without good cause, to carry out the programme for two years or more (s. 69). Missed payments, insolvency and false statements are also grounds under s. 68.
  • Plan the exit. When a right ends, mining plant must be removed within six months (or as the Minister allows), or it vests in the Republic. Rehabilitation obligations survive termination.
๐Ÿ”‘ Choose the half you keep before renewal day
The half-area relinquishment at prospecting renewal is where satellite screening pays for itself. If you know which blocks carry the strongest alteration and structural signal, you keep those and drop the rest with confidence, instead of guessing from a few soil lines.

Before you file: check the ground is worth the Minerals Commission Ghana fees

The Minerals Commission Ghana cadastre confirms that a block is open. It cannot tell you whether it is prospective. Because annual fees, minimum expenditure and ground rent begin on grant, a licence over weak ground costs money every year without ever justifying a drill rig. The time to screen an area is before step 1, when you are drawing the site plan.

That is where satellite analysis fits. Our satellite-based mineral detection analyses multispectral and hyperspectral imagery of your polygon. Each mineral and alteration zone reflects energy in its own spectral signature. We use that to flag likely mineralised target zones, alteration halos and structures such as faults and fractures, without anyone setting foot on the land.

  • โœ” Input you already have: the coordinates, KML/KMZ or polygon from your site plan, plus the target mineral.
  • Speed: reports arrive in 5โ€“20 business days, depending on area and mineral complexity. That can fit inside the time you spend preparing the application.
  • Deliverables: prospectivity heatmaps, high-potential zones with estimated location and depth ranges, geological interpretation, and PDF plus georeferenced GIS files. Premium+ adds TargetMaxโ„ข drilling intelligence and 3D subsurface models.
  • Cost and time: satellite screening can cut early-exploration costs by up to 80โ€“85% and shorten timelines from months to days, compared with starting on the ground.
  • โš  Limitation: satellite targets are exploration targets, not a mineral resource. They tell you where to sample and drill first. Field work and drilling confirm them.
๐ŸŒฑ Every application reaches the chief and the District Assembly
Every Ghanaian application is copied to the chief, landowner and District Assembly, and ground rent flows to landowners. Screening from space involves no ground disturbance, so you can learn a lot about a block before any vehicle, pit or trench touches community land. Surface work then goes only where it is likely to be worthwhile.

See a sample of what a deliverable looks like in the satellite-driven 3D mineral prospectivity mapping overview. We have scanned 100,000+ hectares for 20+ mineral types across 25+ countries.

Found an open block on the Ghana cadastre? Check what’s under it.

Send us the same boundary you plan to put in your site plan. We’ll return a satellite prospectivity read, with ranked target zones, geology and next steps, before you commit to fees and a work programme.

A Minerals Commission Ghana pre-application checklist

  1. Register your Ghanaian company (or confirm your small-scale eligibility as a citizen) and get your official email validated by the Commission.
  2. Search the public cadastre map for the area, and note neighbouring licence numbers and any rights over the same ground for other minerals.
  3. Read the Ghana Geological Survey Authority’s maps for the district to understand the regional geology.
  4. Screen prospectivity using the draft boundary, and trim the block count to the strongest ground.
  5. Prepare the site plan in whole 21-hectare blocks with correct cadastral coordinates.
  6. Assemble certified documents, shareholder and director details, and your technical team’s credentials.
  7. Budget for the full life of the licence: grant fees, annual mineral right fees, minimum expenditure, ground rent and renewal.
  8. Diary every deadline: 10 days to fix errors, 60 days to pay on grant, and 90 days before expiry for extensions.

Frequently asked questions

What does the Minerals Commission Ghana do?

The Minerals Commission regulates and manages the use of Ghana’s mineral resources under the Minerals Commission Act, 1993 (Act 450). It receives and reviews applications for mineral rights, runs the mining cadastre and online repository, publishes notices, and recommends grants, renewals and other decisions to the Minister responsible for mines, who makes the final decision.

How do I apply for a gold mining licence in Ghana?

Register a Ghanaian company, get its official email validated by the Commission, then file online through the Minerals Commission repository. Most gold projects start with a reconnaissance or prospecting licence and move to a mining lease once a deposit is defined. Small-scale gold mining licences are reserved for Ghanaian citizens. There is no separate Ghana gold mining license as such: gold is licensed through the same five mineral rights as any other mineral.

What are the Minerals Commission Ghana fees?

There are application fees, fees on grant, annual mineral right fees, ground rent to landowners and, for production, royalties. Amounts are set in the Second Schedule of L.I. 2176 and later fee instruments and are revised from time to time, so get the current schedule from the Commission and confirm before paying.

How long does a mining licence take in Ghana?

The published stages add up to several months for a large-scale right: 5 days’ review, a 21-day objection window after gazetting, 30 days for the Commission, up to 60 days for the Minister, 21 days for notice, 60 days to pay fees and up to 30 days to issue the licence. Mining leases also need parliamentary ratification.

Can a foreigner get a mining licence in Ghana?

A foreign investor can hold large-scale mineral rights through a company incorporated in Ghana. Restricted mining leases for industrial minerals need a proposed investment of at least US$10 million from a non-Ghanaian applicant. Small-scale mining licences are reserved for Ghanaian citizens only.

What does the Ghana Geological Survey Authority do in licensing?

The Ghana Geological Survey Authority does not grant mineral rights. Under Act 928 it carries out geological mapping and curates national geoscience data. Its maps and reports are useful background when you choose an area and design a work programme for your application.

Can Farmonaut apply to the Minerals Commission for me?

No. We are not a licensing agent, law firm or broker, and applications must go through the Minerals Commission’s own portal. What we provide is the geological side: a satellite prospectivity analysis of the area you plan to apply for or already hold, so you can choose blocks and plan exploration with better information.

Reviewed September 2026 against the Minerals Commission’s cadastre, mineral-rights, licence-procedure, prospecting-licence and online-submission pages, its overview of Act 703, the text of L.I. 2176 and the Ghana Geological Survey Authority’s own site.

Licence types, terms, procedures and statutory references in this guide come from the Minerals Commission’s own website, its published overview of the Minerals and Mining Act, 2006 (Act 703), and the Minerals and Mining (Licensing) Regulations, 2012 (L.I. 2176). Fees, royalty rates and procedures change, so confirm the current position with the Minerals Commission before you file or pay. This guide is general information, not legal or investment advice.






Discussion

Questions, corrections or field experience? Share them below. First-time comments are reviewed before they appear, and your email is never published.

No comments yet. Be the first to add a question or your experience.

Leave a comment

Farmonaut Farmonaut Trusted by 200,000+ users and 100+ businesses 200,000+ users trust us Get started