Rio Tinto Mine Sites in WA: Pilbara Mines Map and List

Rio Tinto runs 18 iron ore mines in the Pilbara, grouped in nine hubs and tied to Dampier and Cape Lambert by nearly 2,000 km of rail. Here is each site with its owners, the latest output and the new mines due in 2027.

Authored by Farmonaut Research & Content Team
Reviewed and verified by Farmonaut Mining & Mineral Exploration Team
Updated 12 November 2026 ยท 12 min read
Sentinel-2 Satellite View Of Mount Tom Price Iron Ore Mine, Hamersley Range, Pilbara, Western Australia
Sentinel-2 true-colour composite of Mount Tom Price iron ore mine, Hamersley Range, Pilbara, Western Australia (22.75ยฐS, 117.77ยฐE). Contains modified Copernicus Sentinel data, 2022 to 2026, processed in Google Earth Engine.

Key takeaways

  • Rio Tinto runs 18 Pilbara iron ore mines, 4 port terminals and nearly 2,000 km of rail (Rio Tinto, accessed November 2026).
  • Pilbara shipments were 326.2 Mt in 2025 (100% basis); 2026 guidance is 323-338 Mt (Rio Tinto Q4 2025 and Q3 2026 releases).
  • Three replacement mines (Brockman Syncline 1, Hope Downs 2, West Angelas) are on track for first ore in 2027 (Rio Tinto half-year results, July 2026).
  • Pilbara unit cash costs were US$25.0 per wet tonne FOB in H1 2026, with a realised price of US$92.6 per dry tonne.
  • Iron ore was A$119.0 billion of the Pilbara region’s A$122.8 billion mineral and petroleum value in 2024-25 (DMPE Statistics Digest).
In this article
  1. Rio Tinto mine sites in WA: the full list by hub
  2. Where the Pilbara mines are: reading the map
  3. Rio Tinto Pilbara production and shipments
  4. New and replacement mines: what changes next
  5. Rail, ports and remote operation
  6. Heritage, environment and approvals
  7. Prospecting in the Pilbara: a guide for consultants and small explorers
  8. Frequently asked questions

Short answer. Rio Tinto runs 18 iron ore mines in the Pilbara region of Western Australia (WA), joined by a rail network of nearly 2,000 km to four port terminals at Dampier and Cape Lambert (Rio Tinto, Western Australia operations, accessed November 2026). The mine sites sit in nine hubs: Brockman, Greater Hope Downs, Greater Nammuldi, Greater Paraburdoo, Gudai-Darri, Robe Valley, Tom Price and Marandoo, West Angelas and Yandicoogina. Rhodes Ridge is a large deposit still in study.

This page lists each Rio Tinto mine site in WA with its owners and status, explains how to see them on an official map, gives the latest production numbers, and ends with a short guide for consultants and prospectors who want to work on ground near the Rio Tinto network. Iron ore here means rock rich in the iron oxide minerals hematite and goethite; Pilbara ore is mostly sold as “fines” (crushed ore under about 6 mm) and “lump” (larger pieces), blended at the ports into products such as Pilbara Blend.

Rio Tinto mine sites in WA: the full list by hub

The WA Government lists Rio Tinto’s Pilbara mines under three principal projects: Hamersley Iron, Robe River and Yandicoogina (DMPE Statistics Digest 2024-25, Table 13). Rio Tinto groups the same sites into hubs on its own operations page. The table joins the two lists.

Chart

Yearly capacity of newer and planned Pilbara mines

Million tonnes per annum (Mtpa), 100% basis; Rhodes Ridge at top of study range

01530456043Gudai-Darri35West Angelassustaining34Brockman Syncline131Hope Downs 250Rhodes Ridge phase1Source: Rio Tinto 2026 half-year results (July 2026); Mining Technology (Gudai-Darri).
015304560Gudai-Darri43West Angelas sustaining35Brockman Syncline 134Hope Downs 231Rhodes Ridge phase 150Source: Rio Tinto 2026 half-year results (July 2026); MiningTechnology (Gudai-Darri).
Each replacement mine is sized at 31-35 Mtpa, below Gudai-Darri’s 43 Mtpa nameplate.
Hub Mine sites Ownership (Rio Tinto share) Notes
Tom Price and Marandoo Mount Tom Price, Marandoo, Western Turner Syncline 1 and 2 Hamersley Iron, 100% Mount Tom Price sent the first ore train to the coast in June 1966
Greater Paraburdoo Paraburdoo, Channar, Eastern Range, Western Range Hamersley Iron 100%; Western Range joint venture 54% Near the town of Paraburdoo, south of Tom Price
Brockman Brockman 4; Brockman Syncline 1 under construction 100% Brockman Syncline 1: up to 34 Mtpa, first ore planned for 2027
Greater Nammuldi Brockman 2, Nammuldi, Silvergrass Hamersley Iron, 100% About 100 km north-west of Tom Price
Greater Hope Downs Hope Downs 1, Hope Downs 4; Hope Downs 2 being built 50% with Hancock Prospecting Near Newman; Hope Downs 2 (31 Mtpa) shipped first ore by road train in February 2026
Gudai-Darri Gudai-Darri (formerly Koodaideri) Hamersley Iron, 100% Rio Tinto’s newest Pilbara mine; first ore June 2022, 43 Mtpa nameplate
Yandicoogina Yandicoogina Rio Tinto Produces Hamersley Iron Yandi (HIY) fines
Robe Valley Mesa A, Mesa J Robe River joint venture, 53% net West Pilbara, served from Cape Lambert
West Angelas West Angelas Robe River: Rio Tinto 53%, Mitsui 33%, Nippon Steel 14% 35 Mtpa sustaining project, first ore planned for 2027
Rhodes Ridge (project) Rhodes Ridge 50% with Mitsui 40% and AMB Holdings 10% Feasibility study for 40-50 Mtpa runs to 2029; first ore aimed at the end of the decade

Ownership and project data come from the Rio Tinto 2026 half-year results (July 2026). The note there explains that the Pilbara segment is Rio Tinto’s holding in Hamersley Iron, the Hope Downs joint venture (50%), the Western Range joint venture (54%) and Robe River Iron Associates (65% gross, 53% net beneficial). Mtpa means million tonnes per annum, the yearly capacity of a mine or plant. A “syncline” is a downward fold in the rock layers; the Brockman and Turner synclines are folds of the Brockman Iron Formation that hold thick ore.

Other Rio Tinto sites in Western Australia

Iron ore is not Rio Tinto’s only business in the state. The same operations page lists Dampier Salt (solar salt at Dampier and Port Hedland), the Mt Cattlin lithium mine near Ravensthorpe in the south of the state, the closed Argyle diamond mine in the Kimberley (mining ceased in 2020) and Winu, a copper-gold project about 320 km east of Port Hedland. Readers searching for “Rio Tinto mines in Western Australia” usually mean the iron ore hubs, but these four sites complete the list.

Where the Pilbara mines are: reading the map

The Pilbara covers about 508,000 kmยฒ of north-west Australia (Pilbara, Wikipedia). Rio Tinto’s mines lie mostly in the Hamersley Range, which Rio Tinto says holds around 80% of Australia’s identified iron ore reserves. Think of the network in five groups:

  • West and central Hamersley: Tom Price, Marandoo, Western Turner Syncline, Paraburdoo, Channar, Eastern Range, Western Range, Brockman 2 and 4, Nammuldi and Silvergrass, clustered within about 100 km of the town of Tom Price.
  • East Pilbara near Newman: Hope Downs 1 and 4, West Angelas, Yandicoogina, plus Rhodes Ridge and the future Hope Downs 2.
  • North: Gudai-Darri, linked by a new 166 km rail spur to the main line (Mining Technology).
  • Robe Valley: Mesa A and Mesa J in the west, near Pannawonica.
  • Coast: four shipping terminals at two locations, Dampier and Cape Lambert near Wickham, where all ore leaves by ship.

To see exact mine outlines, use the state’s own tools rather than a static image. The DMPE Operating Mines dataset and the MINEDEX database show each site with its owner and commodity, and GeoVIEW.WA lays mines, tenements and geology over satellite imagery. Our Australia mining map guide explains these layers step by step, and our list of lithium and gold mines in Western Australia covers the state’s other principal projects. A Sentinel-2 satellite view of the Mount Tom Price area sits at the top of this page.

Rio Tinto Pilbara production and shipments

The Pilbara system produced 327.3 Mt and shipped 326.2 Mt of iron ore in 2025 on a 100% basis, near the lower end of the 323-338 Mt guidance (Rio Tinto Q4 2025 production results). Fourth-quarter 2025 production of 89.7 Mt was a quarterly record.

Chart

Value of Pilbara region output by commodity

A$ billion, 2024-25

A$0.0BA$30.0BA$60.0BA$90.0BA$120.0BIron oreA$119.0BSpodumene and tantalumA$1.4BGoldA$1.1BSaltA$0.6BManganese and copperA$0.5BSource: DMPE (Government of Western Australia), Statistics Digest 2024-25, Table 7.
A$0.0BA$30.0BA$60.0BA$90.0BA$120.0BIron oreA$119.0BSpodumene and tantalumA$1.4BGoldA$1.1BSaltA$0.6BManganese and copperA$0.5BSource: DMPE (Government of Western Australia), StatisticsDigest 2024-25, Table 7.
Iron ore was about 97% of the Pilbara region’s mineral and petroleum value.

Chart

Pilbara iron ore, first half of the year

Million tonnes, 100% basis

H1 2025H1 20260.0 Mt50.0 Mt100.0 Mt150.0 Mt200.0 MtProduction153.5 Mt162.3 MtShipments150.6 Mt157.7 MtSource: Rio Tinto 2026 half-year results (July 2026).
H1 2025H1 20260.0 Mt50.0 Mt100.0 Mt150.0 Mt200.0 MtProduction153.5 Mt162.3 MtShipments150.6 Mt157.7 MtSource: Rio Tinto 2026 half-year results (July 2026).
Production rose 6%, the highest first half since 2018; shipments rose 4%.

In the first half of 2026, production rose 6% to 162.3 Mt and sales 4% to 157.7 Mt, the best first half since 2018. In the third quarter Pilbara production was 83.4 Mt and sales 85.7 Mt, taking year-to-date production to 245.7 Mt (Rio Tinto Q3 2026 production results, October 2026). The 2026 guidance for Pilbara sales stays at 323-338 Mt, and Rio Tinto notes it depends on approvals for new mining areas and heritage clearances.

Costs and prices from the half-year report give the margin picture. Pilbara unit cash costs were US$25.0 per wet tonne on an FOB basis (cost with the ore loaded on the ship) in the first half of 2026, against guidance of US$23.5-25.0. The average realised Pilbara price was US$92.6 per dry tonne (US$85.2 per wet tonne). For the wider market, the KORE 62% Fe index at Qingdao was US$90.3 per tonne CFR (delivered to China) on 27 October 2026, down 6.1% over the month, according to Kallanish data reported by GMK Center. Check today’s price before using it; it moves daily.

How big the Pilbara is for Western Australia

WA sold 864 million tonnes of iron ore worth A$122 billion in 2024-25 (DMPE Statistics Digest). Iron ore made up A$119.0 billion of the Pilbara region’s A$122.8 billion mineral and petroleum value that year, far above spodumene (A$1.4 billion) and gold (A$1.1 billion). On-site mining employment in the Pilbara reached 70,659 full-time equivalent jobs, up from 61,268 four years earlier.

Farmonaut explainer: what mining adds to an economy, from exports to jobs.

โ–ถ Farmonaut explainer: what mining adds to an economy, from exports to jobs. ยท 5:03

New and replacement mines: what changes next

Older pits are running down, so Rio Tinto is building three replacement mines and studying a fourth. All three under construction are on budget and on track for first ore in 2027, according to the half-year report:

  1. Brockman Syncline 1 (100%): US$1.8 billion, up to 34 Mtpa, approved March 2025, extends the Brockman area.
  2. Hope Downs 2 including Bedded Hilltop (50% with Hancock Prospecting): 31 Mtpa, approved June 2025, extends Hope Downs 1. First ore was trucked in February 2026, ahead of schedule.
  3. West Angelas sustaining project (Robe River joint venture): 35 Mtpa, approved October 2025, keeps the West Angelas hub running.
  4. Rhodes Ridge (50%): feasibility study started in Q1 2026 for 40-50 Mtpa, to finish in 2029, using Rio Tinto’s existing rail, port and power.

Gudai-Darri, the last major new mine, reached its 43 Mtpa nameplate less than 12 months after first ore, and Rio Tinto set out a low-capital plan to lift it to 50 Mtpa for about A$130 million (Australian Mining Review, 2023).

Rail, ports and remote operation

The Rio Tinto rail system is the largest privately owned and operated network in Australia, with mainlines of nearly 2,000 km serving the 18 mines. Since 2018 its trains have run on AutoHaul, which Rio Tinto calls the world’s first automated heavy-haul rail network, able to move more than one million tonnes of ore a day. About 90% of the Pilbara haul truck fleet is autonomous, and 40 autonomous production drills run across 7 sites, all controlled from an operations centre in Perth about 1,500 km away. Four power stations (Paraburdoo, Yurralyi Maya, West Angelas and Cape Lambert) supply the mines and towns. Rio Tinto also owns more than 2,700 houses in Dampier, Karratha, Wickham, Pannawonica, Tom Price and Paraburdoo.

Chart

On-site mining jobs in the Pilbara

Full-time-equivalent positions, financial years

020,00040,00060,00080,0002020-212021-222022-232023-242024-25Pilbara FTEs 70,659Source: DMPE (Government of Western Australia), Statistics Digest 2024-25, Table 11.
020,00040,00060,00080,0002020-212021-222022-232023-242024-25Pilbara FTEs70,659Source: DMPE (Government of Western Australia), StatisticsDigest 2024-25, Table 11.
Pilbara mining jobs grew by about 9,400 in four years.

The four shipping terminals sit at two locations, Dampier and Cape Lambert, and are managed as a single port system. That is why mine plans for the region always start from distance to rail: a deposit far from an existing line needs a spur like Gudai-Darri’s 166 km before it can ship.

Heritage, environment and approvals

Any map of Rio Tinto’s mine sites in WA also shows Aboriginal land. The Brockman hub, for example, lies on the lands of the Puutu Kunti Kurrama and Pinikura and the Muntulgura Guruma Peoples. In May 2020 Rio Tinto destroyed the Juukan Gorge rock shelters, which had evidence of human occupation going back about 46,000 years, while expanding the Brockman 4 mine (Juukan Gorge, Wikipedia). A federal parliamentary inquiry followed. Since then, Rio Tinto’s guidance has carried a standing note that Pilbara volumes depend on heritage clearances and approvals for new mining areas, and the company has signed co-management agreements with Traditional Owner groups.

For consultants, the lesson is practical: heritage surveys, Native Title agreements and environmental referrals often set the timetable of a Pilbara project more than drilling does. Dust, water and threatened species plans are published on Rio Tinto’s Pilbara downloads page.

Farmonaut explainer: the seven environmental impacts of mining.

โ–ถ Farmonaut explainer: the seven environmental impacts of mining. ยท 2:31

Prospecting in the Pilbara: a guide for consultants and small explorers

The Pilbara also holds gold, lithium, copper and manganese, so many readers want to know where they can look. The short version: Rio Tinto’s mining leases are closed to outsiders, but much of the region is open for exploration under WA’s Mining Act once you hold the right title and permissions.

  1. Check the ground status first. Use Tengraph or GeoVIEW.WA to see live tenements (mining leases, exploration licences, prospecting licences), pastoral leases, reserves and Native Title determinations. Land already held by Rio Tinto or another company is not open to you.
  2. Read the geology. GeoVIEW.WA and the WAMEX library hold past company reports and drill results. The Hamersley Range is iron ore country; gold and lithium targets lie mostly in the older granite-greenstone terrain of the northern and eastern Pilbara.
  3. Choose the right title. A Miner’s Right lets an individual prospect on open Crown land; an exploration or prospecting licence gives exclusive rights over an area. Both come from DMPE.
  4. Get permission and agreements. Pastoral lessees must be notified, and heritage obligations apply everywhere. Never enter an operating mine lease or rail corridor.
  5. Screen before you spend. Satellite data can rank ground before you visit: iron-oxide and clay signatures, structure and old workings show up from orbit. Farmonaut offers satellite-based mineral detection for licence areas.
  6. Budget for remoteness. Distances between Pilbara towns run to hundreds of kilometres, summer heat is extreme and cyclones close roads and ports, as the Q1 2026 weather showed in Rio Tinto’s own output.

The calculator below helps an analyst size the cash margin of an iron ore operation from shipments, price and cost; it is a simple check, not a valuation. For iron ore basics, see our guide to the types of iron ore.

Calculator

What cash margin does an iron ore operation make?

Enter shipments, price and unit cash cost.

Mt (wet)

US$/wmt FOB

US$/wmt FOB
$3,000,000,000US$ cash margin for the year
  • Revenue (US$): $4,250,000,000
  • Cash costs (US$): $1,250,000,000
  • Margin as share of revenue: 70.6%

Example values only, not a forecast. Default cost and price follow Rio Tinto’s H1 2026 Pilbara figures (US$25.0/wmt cost; US$85.2/wmt realised price). The price is an example: use today’s price. Royalties, freight, sustaining capital and tax are not deducted.

Farmonaut explainer: reading GeoVIEW.WA, WAMEX, MINEDEX and Tengraph before prospecting in WA.

โ–ถ Farmonaut explainer: reading GeoVIEW.WA, WAMEX, MINEDEX and Tengraph before prospecting in WA. ยท 4:13

Frequently asked questions

How many mines does Rio Tinto have in the Pilbara?

Rio Tinto says it runs 18 iron ore mines in the Pilbara, linked to four port terminals by nearly 2,000 km of rail. They are grouped into nine hubs, with Rhodes Ridge as a further project.

Where are Rio Tinto mine sites in WA located?

Most are in the Hamersley Range of the Pilbara: around Tom Price and Paraburdoo, near Newman in the east, at Gudai-Darri in the north and in the Robe Valley near Pannawonica. Ore ships from Dampier and Cape Lambert.

What is Rio Tinto’s newest mine in Western Australia?

Gudai-Darri, which produced first ore in June 2022 and has a 43 Mtpa nameplate. Hope Downs 2, Brockman Syncline 1 and the West Angelas sustaining project are due to start production in 2027.

Is there an official map of Rio Tinto Pilbara mines?

Rio Tinto’s operations page lists the hubs. For an accurate map, use the WA Government’s Operating Mines dataset, MINEDEX or GeoVIEW.WA, which show mine sites and tenements over imagery.

How much iron ore does Rio Tinto ship from the Pilbara?

326.2 Mt in 2025 on a 100% basis. Guidance for 2026 is 323-338 Mt, and sales to the end of September 2026 were 243.3 Mt.

Who owns the Rio Tinto Pilbara mines with Rio Tinto?

Hancock Prospecting owns 50% of Hope Downs; Mitsui and Nippon Steel are partners in the Robe River joint venture; Western Range is a joint venture in which Rio Tinto holds 54%; Mitsui and AMB Holdings share Rhodes Ridge.

Which ports does Rio Tinto use in the Pilbara?

Four independent terminals at two locations, Dampier and Cape Lambert, managed as a single port system.

What happened at Juukan Gorge?

In May 2020 Rio Tinto destroyed rock shelters at Juukan Gorge, with about 46,000 years of human occupation evidence, during the Brockman 4 expansion. The event led to a parliamentary inquiry and changes in how heritage is handled in the Pilbara.

Can I prospect near Rio Tinto mines?

Not on Rio Tinto’s leases or rail corridors. On open Crown land elsewhere in the Pilbara you need a Miner’s Right or a licence from DMPE, plus notice to pastoral lessees and respect for heritage rules. Check tenements on Tengraph first.

Does Rio Tinto mine anything other than iron ore in WA?

Yes: salt at Dampier and Port Hedland, lithium at Mt Cattlin, and the Winu copper-gold project in the Pilbara. The Argyle diamond mine closed in 2020.

Questions about a specific area? Send them through our mining query form.

More from Farmonaut: contact us, rio tinto pilbara mines map pilbara prospecting guide.

This page is for information only. It is not investment advice or legal advice. Ownership, status and output figures change; confirm them with Rio Tinto’s latest reports and with DMPE. Prospecting needs the permission of the tenement holder and the regulator, heritage obligations apply, and mercury must never be used.

Authored by: Farmonaut Research & Content Team

Reviewed and verified by: Farmonaut Mining & Mineral Exploration Team

Reviewed November 2026 against Rio Tinto’s operations page, 2026 half-year results and Q4 2025 / Q3 2026 production releases, and the DMPE Statistics Digest 2024-25.

Farmonaut mining

Map your Pilbara ground from space

Map a licence or project area with satellite data and get ranked exploration targets before field work.

Farmonaut Mining Pro 3D Target View (Sample, Synthetic Data)

Mining Pro sample view, synthetic data

Sources

  1. Rio Tinto, Western Australia operations and projects (accessed November 2026): riotinto.com
  2. Rio Tinto, 2026 half-year results (July 2026): riotinto.com
  3. Rio Tinto, third quarter 2026 production results (October 2026): riotinto.com
  4. Rio Tinto, fourth quarter 2025 production results (January 2026): riotinto.com
  5. DMPE (Government of Western Australia), Statistics Digest 2024-25: wa.gov.au
  6. Mining Technology, Gudai-Darri iron ore project: mining-technology.com
  7. Australian Mining Review, Rio Tinto to increase Gudai-Darri capacity to 50 Mtpa (2023): australianminingreview.com.au
  8. GMK Center, iron ore prices in the second half of October 2026 (citing Kallanish): gmk.center
  9. Wikipedia, Juukan Gorge: en.wikipedia.org
  10. Wikipedia, Pilbara: en.wikipedia.org
  11. Wikipedia, Hamersley & Robe River railway: en.wikipedia.org
  12. Parliament of Australia, Joint Standing Committee on Northern Australia, Never Again, interim report on the destruction of caves at Juukan Gorge (December 2020): aph.gov.au



Discussion

Questions, corrections or field experience? Share them below. First-time comments are reviewed before they appear, and your email is never published.

No comments yet. Be the first to add a question or your experience.

Leave a comment

Farmonaut Farmonaut Trusted by 200,000+ users and 100+ businesses 200,000+ users trust us Get started