Papua New Guinea gold ยท Mine profile
Simberi Gold Mine: Owners, Output and Expansion
Simberi produced 48,395 ounces of gold in the year to June 2026 (St Barbara, 2026). A US$333 million sulphide expansion aims for more than 200,000 ounces a year, while ownership passes to Lingbao Gold and PNG’s Kumul.

Key takeaways
- Simberi is an open-pit gold mine on Simberi Island, Tabar Group, New Ireland Province, Papua New Guinea.
- Output was 48,395 oz in the year to June 2026 and 10,746 oz in the September 2026 quarter, 100% basis (St Barbara, 2026).
- St Barbara agreed in September 2026 to sell its remaining interest to Lingbao Gold for A$410 million cash, keeping a 2.75% NSR royalty.
- Ore reserves are 2.47 Moz at 1.8 g/t, about three quarters in sulphide ore (feasibility study, reserves at 30 September 2025).
- First sulphide ore is targeted for mid-2028, with output planned above 200 koz a year from FY29.
In this article
- Where is the Simberi gold mine located?
- Simberi gold mine today: owners, output and the expansion
- Who owns the Simberi mine now
- Simberi production by quarter
- Simberi geology: epithermal gold on a volcanic island
- Resources and reserves: oxide versus sulphide
- How Simberi mines and processes gold
- The sulphide expansion: cost, timeline and output plan
- Tailings, water and the island environment
- Community and local economy
- What consultants and investors should check
- Frequently asked questions
The Simberi gold mine is an open-pit gold and silver mine on Simberi Island, the northernmost island of the Tabar Group in New Ireland Province, Papua New Guinea (PNG). It produced 48,395 ounces of gold in the year to June 2026 and 10,746 ounces in the September 2026 quarter, both on a 100% basis (St Barbara September quarter report, October 2026). A US$333 million expansion to treat deeper sulphide ore is under construction, with first sulphide ore planned for mid-2028 and output planned to rise above 200,000 ounces a year.
This page sets out where the mine is, who owns it after the Lingbao Gold deals, quarterly production, the resource and reserve split, the expansion timeline and the points a consultant or investor should check. Every figure carries its date and source, and a calculator at the end of the expansion section turns the planned output into royalty and revenue numbers.
Where is the Simberi gold mine located?
Simberi Island sits in the Bismarck Archipelago, about 40 km north of the main island of New Ireland. The Tabar Group is a short chain of three main islands: Simberi in the north, Tatau in the centre and Big Tabar in the south (Tabar Group). Simberi is the smallest of the three, about 9 km long and 7 km wide, with an area of roughly 40 square kilometres and about 1,100 residents in coastal villages (Simberi Island).
The pits lie in the volcanic highlands on the eastern side of the island, inside Mining Lease 136 (ML136). Exploration licence EL609 covers the rest of Simberi Island plus Tatau and Big Tabar islands, and the smaller licence EL2462 covers parts of Tatau and Mapua islands (St Barbara, October 2026). Administratively the island falls under Namatanai District and the Sentral Niu Ailan Rural Local Level Government.
Everything reaches the island by sea or air. There is no road link to New Ireland, so fuel, reagents, spare parts and the new grinding mill all arrive by ship, which is why a new wharf is part of the expansion. The operating company is Simberi Gold Company Limited, the PNG entity named in the feasibility study as the owner of the power station.
Simberi gold mine today: owners, output and the expansion
In short: Simberi is a small, high-cost oxide operation in transition to a larger, lower-cost sulphide operation, and its ownership is moving from an Australian company to a Chinese one with a PNG state partner.
| Item | Latest figure | Date and source |
|---|---|---|
| Gold production, year to June 2026 | 48,395 oz (100% basis) | St Barbara, July 2026 |
| Gold production, September 2026 quarter | 10,746 oz at AISC A$6,011/oz | St Barbara, October 2026 |
| Ore reserves | 43.1 Mt at 1.8 g/t Au for 2.47 Moz | Feasibility study, as at 30 September 2025 |
| Mineral resources (inclusive) | 137.7 Mt at 1.3 g/t Au for 5.83 Moz | Feasibility study, as at 30 September 2025 |
| Expansion capital | US$333 million (final investment decision) | St Barbara, July 2026 |
| First sulphide ore | Mid-calendar 2028 (target) | St Barbara, October 2026 |
| Planned output | Above 200,000 oz a year from FY29, 13-year mine life | Feasibility study, December 2025 |
AISC means all-in sustaining cost: the cash cost of producing an ounce plus the sustaining capital needed to keep the mine running. Ounces here are troy ounces (31.1 g). The g/t figure is the grade, grams of gold per tonne of rock.
Who owns the Simberi mine now
Ownership has changed several times. Allied Gold poured first gold in February 2008, and St Barbara, an Australian gold miner listed on the ASX (ticker SBM), took over Allied Gold in September 2012. Earlier explorers on the islands included CRA, BHP, Kennecott, Nord Pacific and Barrick (St Barbara, October 2026).
- April 2026: St Barbara received A$389 million from China’s Lingbao Gold Group, which took a 50% interest in the renamed New Simberi Gold Project, and the partners approved the expansion (Mining Technology, April 2026).
- Kumul deal: Eda Minerals, a subsidiary of PNG state miner Kumul Mineral Holdings, agreed in December 2025 to buy 20% of New Simberi for A$100 million. Once that completes, St Barbara’s attributable share would fall to 40%. The Kumul deal still needed PNG approvals; St Barbara reported its attributable share at 50% for the September 2026 quarter.
- September 2026: St Barbara signed a binding agreement to sell its remaining interest in Tabar Islands Holdings, the company that owns New Simberi and the Tabar exploration licences, to Lingbao for A$410 million cash plus about A$43 million repayment of construction funding (St Barbara ASX release, 10 September 2026).
- Royalties kept: St Barbara keeps a 2.75% net smelter return (NSR) royalty on all future gold and silver from New Simberi and a 1.5% NSR on minerals from the Tabar Island Group licences. An NSR royalty is a share of metal sales after smelting and refining charges.
Completion of the Lingbao sale is targeted for the March 2027 quarter, subject to approvals in PNG and China. After that, Simberi would be owned by Lingbao and Kumul, with St Barbara holding only royalties. Searches for “Simberi Gold Company Ltd” usually refer to the PNG operating company, which stays in place through these changes.
Simberi production by quarter
Quarterly output in the 2026 financial year (July 2025 to June 2026) ranged from 9,057 to 14,658 ounces. The rise in the second half came from higher mined grade and better recovery. In the September 2026 quarter, output fell to 10,746 ounces because an unusually strong El Niรฑo cut rainfall, and the mill relies on water collected from the open pits (St Barbara, October 2026).
Chart
Simberi gold production by quarter
Ounces, 100% basis, quarters to September 2026
| Quarter (100% basis) | Ore milled (kt) | Milled grade (g/t) | Recovery (%) | Gold (oz) | AISC (A$/oz) |
|---|---|---|---|---|---|
| September 2025 | 469 | 1.03 | 72 | 11,158 | 4,487 |
| December 2025 | 404 | 0.95 | 74 | 9,057 | 6,518 |
| March 2026 | 494 | 1.09 | 78 | 13,522 | 4,323 |
| June 2026 | 589 | 1.00 | 77 | 14,658 | 4,514 |
| September 2026 | 533 | 0.88 | 72 | 10,746 | 6,011 |
Recovery is the share of gold in the mill feed that ends up in the gold bars (dorรฉ). A recovery of 72-78% is low for an oxide carbon-in-leach plant and is one reason the partners brought forward an upgrade of the leach circuit. Total mining rose 45% in the September 2026 quarter to 3,572 kt after more trucks and excavators arrived, which matters because the pits must reach sulphide ore on time. Gold sales in that quarter were 9,270 ounces at an average A$6,053 an ounce.
For scale, gold traded at about US$3,870 an ounce on 12 November 2026 (Kitco spot bid). At current output, Simberi is a small producer by PNG standards; the expansion is what would make it a mid-tier mine.
Simberi geology: epithermal gold on a volcanic island
The Tabar-Feni island chain is a line of volcanoes formed over the last 3.7 million years. St Barbara describes the Simberi deposits as low-sulphidation, intrusion-related adularia-sericite epithermal gold deposits, hosted mainly in andesite, volcanic breccias and lesser porphyry (St Barbara, October 2026). Epithermal deposits form at shallow depth from hot fluids circulating above a magma body; for background, see our guide to epithermal gold deposits, their styles and exploration.
Gold sits in fracture fillings, vein coatings, crackle breccias and disseminated sulphides. Near the surface, tropical weathering has oxidised the rock, releasing gold from sulphide minerals so that cyanide can dissolve it directly. Ore of this kind leaches readily without pre-treatment. Below it lies fresh sulphide ore, where gold is locked inside pyrite and similar minerals and needs flotation before leaching. Our explainer on oxidized gold ore covers why that weathered cap is cheaper to treat.
The main deposits on ML136 are Sorowar, Pigiput, Pigibo, Botlu South and the Samat group, all within 2-3 km of each other on ridge tops (Simberi Island). Drilling between Sorowar and Pigiput has hit 20-100 m zones of carbonate-quartz base-metal and gold veining, similar to the style on Tatau and Big Tabar, which were explored for copper-gold porphyry under a 2016-2019 option with Newcrest. For a wider view of how deposit types compare, see types of ore deposits and types of gold deposits.
Resources and reserves: oxide versus sulphide
A mineral resource is the gold estimated to be in the ground with reasonable prospects of mining; an ore reserve is the part that a mine plan shows can be mined at a profit. At 30 September 2025, the feasibility study reported resources of 137.7 Mt at 1.3 g/t gold for 5.83 million ounces, plus 15.35 million ounces of silver, inside a US$2,500/oz pit shell (St Barbara feasibility study, December 2025).
Chart
Simberi ore reserves by ore type
Contained gold, thousand ounces, as at 30 September 2025
| Ore reserve (30 Sep 2025) | Tonnes (Mt) | Gold grade (g/t) | Gold (koz) | Silver (koz) |
|---|---|---|---|---|
| Oxide | 15.0 | 1.1 | 530 | 840 |
| Sulphide | 26.8 | 2.2 | 1,880 | 3,710 |
| Stockpile | 1.4 | 1.4 | 60 | n/a |
| Total | 43.1 | 1.8 | 2,470 | 4,560 |
About three quarters of the reserve ounces are in sulphide ore, at twice the grade of the oxide. That is the core of the expansion case: the mine has been running on the lower-grade oxide cap, and the richer ore below needs a different plant. Reserves used a gold price of US$2,000/oz, well below the price in late 2026. The cut-off grade, the lowest grade worth sending to the mill, was set by a zero net-revenue rule. Forty-three percent of planned production comes from Proved reserves and 57% from Probable.
How Simberi mines and processes gold
Simberi is a conventional truck-and-excavator open-pit mine. In the 2026 financial year it moved 9.34 Mt of rock, of which 2.30 Mt was ore at an average mined grade of 0.98 g/t, a strip ratio (waste to ore) of about 3:1 (St Barbara, October 2026). A rope conveyor is part of the ore-handling system and was refurbished during the 2021 shutdown.
The current plant is a carbon-in-leach (CIL) circuit: ground ore is mixed with a weak cyanide solution in tanks containing activated carbon, the carbon absorbs dissolved gold, and electrowinning then recovers it as dorรฉ bars. After the expansion, a new 5.8 MW ball mill will grind the harder sulphide ore and a flotation circuit will produce a gold concentrate averaging about 18.8 g/t for sale, while flotation tailings still pass through the CIL circuit to catch the remaining gold. Mining is planned to roughly double from 10 Mt a year to about 20 Mt.
โถ Shows how gold moves from ore to dorรฉ and refined metal, the same steps as Simberi’s leach plant. ยท 5:27
The sulphide expansion: cost, timeline and output plan
The December 2025 feasibility study priced initial project capital at US$275 million, with a further US$50-70 million of pre-expansion work. It forecast 2.1 million ounces of production over the life of mine to FY39, an AISC of US$1,100-1,400 an ounce from FY29 to FY36, and a post-tax net present value (NPV, at an 8% discount rate) of US$1,023 million at US$3,000/oz gold, rising to US$1,811 million at US$4,000/oz (feasibility study). The final investment decision in April 2026 approved a US$333 million budget.
Chart
Planned Simberi gold production
Thousand ounces per financial year, midpoint of plan ranges (years end June)
Milestones reported in October 2026:
- New ball mill due on site in November 2026, a month later than planned in July; grinding circuit engineering about 71% complete.
- Crushing and grinding commissioning moved from the June 2027 quarter to the September 2027 quarter because of piling delays.
- Flotation plant commissioning planned for the June 2028 quarter; the CIL upgrade, once planned for FY29, brought forward to run in parallel.
- New wharf construction started; procurement 45% complete with 60 of 132 packages approved.
- First sulphide ore still targeted for mid-calendar 2028, with no change to the overall schedule.
Australian financial years end in June, so FY29 runs from July 2028 to June 2029. Production in the plan peaks at about 242,000-243,000 ounces in FY31 and FY33 before tailing off as the sulphide pits are exhausted and remnant oxide stockpiles are processed.
Calculator
What is Simberi’s output and royalty worth a year?
Enter annual production, payable share, gold price and royalty rate.
- Payable gold (oz): 194,120.0
- Gold revenue, 100% basis (US$ million): 751.2
- Royalty ounces equivalent: 5,338.3
Example values only. Gold price is an input: example, use today’s price (Kitco spot bid was about US$3,870/oz on 12 November 2026). 211,000 oz is the FY29 plan midpoint; 92% payable is plan payable ounces over produced ounces (feasibility study, December 2025). An NSR royalty is paid on net smelter return, so actual payments are lower after smelting and refining charges. Not investment advice.
Tailings, water and the island environment
Simberi disposes of tailings through deep-sea tailings placement (DSTP): the slurry is diluted with seawater and piped offshore so that it flows down the steep submarine slope to depths of more than 3 km. The DSTP pipeline was relaid and back in operation in January 2022 after a long mill shutdown, when the company guided to 60,000-70,000 ounces for FY22 (St Barbara, January 2022). DSTP is permitted in PNG but draws criticism from environmental groups, so it is a standing permitting and reputation issue for any owner.
Water is the other constraint. The September 2026 quarter showed that the mill depends on rainfall collected in the pits; El Niรฑo dry spells cut throughput, and the company expected dry conditions for two more quarters. Rehabilitation is progressive: a further 0.44 hectares were rehabilitated in the September 2026 quarter. The 12-month total recordable injury frequency rate was 0.6 per million hours worked.
Regulation sits with PNG’s Mineral Resources Authority, which issued a cease-work order in December 2009 over landholder issues during Allied Gold’s time; mining later resumed. The feasibility study also tied the investment decision to the grant of the mining lease extension, showing how much the project depends on PNG approvals.
โถ Explains the main environmental impacts of mining, including tailings and water. ยท 2:31
Community and local economy
The island population of about 1,100 belongs to nine clans living mainly in villages on the north and west coasts, and the mine has long been the largest employer on the island. The local language is the Simberi dialect of Mandara (Tabar). Kumul’s planned 20% stake would give the PNG state a direct share of the project for the first time.
The earlier version of this page repeated percentages for water recycling, jobs and forest restored that no published report supports; they have been removed. The company’s quarterly reports give the hectares rehabilitated and safety rates, and those are the figures quoted here.
What consultants and investors should check
- Deal completion. Watch for PNG and China approvals of the Lingbao sale (targeted for the March 2027 quarter) and completion of the Kumul 20% purchase.
- Ball mill and flotation commissioning. Any further slip past the September 2027 and June 2028 quarters would push back the jump to 200,000+ ounces.
- Mining rate. Total movement has to keep rising toward 20 Mt a year to expose sulphide ore on time.
- Recovery. Oxide recoveries in the 70s are the weak point today; the CIL upgrade is meant to lift them.
- Water and weather. Dry seasons limit throughput until water storage improves.
- Exploration upside. Drilling below the Samat and Pigiput sulphide pits and on Tatau and Big Tabar islands could add to the 13-year life; none of that is in the current plan.
When we screen a comparable volcanic island or tropical licence, satellite imagery helps map clay and iron-oxide alteration, ridge-top workings and vegetation changes before any field visit. Farmonaut’s satellite-based mineral detection does this for a chosen licence area; you can request a quote or contact us. For other producing mines, see our map of gold mines in the world.
โถ How satellite remote sensing helps screen ground for gold before field work. ยท 4:25
Frequently asked questions
Where is the Simberi mine located?
On Simberi Island, the northernmost island of the Tabar Group in New Ireland Province, Papua New Guinea, about 40 km north of New Ireland. The pits are on the eastern highlands of the island inside Mining Lease 136.
Who owns the Simberi gold mine?
Lingbao Gold Group and St Barbara each hold 50% of New Simberi as of the September 2026 quarter. Kumul Mineral Holdings has agreed to buy 20%, and St Barbara has agreed to sell its remaining interest to Lingbao, with completion targeted for the March 2027 quarter. St Barbara would then keep a 2.75% NSR royalty.
How much gold does Simberi produce?
48,395 ounces in the year to June 2026 and 10,746 ounces in the September 2026 quarter, on a 100% basis. The expansion plan targets more than 200,000 ounces a year from FY29.
What is Simberi Gold Company Limited?
It is the PNG operating company for the Simberi mine, named in the feasibility study as the owner of the power station. It is held through Tabar Islands Holdings, whose ownership is changing as described above.
What type of gold deposit is Simberi?
A low-sulphidation epithermal gold-silver system in volcanic rocks, with a weathered oxide cap over deeper sulphide ore.
How large are Simberi’s gold reserves?
Ore reserves at 30 September 2025 were 43.1 Mt at 1.8 g/t for 2.47 million ounces of gold, about three quarters of it in sulphide ore. Resources, including reserves, were 5.83 million ounces.
How much does the Simberi expansion cost?
The final investment decision approved US$333 million. The feasibility study had estimated US$275 million of initial capital plus US$50-70 million of pre-expansion work.
When will Simberi start processing sulphide ore?
The target is mid-calendar 2028, with the ball mill commissioned in the September 2027 quarter and flotation in the June 2028 quarter.
What happens to Simberi’s tailings?
They are diluted with seawater and discharged through a deep-sea tailings placement pipeline, settling at depths of more than 3 km.
How long is the Simberi mine life?
The feasibility study gives 13 years, to FY39, based only on Proved and Probable reserves.
Is Simberi St Barbara’s only mine?
No. St Barbara is also restarting the Touquoy operation and developing the 15-Mile project in Nova Scotia, Canada, which will become its main business once the Simberi sale completes.
This page is for information only and is not investment advice. Production, reserve and deal figures are as reported by the companies on the dates shown and may change.
Farmonaut mining
Map alteration on your licence before you drill
Consultants can get satellite maps of alteration and target zones for a client's licence area to plan field work and drilling.
Mining Pro sample view, synthetic data
Sources
- St Barbara, Quarterly report Q1 September FY27 (October 2026): announcements.asx.com.au
- St Barbara, Quarterly report Q4 June FY26 (July 2026): announcements.asx.com.au
- St Barbara, Simberi Expansion Project feasibility study (December 2025): bulletin.webull.com
- St Barbara, Sale of remaining interest in New Simberi to Lingbao (10 September 2026): announcements.asx.com.au
- St Barbara, Simberi deep sea tailings placement pipe operational (January 2022): stbarbara.com.au
- Mining Technology, St Barbara receives investment from Lingbao (April 2026): mining-technology.com
- Mining Technology, St Barbara to divest New Simberi gold project stake (September 2026): mining-technology.com
- Wikipedia, Simberi Island: en.wikipedia.org
- Wikipedia, Tabar Group: en.wikipedia.org
- Mineral Resources Authority of Papua New Guinea: mra.gov.pg
- Kitco, Gold spot price (12 November 2026): kitco.com
Discussion
Questions, corrections or field experience? Share them below. First-time comments are reviewed before they appear, and your email is never published.
No comments yet. Be the first to add a question or your experience.




Client · Oregon, USA · Gold
Exploration consultancy · South Africa · Gold
Licence holder · Niger · Gold
Licence holder · Nigeria · Gold + lithium
Client · Tanzania · Gold
Client · Somalia · Gold
Client & affiliate partner · Ghana · Gold