Mineral tenure ยท British Columbia
Mineral Titles Online: How BC Claims Work, Step by Step
Mineral Titles Online is British Columbia’s online registry for mineral and placer claims: with a Business BCeID and a Free Miner Certificate you select grid cells, pay C$1.75 per hectare, wait for a First Nations consultation decision, then keep the claim with registered work or cash.

Key takeaways
- Anyone can search Mineral Titles Online maps and titles without logging in; applying for or holding a claim needs a Business BCeID and a valid Free Miner Certificate.
- Claims are made of grid cells of about 16 to 21 hectares, up to 100 cells per application, at C$1.75 per hectare for mineral claims.
- Since 25 March 2025 a claim is an application: the Province consults First Nations first, and early decisions averaged 127 days.
- Claims stay alive only through work or cash in lieu registered before midnight on the expiry date, backed by a report within 30 or 90 days.
- A Mines Act permit (Notice of Work) is needed before machine work or drilling; decisions are now tiered at 40, 90 or 140 days.
In this article
- What BC Mineral Titles Online is, and what you can do without an account
- Before you apply: a Business BCeID and a Free Miner Certificate
- Selecting cells on the Mineral Titles Online grid
- After you submit: the MCCF consultation step in Mineral Titles Online
- Keeping a claim in good standing: work, cash in lieu and PAC
- Notice of Work basics under the Mines Act
- Buying, transferring and leasing BC mineral titles
- Screening ground before you apply in Mineral Titles Online
- Frequently asked questions about Mineral Titles Online
Mineral Titles Online (MTO) is where every new mineral or placer claim in British Columbia starts, and where most of the paperwork that keeps a claim alive is filed. It replaced physical staking in January 2005, and on 25 March 2025 it changed again, from instant registration to an application that waits for First Nations consultation. This guide walks through BC Mineral Titles Online in the order a junior actually meets it: the logins, the cell grid, the consultation queue, the anniversary-date arithmetic, transfers and leases, and the Notice of Work that comes before any drill.
This page stays with the registry and the rules behind it. For the mines, gold districts and production numbers, read our guide to gold mining in BC, from Brucejack to your first cell claim. For how British Columbia compares with the other provinces, see the overview of gold exploration across Canada and our Canada gold deposits by province page.
A forfeited cell claim’s ground reopens for new applications at 10:00:01 a.m. the day after it lapses.
What BC Mineral Titles Online is, and what you can do without an account
How much of Mineral Titles Online is public? More than most newcomers expect. The Mineral Titles Branch says on its new-client page that the map viewers, the title and owner search and the reserves (sites) search are open to the general public, and that you do not need to log on to see that information. A geologist checking whether a target is open, or an investor checking who holds the ground under a press release, can do both from a browser in a few minutes.
The legal footing sits in Part 1.1 of the Mineral Tenure Act, which requires the Chief Gold Commissioner to establish and maintain a mineral titles online registry for registrations of claims, leases and notices. The same Act, current to 6 October 2026 on BC Laws, says a claim holder’s interest is a chattel interest, and that the holder is entitled to the minerals the government holds vertically downward from and inside the claim boundaries.
The Introduction to MTO page records that the system went live on 12 January 2005 and that it was built partly to remove physical claim staking and the challenges that came with poorly placed posts. Cell claims are defined by the grid, so the position of a cell claim is absolute. That one design choice is why BC title disputes look different from those in provinces that still rely on posts in the ground.
Three things to check on the public side of Mineral Titles Online
- โ Open ground. The MTO home page links to the map viewers for mineral, placer and coal tenure. It notes that the CWM viewer is the one used for event registrations such as acquisitions, reductions and subdivisions.
- ๐ Who holds a title. The Mineral Titles Online title search shows the recorded holder, the good-to (expiry) date and registered events, which matters when you are about to sign a deal.
- โ Reserves. Parks, protected areas and mineral reserves under section 22 of the Act can block registration or limit what a claim conveys. Search the reserve sites before planning around a target.
- Pending applications. Since the consultation framework began, cells under application are visible to other users while they wait for a decision.
The last point surprised some applicants. In the Province’s six-month review of the consultation framework, a few respondents worried that public visibility of pending applications lets competitors see where they are looking. The Ministry’s answer was that applicants must be able to see cells under review, and that the personal information shown publicly is limited to the applicant’s address.
โถ How satellite and soil data are combined to look for copper and gold on BC ground before claims and field crews are committed. ยท 3:11
Before you apply: a Business BCeID and a Free Miner Certificate
Two credentials stand between you and the application screen, and the first one trips people up. The Mineral Titles Branch says the MTO application requires a Business BCeID, whether you are an individual, a partnership or a company. An individual registers as a “Proprietorship”; the branch states plainly that other types of BCeID will not work for MTO. A company would pick a type such as BC Corporation or Extra Provincially Registered Company. Enrolment starts on the BCeID website.
There is an in-person step. For individuals, the same page says you will need to visit a point of service office (Service BC, FrontCounter BC or a Mineral Titles Branch office) to be identity-proofed over the counter, with identification from the approved list. A geologist based in Toronto or Denver who plans to hold BC ground personally should budget a visit, or hold the claims through a company or agent instead.
Agents are allowed in Mineral Titles Online. The Introduction to MTO lists among the system’s functions the ability to authenticate yourself as a client and authorize any number of other persons to act as your agent. Many juniors run their tenure through a land manager or a claims agent for exactly this reason. The agent does the clicking; the free miner remains the recorded holder.
Free Miner Certificate: who qualifies and how long it lasts
Section 8 of the Mineral Tenure Act says a certificate must be issued to a person aged 18 or over who is ordinarily resident in Canada for at least 183 days a year or is authorized to work in Canada, to a Canadian corporation, or to a partnership of qualifying partners. The Chief Gold Commissioner may also issue one to an applicant who does not meet those tests if legitimate circumstances require it to conduct business in BC. Fees, set by Schedule B of the Mineral Tenure Act Regulation, are C$25 for an individual, nothing for a senior over 65 and C$500 for a corporation.
The detail that matters most for land managers is the term. The new-client page states that an FMC is valid for 12 months from the date of issuance. It also says a valid certificate is needed not only to acquire a title, but by the recorded holder at the time that exploration and development work, or a payment instead of work, is registered on that claim. A lapsed certificate on the day a work filing is due is a self-inflicted problem.
The registry also needs a way to pay. The Introduction to MTO lists electronic payment by Visa, MasterCard or American Express. The branch’s new-client page adds that cheques and money orders go to the “Minister of Finance”, and that credit or debit cards are not accepted at the Mineral Titles Branch counter itself.
Chart
What the flat Mineral Titles fees are
Canadian dollars (C$) per transaction, Schedule B, B.C. Reg. 529/2004
Notice what a Free Miner Certificate does not cover. The branch lists things an FMC holder may not do, including using the title for residential or recreational purposes, placing a structure such as a cabin on it, or conducting any mining activity such as exploration or road building without approval from a regional mines office. It is a licence to hold mineral rights, not a land-use permit.
Selecting cells on the Mineral Titles Online grid
How big is a cell? The Mineral Titles claims FAQ says cells range from about 21 hectares (457 m by 463 m) in the south to about 16 hectares at the north of the province, because lines of longitude converge toward the pole. A 40-cell claim near the US border and a 40-cell claim near the Yukon line are therefore not the same size, and fees, work and cash are all charged per hectare. Use the area Mineral Titles Online reports, not a rule of thumb.
Section 4 of the regulation sets the shape rules. An individual claim may consist of up to 100 complete or partial adjoining cells, and the FAQ repeats that one hundred cells are allowed per claim application. The Chief Gold Commissioner may refuse a cell considered too small or too irregular to be workable. Registration of a cell claim is not effective until the prescribed fee is paid, which Schedule B sets at C$1.75 per hectare for mineral cells and C$5.00 per hectare for placer cells.
What a cell claim does not give you
A cell can overlap rights that MTO cannot hand over. The regulation says no mineral or placer rights in alienated land are acquired by registering a cell claim, and that a new claim does not take rights already held by a legacy claim or reserved under section 22 of the Act. The claims FAQ gives the clearest example: if a Crown-granted 2-post claim holds the gold and silver under part of your cell, your new title holds every other mineral, but not that gold and silver. Research crown grants before you assume the target metal is yours.
Timing matters when ground lapses. The FAQ says all claims forfeit at midnight of the expiry (anniversary) date if not kept in good standing. When an existing cell claim forfeits, the cell opens for registration at 10:00:01 a.m. the following day; when a legacy claim forfeits, the overlying cell is open immediately. Since March 2025 that first Mineral Titles Online application still has to clear consultation, but it is the application that holds the cells.
The Mineral Titles Online calculator below turns a cell count into the cheque you write on the day you apply, and shows what the first anniversary year will demand. It uses the per-hectare figures in the regulation and lets you set the cell size for your latitude.
Calculator
What will a Mineral Titles Online claim application cost?
Enter the cells you plan to select, the cell size at your latitude and your certificate fee. Amounts in Canadian dollars (C$).
- Claim area: 720 ha
- Claim area in acres: 1,779 acres
- Claim applications needed: 1 applications
- Registration at C$1.75/ha (C$): $1,260
- First-year work to keep it (C$): $3,600
- Or cash in lieu that year (C$): $7,200
Canadian dollars (C$). Mineral (hard-rock) cell claims only. Registration C$1.75 per hectare and Free Miner Certificate C$25 (individual) or C$500 (company), Schedule B of B.C. Reg. 529/2004. Cells run from about 21 ha in southern BC to about 16 ha in the north (Mineral Titles claims FAQ); MTO shows the exact area. Up to 100 cells per claim application. First anniversary-year work C$5 per hectare, cash in lieu double (sections 8 and 10). Excludes Notice of Work, reclamation security and field costs. General information, not legal advice; confirm with the Mineral Titles Branch.
The default case, 40 cells at 18 hectares each, is 720 hectares: C$1,260 to register, C$1,285 with an individual certificate, and C$3,600 of work in the first anniversary year to keep it, or C$7,200 if you choose cash. A company certificate raises the upfront figure by C$475. For bigger land packages, remember the 100-cell ceiling: a 250-cell program is at least three separate claim applications, each consulted on its own.
Mineral claim area applied for between 25 March and 30 September 2025 was 61% below the seven-year average.
Where should those cells go? Satellite screening is one way to rank ground before money is committed. Our satellite-based mineral detection service maps alteration, structure and spectral anomalies across a whole area of interest, so a land manager can apply for the cells that matter rather than a blanket block. You can Map Your Mining Site at mining.farmonaut.com by drawing or uploading the boundary you are considering.
After you submit: the MCCF consultation step in Mineral Titles Online
Why did BC claims stop being instant? The Province’s information for industry explains that a 2023 BC Supreme Court ruling found the old automatic registration did not let the Province meet its duty to consult First Nations under section 35 of the Constitution Act, 1982. The court gave 18 months to fix it. The answer was the Mineral Claims Consultation Framework (MCCF), which, according to the six-month review, took effect on 26 March 2025 and replaced automatic claim registration with an application-based process on MTO.
The MTO home page dates the system change to 25 March 2025. Since then, a free miner applies for cells in Mineral Titles Online and pays, the cells are held until a decision, and the Chief Gold Commissioner decides after consultation whether to register the claim, register it with accommodation measures, or deny it. The pamphlet lists ministerial orders under section 17 of the Act and mineral reserves under section 22 among the possible statutory accommodations.
The stages and the clock
The framework gives each stage a window. The Ministry reviews applications and prepares a consultation package in monthly batches, taking 1 to 31 days. First Nations are given 30 days for an initial response, and the review adds that the statutory decision maker may grant 15-day extensions. Accommodation measures, where needed, take 30 to 60 days. A single application can overlap as many as 15 First Nations’ territories, all of whom are consulted.
Chart
How long an MTO claim application takes
Days per stage, from the Province’s framework, and the average actually recorded
Those windows add up to the Province’s target of 90 to 120 days, which the Declaration Act action plan report also cites. Reality ran slower at first. Between 25 March and 1 August 2025 the Ministry received 1,529 applications, processed 954, and averaged 127 days per decision while carrying out 5,605 individual consultations. The Ministry says it is committed to returning to its intended timelines in 2026; check the current status with Mineral Titles before you promise a field season to investors.
What the consultation step has done to claim activity
The review measured activity in the same six-month window each year. Between 25 March and 30 September 2025 the Ministry received or registered 1,516 mineral claim applications, 29% below the seven-year average of 2,124, covering 273,423 hectares, 61% below the average of 703,995 hectares. Placer claims held up better: 740 claims against an average of 724, though over less area.
Chart
Mineral claim area, 25 March to 30 September
Thousand hectares applied for or registered in the same six-month window each year
Applicants’ views were mixed. In the review’s survey, 88% of claim applicants agreed the steps were clear in Mineral Titles Online, but only 17% felt timelines met their expectations and 73% said uncertainty about approval timing had hurt business planning. Several noted that winter conditions restrict field work, especially in northern BC, so a claim that clears consultation in autumn may not see a crew until the next summer.
Keeping a claim in good standing: work, cash in lieu and PAC
A claim in BC is held one year at a time. The Mineral Tenure Act defines the expiry date as one year after the claim is registered, and section 29 lets a recorded holder keep it from year to year by registering exploration and development work, or a payment instead of work, and a revised expiry date. In Mineral Titles Online those are two events with their own names: a statement of work (SOW) and cash in lieu (CIL). Our BC gold guide sets out the per-hectare table and a calculator for how many years a work budget buys; this section covers the filing rules around it.
Rules for registering work
- โ One year to file. Section 7 of the regulation says work must be registered within one year of being completed, and only work done after the claim was registered counts, apart from land-ownership research and notice-serving costs.
- โ Neighbours can share. Work on one claim may be applied to adjoining claims, or to any claims in a sequence of adjoining claims.
- โ Prospecting has a shelf life. Prospecting counts as exploration and development only during the first three years a recorded holder holds the claim.
- โ A quick look is not work. A description of a brief property examination is not acceptable for registration.
- Ten years is the ceiling. Registered work can be applied up to 10 future anniversary years, and the FAQ confirms several SOW events can be stacked to that limit.
The report deadline is short. Section 15 gives 30 days after registering a statement to submit a report of physical work, such as trenching or road building. Section 16 gives 90 days for a report of technical work, such as geochemistry, geophysics or mapping, and says approved reports stay confidential for one year from the date the work was registered. If the report does not arrive, section 33 of the Act lets the Chief Gold Commissioner cancel the recorded work, which can unwind the extra years you thought you had bought.
Who can write a technical report? Section 16(2) lets the Chief Gold Commissioner accept one written by an individual recorded holder about their own claim, by a registrant of Engineers and Geoscientists BC, or by someone who shows relevant training and experience. Cost statements must itemize days, rates and dates for wages, food, transport, surveys and analyses, as Schedule A of the regulation spells out.
Cash in lieu, portable credits and moving the expiry date
In Mineral Titles Online, cash is simpler but dearer. Section 10 sets the payment instead of work at double the work value for a mineral claim, and C$40 per hectare for a placer claim, and allows it only for the next anniversary year. Portable assessment credits (PAC) are the opposite trade: surplus approved work can be banked in a PAC account, and section 9 lets a holder use those credits for up to 30% of the requirement for a year, but only alongside technical work that covers the rest.
Section 11 adds a tool many holders overlook. You can revise a claim’s expiry date by any period using registered work, or by at least six months using cash, and the amount is prorated on a daily basis. That is handy when a field season ends in September and the claim expires in March: you can align dates across a package. The calculator applies the regulation’s rates by anniversary year.
Calculator
How much work or cash moves your claim’s expiry date?
Enter the claim area, the anniversary year, the days to add and any portable credit share. Amounts in Canadian dollars (C$).
- Rate this anniversary year (C$/ha/yr): 10 C$/ha
- Portable assessment credit used (C$): $0
- New work you must report (C$): $3,945
- Cash in lieu, same days (C$, 6+ months only): $7,890
Canadian dollars (C$). Mineral claim rates of C$5 per hectare in anniversary years 1 and 2, C$10 in years 3 and 4, C$15 in years 5 and 6 and C$20 after (section 8 of B.C. Reg. 529/2004), prorated by day for an expiry date change (section 11). Cash in lieu is double the work value and can only push the date by 6 months or more (sections 10 and 11). Portable assessment credits can cover up to 30% when technical work is registered (section 9). Days are capped at 365 and the extension is assumed to sit inside one anniversary year. General information, not legal advice; confirm with the Mineral Titles Branch.
With the defaults, a 720-hectare claim in its third anniversary year needs C$10 per hectare a year, so pushing the expiry date 200 days takes C$3,945 of registered work, or C$7,890 in cash. Set the PAC share to 30% and only C$2,762 of new technical work is needed, with C$1,184 drawn from credits. Long-held ground has one more option: after at least 10 years of recorded work, section 9 lets a holder use credits at C$40 per hectare a year to hold a claim for up to five years, registered online at least 60 days before expiry.
โถ A southern BC soil, induced-polarization and lidar program: the kind of technical work that must be reported to Mineral Titles to count toward a claim. ยท 2:47
Notice of Work basics under the Mines Act
A claim registered in Mineral Titles Online is not permission to dig. Section 14 of the Mineral Tenure Act says no mining activity may be done until the holder has any permit required under section 10 of the Mines Act. In BC the application for that permit is called a Notice of Work (NoW). The Province’s exploration permit page, updated 26 January 2026, says a regional Mines Act permit must be in place before any work in, on or about a mine, and that mechanized work includes any disturbance or excavation of the ground.
Infographic
From a BCeID to a drill permit in British Columbia
- 1Business BCeID and FMCProprietorship BCeID, identity checked in person; certificate C$25 (person) or C$500 (company), valid 12 months.
- 2Apply for cellsUp to 100 cells per claim in Mineral Titles Online, C$1.75 per hectare.
- 3MCCF decisionFirst Nations are consulted; the Province targets 90 to 120 days.
- 4Hold the claimRegister work or cash in lieu before midnight on the expiry date.
- 5Notice of WorkMines Act permit before machine work or drilling: 40, 90 or 140-day tiers.
Some early work sits below the permit line. The same page lists non-invasive activities that may not need a permit, such as mapping, photos, water sampling, ground geophysics without exposed electrodes, grid lines that need no tree felling, and hand-tool sampling. Hand-dug pits and trenches qualify only if each is no more than 3 cubic metres and 1.2 metres deep, no more than five unreclaimed pits or trenches exist at any one time, and none is in a stream or its riparian setback.
Site-specific or multi-year area-based
There are two kinds of authorization. A site-specific authorization covers proposed activities over one to five years, with exact locations, disturbance and timber cutting identified for the whole period; changes need an amendment. A multi-year area-based (MYAB) authorization lets the proponent move work within a defined overall area, with a detailed Year 1 plan and a described program for later years, approved each year through an annual update. Both require an annual summary of exploration activities, which the page says is due to MineSpace by 31 March each year.
A NoW application includes a mine plan, maps, a reclamation plan and closure plans, and is filed online through FrontCounter BC. The Province’s proponent guide, updated 26 February 2026, adds that a reclamation security bond may be required, that every application must include a plan to protect Indigenous cultural heritage resources and an archaeological chance find procedure, and that early engagement with Indigenous groups is recommended before any formal process starts.
The 40, 90 and 140-day tiers
From 1 April 2026, exploration permits follow three processing streams with fixed timelines. Tier 1 (40-day decision) covers work such as up to 25 small drill sites and less than 1 km of new access, where affected First Nations have documented support or non-objection. Tier 2 (90 days) adds mechanical trenching, camp buildings and up to 5 km of new access. Tier 3 (140 days) covers blasting, underground exploration, bulk samples up to 10,000 tonnes or more than 10 hectares of new disturbance, and applies where engagement has not started. The Ministry confirms acceptance and tier within 7 days, and a file that hits its deadline goes to the Chief Permitting Officer, who has 14 days to decide or meet the applicant.
Put the two queues together and the planning lesson is plain. A new claim application aimed at a 90 to 120-day decision, followed by a Tier 2 permit at 90 days, means roughly half a year between choosing cells and turning a drill, assuming both run to target. That is why many juniors now apply for claims a full season ahead of the program they want to run, and why reliable target ranking before the application matters.
โถ How ore becomes gold, from blasting to the mill, which helps explain why Tier 3 permits and bulk samples get the longest review. ยท 10:34
Buying, transferring and leasing BC mineral titles
Deals are where registry mistakes get expensive. The claims FAQ says a transfer of ownership is a two-step process from one free miner to another, and that the expiry date of a claim does not change on transfer. One buyer quoted in the FAQ bought a claim that expired two days later. Ask for the good-to date before the price.
The FAQ lists checks a buyer should make before completing a Bill of Sale: review the title details in Mineral Titles Online, look for a complaint event, confirm with the Mineral Titles helpdesk whether any complaint is still open, look for SOW registrations, and confirm that the work report for each one has been submitted and approved. If a claim is bought from an owner who never filed an approved report, the Chief Gold Commissioner may cancel the recorded work even after the transfer. A complaint costs C$200 per claim to file, under Schedule B.
When a claim becomes a mining lease
Claims held in Mineral Titles Online are not meant for production. Section 17 of the regulation caps output from a mineral claim at 1,000 tonnes of ore a year per cell, with one bulk sample of up to 10,000 tonnes allowed not more than once every five years. To mine, a holder converts to a mining lease under section 42 of the Act: register the application, pay the fee, have the ground surveyed if the Chief Gold Commissioner requires it, post a notice, and publish it once in the Gazette and once a week for four consecutive weeks in a local newspaper. The lease runs for an initial term of up to 30 years. Schedule B sets the application at C$100 and annual rent at C$20 per hectare.
| MTO event or document | What it does | Fee or rule | Where it is set |
|---|---|---|---|
| Claim application (cell selection) | Holds cells pending an MCCF decision | C$1.75/ha mineral, C$5/ha placer; up to 100 cells | Regulation s. 4, Schedule B |
| Statement of work (SOW) | Registers work and moves the expiry date | Report within 30 days (physical) or 90 days (technical) | Regulation ss. 7, 8, 15, 16 |
| Cash in lieu (CIL) | Pays instead of work for the next year | Double the work value; C$40/ha placer | Regulation s. 10 |
| Expiry date change | Moves the good-to date by a chosen period | Prorated daily; cash only for 6 months or more | Regulation s. 11 |
| Transfer (Bill of Sale) | Moves ownership between free miners | Two steps; expiry date unchanged | Claims FAQ, regulation s. 12 |
| Mining lease application | Converts a claim for production | C$100, then C$20/ha a year; up to 30-year term | Act s. 42, Schedule B |
Can you stake a claim in Canada outside British Columbia?
Yes, but every province and territory runs its own registry, and the mechanics differ. Ontario’s Mining Lands Administration System lets users register and manage mining claims online and apply for a prospector licence. Saskatchewan uses its own online Mineral Administration Registry Saskatchewan (MARS). Quebec has its own system too. Our Canada-wide exploration overview compares claim systems by province, and the mining cadastre portal guide by country covers registries outside Canada.
Mineral tenure is a provincial power, so a BC Mineral Titles Online account and free miner certificate in BC means nothing in Ontario, and vice versa. Rules also move: the BC Mineral Tenure Act itself is under review. The Province’s Declaration Act action report says reform is being advanced in consultation with First Nations, that work has moved slower than originally planned, and that the 2025/26 period focused on targeted bilateral discussions. Expect further change to the Act, and recheck the rules on this page against Mineral Titles before relying on them.
Chart
Claims applied for or registered each year
Count of claims or claim applications per calendar year; 2025 as reported in December 2025
โถ Why gold ground is being re-examined worldwide, useful context for BC claim activity. ยท 10:44
Screening ground before you apply in Mineral Titles Online
The MCCF changed the economics of a speculative Mineral Titles Online claim. Before 2025, a junior could register a broad block in minutes and trim it later. Now each application waits months, is consulted on, and can be conditioned or denied, so applying for ground you do not need costs time, goodwill with Nations and money. The case for ranking targets before the application has never been stronger.
Satellite data helps most in that ranking step, before anything is filed in Mineral Titles Online. Multispectral and shortwave-infrared bands can map clay, sericite and iron-oxide alteration on exposed rock; elevation models and radar show faults and intrusive contacts under tree cover. What satellites cannot do in BC is see through snow, forest and glacial till, or tell you grade at depth. Optical images are only useful in the short summer window, and steep mountain slopes need correcting for shadow.
Farmonaut’s mineral detection analyses an area of interest from coordinates, a KML/KMZ file or a polygon, and delivers prospectivity heatmaps, alteration and structural interpretation, and georeferenced GIS files in 5 to 20 business days depending on size and mineral. Our track record covers more than 100,000 hectares, 20+ mineral types and 25+ countries, and the approach lowers early-exploration cost by up to 80 to 85% while cutting screening time from months to days. Results are exploration targets ahead of any resource estimate, not a resource, and not an NI 43-101 disclosure; our NI 43-101 explainer covers what that standard requires.
Can a satellite study count as work on a BC claim? Schedule A of the regulation mentions documentation of satellite or other remote sensing among activities reported in support of other technical work, and section 7 lets the Chief Gold Commissioner accept airborne surveys extending beyond claim boundaries. Whether a particular report qualifies, and for how much, is for the Chief Gold Commissioner to decide on the report and its itemized costs. Ask Mineral Titles before you count on it.
Frequently asked questions about Mineral Titles Online
What is Mineral Titles Online?
Mineral Titles Online (MTO) is British Columbiaโs internet registry for mineral, placer and coal rights, run by the Mineral Titles Branch under the Mineral Tenure Act. It launched on 12 January 2005 and replaced physical staking with selection of grid cells on a map.
How do I log in to BC Mineral Titles Online?
You need a Business BCeID. Individuals register as a Proprietorship and must be identity-proofed in person at a Service BC, FrontCounter BC or Mineral Titles office. Viewing maps and searching titles does not require a login.
Do I need a Free Miner Certificate to use MTO?
Yes, to apply for or buy a claim, and again whenever you register work or cash in lieu on a claim. A certificate costs C$25 for an individual, C$500 for a company and nothing for seniors over 65, and it is valid for 12 months.
Can you stake a claim in Canada if you are not Canadian?
In BC, section 8 of the Mineral Tenure Act allows a certificate for a person 18 or over who is ordinarily resident in Canada for 183 days a year or authorized to work in Canada, a Canadian corporation, or a qualifying partnership. Others often hold claims through a Canadian company. Other provinces set their own rules.
How much does it cost to register a claim in BC?
Registration is C$1.75 per hectare for a mineral cell claim and C$5.00 per hectare for a placer cell claim (Schedule B). A 720-hectare mineral claim costs C$1,260 to register, plus the certificate fee.
How big is a cell in Mineral Titles Online?
About 21 hectares (457 m by 463 m) in southern BC down to about 16 hectares in the north. One claim application can include up to 100 cells.
How long does a claim application take under the MCCF?
The Province targets a decision within 90 to 120 days. Applications processed between 25 March and 1 August 2025 averaged 127 days. Check current timing with Mineral Titles.
What is the Mineral Tenure Act?
The Mineral Tenure Act is the BC statute that governs free miner certificates, claims, leases, work requirements and the MTO registry. Its fees and work values are set in the Mineral Tenure Act Regulation, B.C. Reg. 529/2004. The Act is under reform.
What happens if I miss my claim expiry date?
The claim forfeits at midnight on the expiry date if work or cash in lieu has not been registered. For a cell claim, the ground reopens for new applications at 10:00:01 a.m. the next day.
Do I need a permit to explore on my BC claim?
Mapping, hand-tool sampling and small hand-dug pits within set limits may not need one. Mechanized work and drilling need a Mines Act permit through a Notice of Work, decided in 40, 90 or 140 days depending on tier.
Can satellite data help me choose cells in MTO?
Yes. Satellite screening ranks alteration and structure over a wide area so you apply only for the strongest ground. It does not see through snow, forest or till, and its results are exploration targets, not resources.
General information, not legal, tax or investment advice. Claim rules, fees and processing times change, and the Mineral Tenure Act is under reform; confirm with the Mineral Titles Branch and your regional mines office. Farmonaut is not a licensing agent, land-title adviser, broker or investment adviser. Farmonaut results are exploration targets ahead of any resource estimate.
Farmonaut mineral detection
Rank your BC cells before you apply
Send the area you are considering as KML, KMZ or a polygon. Farmonaut returns ranked satellite exploration targets for it, usually in 5 to 20 business days, so you apply only for the ground that matters.

Sources
- Mineral Tenure Act, RSBC 1996, c. 292 (BC Laws, current to 6 October 2026): bclaws.gov.bc.ca
- Mineral Tenure Act Regulation, B.C. Reg. 529/2004, including Schedule B (BC Laws): bclaws.gov.bc.ca
- Mineral Titles Online home page and news (Province of BC): mtonline.gov.bc.ca
- Mineral Titles Branch, Claims FAQ (updated 25 March 2025): www2.gov.bc.ca
- Mineral Titles Branch, New client to Mineral Titles Online (updated 25 March 2025): www2.gov.bc.ca
- Mineral Titles Branch, Introduction to MTO: www2.gov.bc.ca
- Ministry of Mining and Critical Minerals, Mineral Claims Consultation Framework 6 Month Review (December 2025): www2.gov.bc.ca
- Ministry of Mining and Critical Minerals, MCCF information for industry (January 2025): www2.gov.bc.ca
- Province of BC, Mineral and coal exploration permit applications (updated 26 January 2026): www2.gov.bc.ca
- Province of BC, Mineral exploration permitting improvements and tier matrix (2026): www2.gov.bc.ca
- Province of BC, Mining proponent guide to the Notice of Work process (updated 26 February 2026): www2.gov.bc.ca
- Mines Act, RSBC 1996, c. 293 (BC Laws): bclaws.gov.bc.ca
- Declaration Act Secretariat, Action 2.14: Modernize the Mineral Tenure Act: declaration.gov.bc.ca
- Government of Ontario, Mining Lands Administration System: ontario.ca
- Government of Saskatchewan, Mineral Administration Registry Saskatchewan (MARS): saskatchewan.ca
- Government of BC, BCeID: bceid.ca
Discussion
Questions, corrections or field experience? Share them below. First-time comments are reviewed before they appear, and your email is never published.
No comments yet. Be the first to add a question or your experience.



