Zambia is known for copper, and almost all of its recorded gold has come as a by-product of copper mining, yet the 2024 Minerals Regulation Commission Act is now in force with a clear path for small and large gold exploration, the ministry has published a fee and area-charge schedule, and the state is pushing to formalise small-scale gold. This guide explains the licence system in cadastre units, the fees, the gold belts the official record names (the Mwembeshi Shear Zone, Zambezi Belt, Mumbwa and Hook Granite ground, the Domes Region and the north-west), and what a satellite can read through the woodland before you apply.

Regulator Minerals Regulation CommissionLaw Act No. 14 of 2024, in force 13 June 2025Cadastre unit about 3.34 haAudience Licence holders, explorers, investors
4,522 kgRecorded gold output, 2019Mostly Kansanshi by-product (USGS)
3.34 haOne cadastre unitLicences are whole contiguous units
4 + 3 + 3Exploration licence, yearsSmall-scale: 4 years, no renewal
45 daysTo decide a mining licenceApplication after exploration
K0.40One fee unit, from 26 April 2024Application fee: K4,000 large-scale exploration

Anyone planning gold exploration in Zambia has to start by separating two stories. One is the national record, where gold has been a by-product of the big copper operations. The other is the ground itself, where small and mid-size explorers hold licences over land that has never been drilled for gold. The law was rewritten in 2024, the cadastre went online, and the state has said it wants to formalise small-scale gold. This guide puts the licensing arithmetic and the available evidence in one place.

Try it: Zambia cadastre unit, term and exploration cost calculator โ†’

Two limits are worth stating early. First, no gold resource or reserve figure for Zambia appears in the sources we could open, only production, by-product output and a ministry list of past producers, so every belt below is a place to look, not a place with ounces in the ground. Second, the fee schedule we found is the ministry notice published in 2024 under the old regime, and the new Act leaves fees and area charges to regulations we could not find, so the calculator takes the fee unit as an input you can change. Within those limits the geology is better documented than most people assume, and we use it.

“One Zambian cadastre unit is about 3.34 hectares, and a small-scale exploration licence covers between three and 300 of them.”

Gold beyond the copper mines is mostly unmapped ground
The only large operation the USGS credits with recorded gold output in 2019 was a copper mine. Everything else is small-scale, unreported or undrilled. For gold exploration in Zambia that makes screening valuable, and it makes claims of known gold in unexplored blocks worth questioning.

Gold exploration in Zambia: the Minerals Regulation Commission and the cadastre

Zambia replaced its Mines and Minerals Development Act, 2015 with the Minerals Regulation Commission Act, 2024 (Act No. 14 of 2024), which was enacted in December 2024. It is now in force: Government Gazette No. 7770 of 13 June 2025 publishes Statutory Instrument No. 42 of 2025, which brings the Act into operation on the date of publication, and Statutory Instrument No. 41 of 2025, which does the same for the Geological and Minerals Development Act, 2025 (Act No. 2 of 2025). Section 97 repeals the 2015 Act, keeps licences issued under it valid until expiry, revocation or surrender, and says an application still pending on commencement is to be issued under the new Act. The text below follows the 2024 Act as published on the African Mining Legislation Atlas and the Parliament of Zambia copy.

For gold exploration in Zambia, the Act says nobody may explore, mine, process minerals or pan for gold without the matching right or certificate, and nobody may start exploration without prior approval of an environmental impact assessment from the Zambia Environmental Management Agency. Contravening either rule is an offence. Applications are considered in the order received, which the Mining Cadastre Department describes as first in, first out, with monthly Mining Licensing Committee meetings and public inspection of cadastral maps and registers.

Who can hold a right for gold exploration in Zambia

Section 12 of the Act bars companies in liquidation, companies not incorporated under the Companies Act, 2017, companies with no registered office in Zambia and companies without a valid tax clearance certificate, and it also bars companies with a director or a holder of more than ten percent of the equity who is an undischarged bankrupt or has been jailed for fraud or dishonesty within five years. Individuals must be at least 18, hold a tax clearance certificate and have no such conviction. A document that purports to grant a right to a disqualified person is void. For anyone buying into a Zambian licence, that is a useful checklist: ask whether the holder passes each test today.

The state can also take ground off the table. The Minister of Finance may, in consultation with the Minister of Mines, acquire mining rights over identified areas for government investment, and those areas are then not open to application. The Commission can close an area to priority licensing by gazetted notice, after which the area is awarded by bidding under the Public Procurement Act, 2020. If your target looks open on a map, check the register of closed areas as well.

Exploration licences in cadastre units

The unit of area is the cadastre unit, a quadrilateral six arc-seconds on each side with an average surface of 3.34 hectares. An exploration licence has to be made up of complete contiguous units. Small-scale exploration is three to 300 units, roughly 10 to 1,000 hectares. Large-scale exploration is 301 to 59,880 units, roughly 1,000 to 200,000 hectares. Whether you plan gold exploration in Zambia at prospect scale or regional scale, the tier decides the clock. A large-scale licence is valid for four years and can be renewed twice for three years each, with 50% of the area relinquished at each renewal. A small-scale exploration licence is valid for four years and is not renewable. An applicant who held an exploration licence over an area for seven years cannot reapply for that area for a year after expiry.

Right Area in units (about hectares) Validity Who can hold it
Small-scale exploration licence 3 to 300 units (about 10 to 1,000 ha) 4 years, not renewable Citizen-owned, citizen-influenced or citizen-empowered companies (areas above 6.68 ha up to 1,000 ha)
Large-scale exploration licence 301 to 59,880 units (about 1,000 to 200,000 ha) 4 years, plus two renewals of 3 years; half relinquished at each renewal Companies
Small-scale mining licence 3 to 120 units (about 10 to 400 ha) 10 years Citizen-owned, citizen-influenced or citizen-empowered companies
Artisanal mining licence Up to about 6.68 ha for individuals 3 years A citizen or a co-operative of citizens
Large-scale mining licence Not above the mineralisation and infrastructure need 25 years Companies, with financing, local content and a bankable feasibility study
Gold panning certificate Areas set by geographical coordinates 2 years, renewable A citizen or a co-operative of citizens

Two features of that table are worth drawing out. A mining right over more than 6.68 hectares can only go to a company, and a right from 6.68 up to 1,000 hectares goes to citizen-influenced, empowered or owned companies. And a gold panning certificate, which is how the Act treats alluvial gold in Zambia worked by panning, gives exclusive panning rights over a coordinate-defined area for two years, is limited to citizens, and cannot be issued where a mining right already exists.

Area range by Zambian licence typeSmall-scale exploration covers about 10 to 1,000 hectares, small-scale mining about 10 to 400, and large-scale exploration about 1,000 to 200,000.Area range by Zambian licence typeHectares, converted from cadastre units at 3.34 hectares each1101001,00010,000100,0001MSmall-scale mining10401Small-scale exploration101,002Large-scale exploration1,005200,000Source: Minerals Regulation Commission Act, 2024 (AMLA text); 1 unit = 3.34 ha.

The jump from a few hundred hectares to hundreds of thousands is why the two exploration tiers behave so differently: one is a quick prospect test, the other a multi-year programme. Axis in hectares, log scale.

Work out your cadastre units and exploration cost

Interactive

Zambia cadastre unit, term and exploration cost calculator

ha

%

years

K per unit
—

Assumptions: a cadastre unit averages 3.34 hectares; small-scale exploration is 3 to 300 units and large-scale 301 to 59,880 units; large-scale licences run 4 years plus two renewals of 3 years and give up 50% of the area at each renewal; small-scale licences run 4 years and are not renewable. Application fees (3,000 fee units small-scale, 10,000 large-scale) and exploration area charges (large-scale 4, 12 and 16 units per hectare in years 1 to 4, 5 to 7 and 8 to 10; small-scale 2 units) come from the ministry notice of 19 June 2024 issued under the repealed 2015 regime and the Minerals Regulation Commission Act, 2024. The 2024 Act leaves current amounts to regulation, so confirm with the Commission and change the fee unit if it has moved. Environmental approval, royalty, taxes, consultants and fieldwork are excluded.

Selling what you find after gold exploration in Zambia

After gold exploration in Zambia, finding gold is one question; being allowed to sell it is another. A person who is not a holder of a mining or mineral processing licence cannot trade in minerals without a mineral trading permit. The Commission must issue the permit within seven days of an application that meets the requirements, it is valid for three years, and trading without one is an offence carrying up to five years in prison. Importing or exporting a mineral also needs a permit from the Commission. The Act also creates a Mining Appeals Tribunal for challenging decisions. None of this is exploration, but a licence that cannot lawfully sell product is a weaker asset, and it is worth reading before you value a project.

A worked example: a 2,500 hectare block

Take 2,500 hectares. At 3.34 hectares a unit that is 749 cadastre units, so it sits in the large-scale exploration tier, well under the 59,880-unit cap. Planning eight years of work means using the first four-year term and one renewal of three years, and the renewal forces you to give up half the area, about 1,250 hectares, leaving 625 hectares after a second renewal. If a satellite screen ranks 20% of the block as priority ground, that is 500 hectares or about 150 units. The screen has to do two jobs. It has to say which 150 units matter, and it has to show that they are connected enough to keep as a compact block after each relinquishment.

If you chose the small-scale tier instead, you could cover at most 1,002 hectares, you would get one four-year term with no renewal, and you would need to be a citizen-owned, influenced or empowered company. That is a perfectly good route for a single prospect with a clear target, and a poor one for a regional search. Many applications for gold exploration in Zambia go wrong by choosing the wrong tier, not the wrong area, and the arithmetic above is how to avoid it.

Gold exploration in Zambia: fees and area charges on the ministry schedule

Money questions are where most plans go soft, so here is what is published for gold exploration in Zambia. A public notice from the Ministry of Mines and Minerals Development, posted by the Mining Cadastre Department on 19 June 2024, says Statutory Instrument No. 25 of 2024 raised the fee unit and penalty unit from 30 ngwee to 40 ngwee with effect from 26 April 2024, and it reprints the schedule under the Mines and Minerals Development (General) Regulations, 2016 in the new amounts. The ministry also hosts the schedule as a PDF. The table below converts it at K0.40 a unit.

Item Fee units Amount at K0.40 a unit
Exploration licence application, small-scale 3,000 K1,200
Exploration licence application, large-scale 10,000 K4,000
Mining licence application: artisanal, small-scale, large-scale 3,000; 15,000; 160,000 K1,200; K6,000; K64,000
Gold panning certificate 500 K200
Mineral trading permit; mineral export permit 7,000; 750 K2,800; K300
Exploration area charge per hectare per year, large-scale 4 (years 1 to 4), 12 (5 to 7), 16 (8 to 10) K1.60, K4.80, K6.40
Exploration area charge per hectare per year, small-scale 2 (years 1 to 4), 5 (5 to 7) K0.80, K2.00
Mining area charge per hectare per year: artisanal, small-scale, large-scale 14; 28; 56 K5.60; K11.20; K22.40

Read that table with two cautions. It was issued under the repealed 2015 regime, and the 2024 Act now says the annual area charge is payable on grant and on each anniversary in “such amount as may be prescribed” (section 57) and that regulations set the fees (section 96). We found no replacement schedule, so confirm the figures with the Commission before you budget. Second, the steepest part is the area charge, because it climbs with the licence age while the licence shrinks: a large-scale explorer pays K1.60 a hectare in the first four years and K6.40 in years eight to ten, on a quarter of the original ground.

Annual exploration area charge per hectare by licence yearLarge-scale exploration area charge steps from K1.60 a hectare in years 1 to 4 to K4.80 in years 5 to 7 and K6.40 in years 8 to 10; small-scale steps from K0.80 to K2.00.Exploration area charge climbs as the licence agesKwacha per hectare per year, at K0.40 per fee unit02468Kwacha per ha1.604.806.400.802.00Years 1 to 4Years 5 to 7Years 8 to 10Large-scale explorationSmall-scale explorationSource: Ministry of Mines and Minerals Development fee notice, 19 June 2024 (SI 25 of 2024).

The rising line is a reason to prune early. A licence that is still sprawling in year eight pays the highest rate on every hectare it keeps for gold exploration in Zambia.

Annual charges, work and losing a right

Section 53 lets the Commission suspend or revoke a right when the holder fails to pay annual area charges, fails to pay royalty, or fails to execute the approved exploration programme, among other grounds, after written notice and 60 days to show cause. The practical point for an explorer is that an exploration licence is a work commitment, not a placeholder. A screening report that sharpens the programme also helps you document that the programme was followed.

From exploration licence to mining licence in gold exploration in Zambia

An exploration licence holder can apply for a mining licence within the last six months of the exploration licence. The Act says the area cannot exceed the area of mineralisation plus what is reasonably needed for infrastructure, and the Commission must grant or reject within 45 days. Large-scale applicants must show financing, a commitment to employ and train citizens and promote local content, and a bankable feasibility study. After a grant, the holder has 180 days to survey and demarcate the area and register a pegging certificate. Mining licences run for three years for artisanal mining, ten for small-scale and twenty-five for large-scale.

From exploration licence to a producing licence in ZambiaSeven steps from an environmental approval and application to survey and pegging after grant.From exploration licence to a producing licence in ZambiaSequence under the Minerals Regulation Commission Act, 20241Get environmental approvalZambia Environmental Management Agency, before exploring2Apply for an exploration licenceComplete contiguous cadastre units and a work programme3Commission considers in order receivedChecks finances, overlap, protected land and consent4Explore within the licence term4 years; 50% relinquished at each large-scale renewal5Apply for a mining licenceWithin six months before expiry of the exploration licence6Commission decidesGrant or reject within 45 days7Survey, demarcate and registerPegging certificate within 180 days of grantSource: Minerals Regulation Commission Act, 2024, sections 10, 15 to 17, 21 (AMLA text).

Steps 1 to 3 are where an application for gold exploration in Zambia succeeds or fails. Checking overlap and protected-land consent first costs very little.

If you hold a boundary or are about to apply, you can draw it on mining.farmonaut.com, Map Your Mining Site or send it through our mining query form, and have a satellite read of the ground while the cadastre works through the queue.

Local content now sits on top of the licensing rules. The regulations gazetted in October 2025 under the Geological and Minerals Development Act reserve a share of mining companies’ procurement of core goods and services for local companies, with a threshold that starts at twenty percent of the annual procurement budget and rises in the regulation text, and they operate from 1 January 2026. If you plan a programme with drilling, camp and survey contracts, ask your adviser how those thresholds affect who you can hire. A satellite screen is a desk service, so it is not a procurement of that kind in the ordinary sense, but your contracting plan around it may be.

Distance rules that shape your layout
The Act requires written consent before you work within 180 metres of an occupied building, within 45 metres of cleared or cropped land, within 90 metres of a dip tank, dam or private water, or on customary village land without the consent of the chief and the local authority. It also covers burial sites, national monuments, railway reserves and land near city boundaries, and exploration inside national parks, game management areas and forests needs the written consent of the authority concerned. Satellite imagery maps most of these buffers before anyone walks the ground.

Gold deposits in Zambia: belts, structures and what the record shows

Start with output, because it frames gold exploration in Zambia. The USGS Minerals Yearbook for 2019 reports that gold output from the Kansanshi mine and smelter, operated by First Quantum, rose almost 12% to 4,522 kilograms from 4,044 kilograms in 2018, and calls Kansanshi the sole source of gold production in the country. That is gold recovered with copper, from a mine north of Solwezi. The same yearbook adds that artisanal and small-scale miners also produced gold, but the amount was not reported, and it cites 504 active mining licences held by artisanal and small-scale miners in 2018.

Recorded gold output in Zambia, 2015 to 2019Gold output was 4,238 kg in 2015, 4,610 in 2016, 4,565 in 2017, 4,044 in 2018 and 4,522 in 2019.Recorded gold output in Zambia, 2015 to 2019Kilograms of gold, mine production as compiled by the USGS01250250037505000Kilograms4238201546102016456520174044201845222019Source: USGS Minerals Yearbook, Zambia 2019 (Au content, kilograms).

Flat for five years. The recorded gold line follows the copper operations, not a separate gold industry, which frames gold exploration in Zambia outside the Copperbelt.

More recent numbers exist, but they do not agree with each other. A September 2026 analysis by Shanghai Metals Market sets the Ministry of Mines’ annual statistical bulletin (4,598 kg for 2022, 2,237 kg for 2023 and 3,141.81 kg for 2024) beside the Minister’s March 2026 reply to Parliament, which gives 2,683 kg for 2022 and 1,962 kg for 2023, and it puts Kansanshi at about 105,000 ounces in 2024 and 116,000 in 2025. The state investor ZCCM-IH puts national output at 127,000 ounces for 2025, according to Miningmx. We would treat any single figure as indicative, and note how little of it comes from anywhere except Kansanshi: the same analysis lists output from the state-owned Zambia Gold Company, which runs the Kasenseli mine, at 28 kg in 2023 and 16 kg in 2024.

Where the official record places gold in Zambia for gold exploration in Zambia

The ministry’s own investment material describes the geology better than the production tables do. Its brochure, published in the late 1990s and still hosted online, says Zambia has a history of small-scale gold mining, with the twenty larger deposits producing slightly more than two tonnes since modern mining began in 1902, and more than 300 gold occurrences recorded, most of them only prospects. Its largest past producers were Dunrobin at 990 kilograms, Jessie and Sasare at 390 each, and Matala at 225. The ministry’s exploration potential page carries the geological reading, summarised here with the vintage in mind.

Setting Where What the sources say
Mwembeshi Shear Zone and syntectonic intrusions Central Zambia, with Rufunsa and eastern Zambia along strike The great majority of gold deposits are mesothermal lodes, in veins and dispersed occurrences in brittle and brittle-ductile shear zones; dilational jogs favour lodes; carbonates, carbonaceous siltstones and ironstones of the lower Katanga act as chemical traps; Jessie and Sasare were past producers
Hook Granite Complex Mumbwa area Only relatively small skarn- and breccia-related occurrences identified; Dunrobin and Matala were the past producers
Zambezi Belt South of the Mwembeshi Shear Zone Thrusting and faulting of the Basement-Muva-Katanga terrain released fluids and left a considerable number of gold prospects; the page recommends screening them for host structure and country rock
Domes Region and Lufilian Arc North-western Zambia, including Kansanshi Copper-gold-uranium lodes in early Lufilian thrust zones in the lower Katanga; Kansanshi is the one operation with recorded gold output
Bangweulu Block Lower Mporokoso Group Minor palaeoplacer gold, compared on the page with Witwatersrand-type settings
North-east fold and thrust zones Luongo, Chambeshi and Shiva Ngandu zones Lode-gold potential described as not yet investigated

A separate view comes from geochemistry. A 2021 paper in China Geology on gold enrichment in Zambia, based on 1:1,000,000 geochemical mapping with Zambian survey staff among the authors, reports the highest median gold values in the Lufilian Arc Belt, where Katanga Supergroup sandstone and shale are widespread, although absolute concentrations in stream sediment are very low. The point is that the regional signal for gold sits in the same arc as the copper, which matters for gold exploration in Zambia.

Kasenseli: a north-western sediment-hosted example for gold exploration in Zambia

One recent academic study shows what a gold target in the Lufilian Arc can look like. A 2023 University of the Witwatersrand master’s thesis by Kapalakasha Mulenga, Exploration Geology of Structurally Controlled Sediment-Hosted Gold Mineralization at Kasenseli, covers about 13 square kilometres on the western end of the Lufilian Arc Fold and Thrust Belt. It finds that economic gold in the Roan and Nguba groups is not common and the area new to exploration, with the better known occurrences linked to the Hook granite and shear zones near Kasempa and Mumbwa. At Kasenseli the gold sits mainly in clast-poor diamictite, controlled by a redox boundary between oxidised arkosic sandstone and reducing diamictite and by north-east to south-west folds and shear faults. Of 1,650 soil samples, only copper proved a reliable pathfinder for gold. For an explorer the lesson is practical: the target is a contact and a structure, and the useful surface clue may be oxidation colour and structure rather than a quartz vein.

Alluvial gold in Zambia, panning and the formalisation push

The ministry’s exploration page records minor palaeoplacer gold in the Bangweulu Block, and the 2024 Act’s gold panning certificate is the right a citizen or co-operative needs to work alluvial gold in Zambia legally. The Zambia EITI’s overview of artisanal and small-scale mining, a study with a 2019 cover date, interviewed site owners in five provinces and found that 17% had no mining rights and that most licensed players held small-scale mining licences or gold panning certificates. It also says the Geological Survey Department sells information on demand and has relied on desk reviews and satellite imagery to monitor artisanal sites remotely.

The policy direction has hardened since. In December 2019 the government announced a plan for the Bank of Zambia to buy 40,000 kilograms of gold in 2020, which the USGS reported as a plan, not an outcome. The Geological and Minerals Development Act, 2025 now creates a Director of Artisanal and Small-Scale Mining and an Artisanal and Small-Scale Mining Fund. In September 2026 ZCCM-IH said it wants to copy Ghana’s gold board model and has partnered with Mining Mineral Resources to buy gold from artisanal miners in North-Western Province, according to Miningmx. The Shanghai Metals Market analysis counts 519 artisanal and small-scale gold-related licences issued in 2024, taken from a ministry performance statement.

Round up when you turn hectares into units
Because a licence has to be complete, contiguous cadastre units, a boundary drawn in hectares will always round up to a whole number of units, and a polygon that clips the corner of a unit still pays for the whole unit. Draw your target area on the unit grid first, then screen it, so that the zones the screen ranks line up with the units you can actually hold.
What a buyer of a Zambian gold licence should ask
Ask for the licence number and check it on the cadastre, ask which tier and how many cadastre units, ask what the work programme committed to, and ask for the assay data behind any grade. In a market where recorded gold is a copper by-product, a claim of a known gold deposit needs documents, and any gold exploration in Zambia deal should come with a licence file. This is general information, not investment advice.

What satellites can and cannot see in Zambia

Most of the land that matters for gold exploration in Zambia is woodland and farmland on thick soil. That limits what optical imagery alone can say. Our published Zambian case study on a 283 hectare gold block says so directly: because dense vegetation limits optical mapping, the screen leaned on thermal, radar, magnetic and vegetation-stress layers. In practice that means we use more than a single optical scene, we look for the way vegetation responds to the ground beneath it, and we treat every result as a candidate to test.

For gold in Zambia the same logic applies whether the target is a hard-rock vein or a stream. Alluvial gold in Zambia is usually worked in drainage lines, and drainage is something a satellite maps well: channel positions, floodplain extent, bars and disturbed ground from earlier panning. A gold panning certificate is issued over an area defined by coordinates, so a drainage map in the right datum is useful before you apply. It tells you nothing about how much gold sits in the gravel, which only panning and sampling can answer.

The sourced geology tells us what to look for in gold exploration in Zambia. The Mwembeshi Shear Zone is described as a major inter-cratonic shear zone reactivated between about 950 and 450 million years ago, so a screen can map its lineaments and the dilational bends along them where lodes are favoured. The carbonate, ironstone and carbonaceous siltstone traps in the lower Katanga show up as colour and drainage contrasts where they outcrop. At Kasenseli the controlling feature was an oxidised-to-reduced contact, which is a colour and iron-oxide question as much as a structural one. And the Hook Granite ground near Mumbwa is skarn and breccia gold on the margin of an intrusion, so intrusion edges and magnetic contrasts are the first things to rank. None of these signals sees gold. Each one narrows where gold exploration in Zambia should put its first soil lines.

Two Zambian screens we have published on gold exploration in Zambia

The first published Zambia case study covers a 283.2 hectare block, redacted at the holder’s request. It fused 21 data layers into a prospectivity surface at 10 metre resolution and ranked ten zones covering 64.2 hectares, about 22.7% of the block, for drilling. The case study rates all ten zones low confidence and says that hydrothermal alteration and magnetic signatures were marginal, and it states that no drilling or assay supports the figures. The second covers a 49.66 hectare licence where the scan flagged three zones over 7.45 hectares, about 15.0% of the licence, with medium confidence and no drilling yet. Both are exploration-target screens for gold exploration in Zambia, not resource estimates, and they show what a screen can and cannot tell you.

  • โœ” Radar and thermal layers. They work through cloud and canopy, which matters in the rainy season.
  • ๐Ÿ“Š Geophysics comes first when you can get it. The Geological Survey Department offers airborne magnetic and regional gravity data, which see through cover that satellites cannot.
  • Vegetation-stress and drainage patterns can hint at structure where outcrop is rare, but they are indirect.
  • โš  Honest limits. A low-confidence screen is a reason to sample, not a reason to drill.

Zambia cadastre portal and geological data

The ministry announced the move from manual to online filing in a public notice of 15 December 2023, describing a self-service online mining cadastre system developed with Smart Zambia and a spatial technology partner. The Zambia Mining Cadastre portal at portal.miningcadastre.com, a Trimble Landfolio system, lets registered users submit new licence and renewal applications, proof of payment, reports, transfers and licence shape alterations, and a public cadastre map is linked from the same page. Since the 2024 Act took effect on 13 June 2025 the Minerals Regulation Commission grants, suspends and revokes rights, so ask which system and which fees the Commission is using for your application. For gold exploration in Zambia, our cadastre portal guide compares Zambia’s portal with other countries. Because applications are handled in the order received, an incomplete or overlapping application can lose its place.

The Geological Survey Department, established in 1950, is the principal national repository of geoscientific information, so it is the first call for data on gold exploration in Zambia. Its geophysics unit provides airborne magnetic and regional gravity data, its records unit keeps geological literature, maps, reports and field data, and its cartographic unit produces digitised geological maps and GIS services. The ministry’s reports and maps page says maps and reports for the mapped areas can be bought from the department, including magnetic data, gravity and geological information, and lists a 1:1,000,000 geological map, a 1:2,000,000 mineral occurrence map, six 1:250,000 geological maps, memoirs, economic reports and a digital database on mineral occurrences, geochemistry, geophysics and satellite images. The page gives a Lusaka postal address and an email for enquiries. The Geological and Minerals Development Act, 2025 gives the Director of Geological Survey the job of building a comprehensive geo-scientific database and lets the department provide consultancy and geological services for a prescribed fee, and the Zambia EITI study above notes that data is sold on demand and that some small miners find the price high and the formats hard to read.

We are not a licensing authority, land-title adviser or regulator. Farmonaut does not file applications, check title or advise on which licence to hold. What we offer is a satellite prospectivity read of the polygon you choose.

Community consent and forest edges
Zambian law requires chiefs’ and local authority consent on customary land, and written consent in parks, forests and game management areas. Screening a boundary before you approach a community lets you design the programme around farms, dip tanks and water, and avoids planning gold exploration in Zambia through land you cannot enter without consent.

Satellite screening for gold exploration in Zambia

For gold exploration in Zambia you send us the boundary as a KML, KMZ or coordinates, with the country and target mineral. We choose multispectral or hyperspectral data, run the analysis and deliver in 5 to 20 business days, depending on area size and mineral complexity. Our satellite-based mineral detection flags likely mineralised zones, alteration halos and structures, and the premium report adds prospectivity heatmaps, high-potential zones with estimated location and depth ranges, geological interpretation and georeferenced GIS files. Premium+ adds TargetMax drilling intelligence and 3D subsurface models.

  • โœ” Speed and cost. Satellite screening can lower early-exploration cost by up to 80 to 85% and cut timelines from months to days, compared with starting on the ground.
  • ๐Ÿ“Š Fit to your tier. A 10 hectare small-scale block and a 200,000 hectare large-scale licence need very different screens, and we scope each one differently.
  • See a typical deliverable in the 3D prospectivity mapping overview.
  • โš  Not licensing or investment advice. Targets are exploration targets, not resources.

“In Zambia a large-scale exploration licence gives up half its area at every renewal, so choose the best ground early.”

Planning gold exploration in Zambia? See what the polygon shows first.

Send us the boundary of the exploration licence you hold or plan to apply for. We return a satellite prospectivity read with ranked zones, structures and next steps, before you commit to fees and fieldwork.

A short checklist for gold exploration in Zambia

  1. Confirm the fee unit and area charge with the Commission, because the 2024 Act leaves them to regulation.
  2. Count in cadastre units and choose small-scale or large-scale exploration deliberately.
  3. Get the environmental approval route clear before you plan fieldwork.
  4. Check consent areas: buildings, farmland, water, villages, parks and forests.
  5. Screen the polygon and compare it with the Geological Survey’s magnetic and mapping data.
  6. Plan the renewal: a large-scale licence gives up half the area, a small-scale one cannot be renewed.

Frequently asked questions

What licence do I need for gold exploration in Zambia?

An exploration licence from the Minerals Regulation Commission, over complete contiguous cadastre units: three to 300 units for small-scale exploration, 301 to 59,880 for large-scale. You also need prior environmental approval from the Zambia Environmental Management Agency.

How big is a Zambian cadastre unit?

The Act defines it as a quadrilateral six arc-seconds on each side, with an average surface of 3.34 hectares.

Is there alluvial gold in Zambia that I can pan legally?

The Act provides a gold panning certificate for citizens and citizen co-operatives, valid for two years over an area set by coordinates, and not available where a mining right exists. Ask the Commission for the current application route.

Where are the main gold deposits in Zambia?

Recorded output comes almost entirely from the Kansanshi copper mine near Solwezi. The ministry’s geological reading places gold deposits in Zambia along the Mwembeshi Shear Zone (Mumbwa, Rufunsa and eastern Zambia, with Dunrobin, Jessie and Sasare as past producers), in the Zambezi Belt, in thrust zones of the Domes Region and Lufilian Arc, and as minor palaeoplacer in the Bangweulu Block. Most of the 300-plus recorded occurrences are prospects, not mines.

Can satellites find gold in Zambia?

They cannot see gold. They map structures, alteration, drainage and vegetation response that can indicate prospective ground, with limits under dense vegetation, and they cannot see the deeper lodes. Our own Zambian case studies state that results are exploration targets with no drilling confirmation.

How long does gold exploration in Zambia last under a licence?

A small-scale exploration licence lasts four years and cannot be renewed. A large-scale licence lasts four years and can be renewed twice for three years each, so ten years at most, with half the area relinquished at each renewal and the area charge per hectare rising each stage.

What does a Zambian exploration licence cost?

On the ministry notice of 19 June 2024 the application fee is K1,200 for small-scale and K4,000 for large-scale exploration, at K0.40 per fee unit, plus an annual area charge of K1.60 per hectare for large-scale exploration in years one to four, rising to K6.40 in years eight to ten. The 2024 Act leaves current amounts to regulation, so confirm them with the Commission.

Is the 2015 Mines and Minerals Development Act still in force?

No. The 2024 Act repealed it and came into operation on 13 June 2025 under Statutory Instrument 42 of 2025. Licences issued under the old Act stay valid until expiry, revocation or surrender, and applications pending at commencement are processed under the new Act.

Can Farmonaut apply for a Zambian licence for me?

No. We are not a licensing authority or filing agent. We provide satellite prospectivity analysis for ground you hold or plan to apply for.

Reviewed October 2026 against the Minerals Regulation Commission Act, 2024 (Parliament of Zambia and African Mining Legislation Atlas texts), Government Gazette No. 7770 of 13 June 2025 with Statutory Instruments 41 and 42 of 2025, the Geological and Minerals Development Act, 2025, the Ministry of Mines and Minerals Development fee notice of 19 June 2024 and its cadastre, geological survey and online-filing notices, the ministry’s investment brochure and exploration page, the Zambia EITI artisanal mining overview, the USGS Minerals Yearbook for Zambia, a 2023 University of the Witwatersrand thesis on Kasenseli, and Farmonaut’s published Zambia case studies. Fees, annual area charges and portal rules change, and the 2024 Act leaves them to regulation, so confirm with the Minerals Regulation Commission before you apply. Targets are exploration targets, not resources. Nothing here is legal or investment advice.






Leave a Comment

Your email address will not be published. Required fields are marked *

Farmonaut Farmonaut Trusted by 200,000+ users and 100+ businesses 200,000+ users trust us GH flagNanita Company LimitedGH flagEnergy and Resources LtdGH flagDenkyira Nkoranza ConcessionTZ flagMwerezi Minerals Company LimitedTZ flagRiverside Resources LimitedTZ flagRamani Investments LtdTZ flagAfrican Venture Partners HoldingTZ flagComfix & Engineering LimitedTZ flagCritica Metals LimitedTZ flagImperial Impex FZECD flagCongo Mining SolutionsCD flagCIMISCO SARLCD flagViahara MiningMR flagMining SARLSN flagSenGold Invest SASSN flagSahel Shipping SANE flagSania CorporationNE flagSahara MiningNE flagEnterprise TakreemKE flagSean Mining LimitedKE flagSMA Investments LtdZA flagNTS Group (Pty) LtdZA flagKlusetic Mining InvestmentsZW flagMine4AfricaZW flagTimestream MiningZM flagLithspo Minerals LimitedZM flagMulopwe Metals Mining LtdZM flagRains of FavourUS flagTintina Mining GroupUS flagHuckleberry Garnet LLCUS flagProcess Metrology LLCUS flagWSP Investment CompanyAU flagDalgety Minerals Pty LtdIN flagVortex Minerals Pty LtdIN flagSwati MineralsBW flagFaith At Work (Pty) LtdET flagGeotech Mining Solutions plcSL flagVulcan International LimitedUG flagKidepo AssociatesML flagGKY Mining Get started