Silvertip is Coeur Mining’s silver-zinc-lead project in northern British Columbia, 16 km south of the Yukon border. Mining stopped in February 2020; at the end of 2025 it held 57.6 million oz of measured and indicated silver (Coeur 10-K).

Key takeaways
- Location: Cassiar Mountains, northern BC, about 59.93ยฐ N, 130.34ยฐ W, reached by a 25 km road off the Alaska Highway (Coeur 10-K, 2025; BC MINFILE).
- Status: mining and milling suspended since February 2020; Coeur runs it as an exploration project with a restart study under way (Coeur, 2026).
- Resource: 8.343 Mt measured and indicated at 214.68 g/t silver, 6.71% zinc and 3.73% lead at 31 December 2025 (Coeur 10-K).
- Spend: about US$35 million of drilling planned for 2026, plus about US$15 million of study capital added in mid-2026 (Coeur releases).
- Obligations: 2.5% NSR royalty to Triple Flag and annual payments to the Kaska Nation (Coeur 10-K, 2025).
In this article
- Where is the Silvertip mine?
- Silvertip mine at a glance
- Who owns the Silvertip mine? Ownership history
- Why Coeur paused mining at Silvertip
- Coeur Silvertip resources: tonnes, grades and contained metal
- Geology: what kind of deposit is Silvertip?
- Exploration and the restart study at Silvertip
- Royalty, First Nations agreements and permits
- Where Silvertip fits in the silver market
- What consultants should check on a project like Silvertip
- Frequently asked questions
The Silvertip mine is Coeur Mining’s 100%-owned silver-zinc-lead project in the Cassiar Mountains of northern British Columbia, about 16 km south of the Yukon border. It produced concentrate from 2018 until Coeur suspended mining in February 2020, and it is now an exploration project with a restart study under way. At 31 December 2025 it held measured and indicated resources of 8.34 million tonnes at 214.68 g/t silver, 6.71% zinc and 3.73% lead, according to Coeur’s 2025 annual report (Form 10-K).
This guide is written for mining consultants and analysts who need the facts in one place: the exact location, the ownership chain, why operations stopped, the latest resource figures, the geology, the royalty and First Nations agreements, and what Coeur is spending on the project now. Every figure carries its date and source.
Where is the Silvertip mine?
Silvertip sits near the Tootsee River in the Cassiar Mountains, in the Liard Mining Division of British Columbia. The provincial MINFILE record 104O 038 places the deposit at latitude 59ยฐ55’38” N and longitude 130ยฐ20’32” W (about 59.93ยฐ N, 130.34ยฐ W), on NTS map sheet 104O/16.
Coeur’s 10-K describes the site as 10 miles (16 km) south of the Yukon border, reached by a 25 km mine access road that leaves the Alaska Highway. The Sentinel-2 image at the top of this page frames the mine area.
Older web pages, including an earlier version of this one, placed Silvertip in the Kootenay region of southern British Columbia or called it the “Silverton mine”. Both are wrong. Silverton is a different community in the south of the province, and the Kootenays lie at the opposite end of British Columbia. Silvertip is a far-north, fly-in or long-drive site where winter conditions shape logistics, so weather planning matters; teams that track remote sites often pull forecasts through a satellite weather API rather than relying on distant stations.
The property is large. Coeur reports 103 contiguous mineral claims of about 123,566 hectares plus three mining leases of about 1,829 hectares, for a total of roughly 125,395 hectares (309,858 acres) at the end of 2025. For comparison with other Canadian districts, see our Canada mineral deposits map.
Silvertip mine at a glance
| Item | Detail | Source and date |
|---|---|---|
| Owner | Coeur Silvertip Ltd., a wholly owned subsidiary of Coeur Mining, Inc. (NYSE: CDE) | Coeur 10-K, 2025 |
| Stage | Exploration project; mining and milling suspended since February 2020 | Coeur 10-K, 2025 |
| Location | Cassiar Mountains, northern British Columbia, 16 km south of the Yukon border | Coeur 10-K, 2025; MINFILE 104O 038 |
| Metals | Silver, zinc, lead (gold, tin, copper and antimony noted as minor) | MINFILE 104O 038 |
| Deposit type | Carbonate-hosted massive sulphide (manto-style replacement) | Coeur 10-K, 2025; MINFILE |
| Mining method | Underground | Coeur 10-K, 2025 |
| Product | Lead and zinc concentrates carrying silver | Coeur 10-K, 2025 |
| Land | About 125,395 ha (103 claims and 3 mining leases) | Coeur 10-K, 2025 |
| Royalty | 2.5% net smelter return to Triple Flag | Coeur 10-K, 2025 |
| M&I resource | 8.343 Mt at 214.68 g/t Ag, 6.71% Zn, 3.73% Pb (31 Dec 2025) | Coeur 10-K, 2025 |
Who owns the Silvertip mine? Ownership history
Silvertip has passed through many hands since prospectors found galena-rich float on Silvertip Hill in 1955. The BC Geological Survey’s MINFILE history gives the main steps:
- 1956-1968: Conwest Exploration, then a Noranda-led joint venture and other optionees drilled and trenched gossans, but most sulphides near surface were deeply oxidised and grades were low.
- 1980s: Regional Resources, working the ground as the Midway property, found massive sulphide at the top of the McDame Group limestone. Drilling between 1982 and 1984 outlined the Silver Creek and Discovery zones.
- 1996-2002: Imperial Metals bought Regional Resources and renamed it Silvertip Mining Corporation. Drilling found the Silver Creek Extension and Discovery North zones. Silver Standard bought the project in 2002.
- 2010-2013: Silvercorp Metals bought it in February 2010, flew a 4,113 line-km airborne survey and drilled 36 holes.
- 2013-2017: JDS Silver, a private company, bought Silvertip in late 2013 and began mine construction in late August 2015.
- 2017: Coeur agreed to buy JDS Silver for an initial US$200 million plus up to US$50 million in performance-linked payments, as reported by MINING.COM in September 2017. The deal closed in October 2017.
- 2018-2020: Coeur started production in March 2018 and declared commercial production on 1 September 2018. Mining was suspended in February 2020.
Coeur itself has grown since. It bought SilverCrest (Las Chispas, Mexico) in 2025 and, under an agreement signed on 2 November 2025, New Gold (the New Afton and Rainy River mines in Canada). Coeur’s third-quarter 2026 release describes seven wholly owned operations, with Silvertip listed separately as a polymetallic critical minerals exploration project.
Why Coeur paused mining at Silvertip
Coeur’s own explanation, repeated in its 2025 10-K, is that the ramp-up after the 2017 purchase was slower and less profitable than planned. Two causes are named: mill availability and maintenance problems that were bigger than expected, and weaker zinc and lead markets. The MINFILE entry notes the planned mill rate in 2018 was 250 tonnes per day at start-up, rising to 750 tonnes per day by year-end, and that Coeur’s 19 February 2020 release blamed deteriorating zinc and lead markets for the pause.
Base-metal prices explain part of the story. US Geological Survey data show the LME cash zinc price averaged 158.1 US cents per pound in 2022, fell to 120.1 cents in 2023 and was estimated at 130 cents in 2025, while North American lead stayed near 106-117 cents (USGS Mineral Commodity Summaries, 2026). Because zinc and lead make up a large share of the value of each tonne at Silvertip, those swings matter as much as the silver price.
For a consultant, the lesson is practical: a high-grade deposit can still struggle if the mill cannot run at design rates. Any restart case will be judged first on processing reliability.
Coeur Silvertip resources: tonnes, grades and contained metal
Silvertip has no reported mineral reserves at present. Coeur reports mineral resources, which are estimates of material with reasonable prospects for economic extraction, ranked by confidence from inferred (lowest) through indicated to measured (highest). Grade is the metal content per tonne of rock: g/t means grams per tonne for silver, and % is the weight share for zinc and lead.
Chart
Zinc and lead in the resource fell after the 2025 model update
Contained metal, million pounds, end-2024 vs end-2025
Chart
Silvertip silver grade by resource category
Silver grade, grams per tonne, 31 December 2025
| Category (31 Dec 2025) | Tonnes (000s) | Silver g/t | Silver oz (000s) | Zinc % | Lead % |
|---|---|---|---|---|---|
| Measured | 1,173 | 244.47 | 9,219 | 6.60 | 4.61 |
| Indicated | 7,171 | 209.81 | 48,369 | 6.73 | 3.58 |
| Measured + indicated | 8,343 | 214.68 | 57,588 | 6.71 | 3.73 |
| Inferred | 1,960 | 181.40 | 11,433 | 6.31 | 3.12 |
Source: Coeur Mining, Form 10-K for 2025, summary mineral resource tables. Contained metal in measured and indicated is 57.6 million oz silver, 1,234.2 million lb zinc and 685.5 million lb lead.
The resource is reported above a net smelter return (NSR) cut-off of US$130 per tonne. NSR is the value of the metal a tonne would earn after smelter charges, transport and royalties; a cut-off is the minimum value a block must have to count. The estimate assumes silver recovery of 83-84%, zinc recovery of 82-83%, lead recovery of 89-90%, mining costs of US$68.77 per tonne and processing costs of US$46.49-58.20 per tonne (Coeur 10-K, footnote 8).
How the resource changed in the latest model update
Silver held almost flat in measured and indicated (57.7 to 57.6 million oz), but zinc fell about 19% and lead about 11%. The inferred category dropped more: silver by about 29%, lead by 33% and zinc by 43%. Coeur attributes every change to technical revisions, after the geological model was completed in 2025. Earlier, at the end of 2022, MINING.COM reported measured and indicated resources of 6.4 million tonnes at 265 g/t silver, 9.68% zinc and 5.12% lead, so the newer model carries more tonnes at lower grades.
Calculator
What metal and value sit in a silver-zinc-lead resource?
Enter tonnes, grades, recoveries and today’s prices for Silvertip or any similar project.
- Contained silver (oz): 57,584,363
- Contained zinc (lb): 1,234,180,007
- Contained lead (lb): 686,064,296
- Recovered silver value (US$): $2,496,282,144
- 2.5% royalty on recovered value, upper estimate (US$): $111,954,875
Defaults are Silvertip’s measured and indicated resource from Coeur’s 2025 10-K; the 85% recovery is an example inside the 10-K’s 82-90% range for the three metals. Prices are examples only; use today’s price (silver about US$51/oz on 12 Nov 2026 per Fortune; LME zinc averaged about US$1.30/lb and North American lead about US$1.06/lb in 2025 per USGS). Value ignores smelter charges, transport and mining costs, so it is a gross figure, not a project value. The royalty line applies 2.5% to recovered gross value as a simple upper estimate.
Geology: what kind of deposit is Silvertip?
Silvertip is a carbonate-replacement, or manto, deposit. Hot metal-bearing fluids moved through limestone and replaced it with massive sulphide: pyrite, sphalerite (the zinc mineral), galena (the lead mineral) and silver-bearing sulphosalts. MINFILE also lists a sedimentary exhalative (SEDEX) classification for part of the system.
The host rock is the limestone at the top of the Middle-Upper Devonian McDame Group. It is capped unconformably by mudstones of the Earn Group, which acted as a seal and trapped the fluids in the carbonate below. Mineralisation forms two styles: flat, cap-like manto bodies at the limestone-shale contact (the Lower Zone) and stratigraphically higher zones (the Upper Zone). Breccias from old karst collapse added open space for sulphides to fill.
The fluid source is not proven, but the high silver and the presence of tin point to a magmatic origin, according to MINFILE; dikes about 2 km away are dated at roughly 66 million years. The mid-Cretaceous Cassiar batholith lies to the west. If you want to compare this style with veins, porphyries and SEDEX bodies, our guide to types of ore deposits sets them side by side.
Grades can be very high in places. In February 2024, MINING.COM reported Coeur’s best intercept as 4.9 metres at 1,261 g/t silver, 22.4% zinc and 22.0% lead, with traces of indium, gallium and tin.
โถ Remote sensing for mining explained without jargon ยท 2:01
Exploration and the restart study at Silvertip
Coeur has spent steadily on drilling since the pause. In February 2024 it raised about C$34 million (US$25 million) through flow-through shares to fund exploration at Silvertip, according to MINING.COM. Flow-through shares pass Canadian exploration tax deductions to investors.
Chart
What Silvertip cost Coeur in 2025
US$ million, year to 31 December 2025
The fourth-quarter 2025 results release gives the most detail:
- About US$6 million was spent at Silvertip in the fourth quarter of 2025, with up to five rigs (one underground, four surface).
- Scout and expansion drilling targeted the Southern Silver, Discovery, Camp Creek and Saddle zones.
- Coeur said it met its 2025 aims: completing the geological model, drilling to support the study programme, and finishing regional programmes started in 2024.
- About US$35 million of drilling was planned for Silvertip in 2026 to support the study and expand the resource.
In its second-quarter 2026 release, Coeur raised its capital budget to include about US$15 million of development capital at Silvertip for further study work. The third-quarter 2026 release (4 November 2026) repeats the same priority: scout, expansion and infill drilling to support the study and expand the resource base.
A restart study for a northern site will also weigh haulage and energy. Concentrate trucks run on the access road and the Alaska Highway, so fleet management and emissions reporting through tools such as carbon footprinting are part of the operating picture that buyers and lenders now ask about. Smelters and buyers increasingly ask for chain-of-custody records for concentrate, the same idea as product traceability in other supply chains.
Royalty, First Nations agreements and permits
Three obligations shape the economics of any restart:
- Royalty: a 2.5% net smelter return (NSR) royalty to Triple Flag on all mineral products, paid quarterly (Coeur 10-K, 2025). An NSR royalty is a share of revenue after smelter and transport deductions, paid before mining costs.
- Kaska Nation: an agreement provides annual payments to the Kaska Nation tied to the property’s financial performance and the yearly average silver price (Coeur 10-K, 2025).
- Traditional territories: MINING.COM reported in 2024 that the project lies within the traditional territories of the Kaska and Tahltan Nations and that Coeur has signed participation agreements with both.
On permits, Coeur’s 10-K says any expansion at Silvertip will need new or amended permits, and that the site is inspected by the British Columbia Ministry of Mining and Critical Minerals. Environmental baseline work at Silvertip is long-running: the 2017 MINING.COM report cites 20 years of baseline data collected before Coeur’s purchase.
โถ The seven environmental impacts of mining explained in clay animation ยท 2:31
Where Silvertip fits in the silver market
Canada is a modest silver producer. The USGS (2026) estimates Canada mined about 400 tonnes of silver in 2025, against 6,300 tonnes in Mexico and 3,600 tonnes in Peru. One ounce is 31.1 grams, so 57.6 million oz equals about 1,790 tonnes of silver in place, or roughly four and a half years of Canadian mine output at the 2025 rate, before mining and recovery losses.
Chart
Silver mine output, selected countries
Tonnes of silver, 2025 estimate
Silver price levels move fast. Fortune reported a spot price of US$51.04 per ounce at 6:30 a.m. Eastern Time on 12 November 2026; check a live quote before using any figure. For the largest producing silver mines worldwide, see our ranking of the top silver mines in the world, and for the leading country, our guide to where silver is mined in Mexico.
What consultants should check on a project like Silvertip
If you are reviewing Silvertip, or a similar carbonate-replacement project, these are the questions that decide whether the numbers hold:
- Mill performance: what failed in 2018-2020 and what the study changes. Ask for availability and recovery data from the operating period.
- Metal mix: zinc and lead carry much of the value, so test the case at low base-metal prices, not just high silver.
- Resource confidence: how much of the plan rests on inferred material, and how the 2025 model revisions changed tonnes and grades.
- Cut-off logic: the US$130 per tonne NSR cut-off depends on price, recovery and cost assumptions; rerun it with current inputs.
- Deductions: the 2.5% NSR royalty, Kaska payments, treatment and refining charges and trucking costs all come off the top.
- Permits and relationships: confirm the status of permit amendments and the participation agreements with the Kaska and Tahltan Nations.
- Regional upside: the land package is about 125,000 ha; ask which targets (Southern Silver, Camp Creek, Saddle and others) have drill results.
For early screening of large northern land packages, satellite imagery can map gossans, iron-oxide staining and structure across ground that is costly to walk. Farmonaut provides satellite-based mineral screening of a claim or licence outline, as one input ahead of mapping and drilling.
Frequently asked questions
Where is the Silvertip mine located?
In the Cassiar Mountains of northern British Columbia, Canada, about 16 km south of the Yukon border, at roughly 59.93ยฐ N, 130.34ยฐ W. A 25 km access road connects it to the Alaska Highway.
Who owns Silvertip?
Coeur Silvertip Ltd., a wholly owned subsidiary of Coeur Mining, Inc. (NYSE: CDE). Coeur bought the project from JDS Silver in 2017.
Is the Silvertip mine operating?
No. Mining and milling were suspended in February 2020. Coeur classes Silvertip as an exploration project and is drilling and funding a study on a possible future operation (Coeur releases, 2025-2026).
Why did Coeur suspend Silvertip?
Coeur cites mill availability and maintenance problems during ramp-up and weak zinc and lead markets.
How much silver does Silvertip contain?
At 31 December 2025, measured and indicated resources held 57.6 million oz of silver, plus 11.4 million oz inferred (Coeur 10-K). These are resources, not reserves.
What metals does Silvertip produce?
Silver, zinc and lead, in lead and zinc concentrates. MINFILE also lists gold, tin, copper and antimony as minor commodities.
Is Silvertip the same as Silverton mine?
No. Silverton is a different place in southern British Columbia. Silvertip is in the far north of the province near the Yukon.
What royalty applies at Silvertip?
A 2.5% net smelter return royalty payable to Triple Flag, plus annual payments to the Kaska Nation under a separate agreement.
What type of deposit is Silvertip?
A carbonate-hosted massive sulphide (manto) deposit in McDame Group limestone, sealed by Earn Group mudstones.
When could Silvertip restart?
Coeur has not announced a restart date. Its 2026 releases describe study work and drilling, with about US$15 million of development capital added for the study.
How big is the Silvertip property?
About 125,395 hectares (309,858 acres): 103 mineral claims plus three mining leases (Coeur 10-K, 2025).
More from Farmonaut: agro admin app, crop loan and insurance.
This page is for information only. It is not investment advice. Coeur Mining is named for factual reference; no buy or sell view is given.
Farmonaut mining
Map your own project area from space
Consultants can send a claim or licence outline as KML/KMZ or a polygon and get a quote for a satellite mineral screen, delivered in 5 to 20 business days.
Mining Pro sample view, synthetic data
Sources
- Coeur Mining, Form 10-K for fiscal 2025 (SEC EDGAR, 2026): sec.gov
- BC Geological Survey, MINFILE 104O 038 Silvertip: minfile.gov.bc.ca
- Coeur Mining, fourth-quarter and full-year 2025 results release (2026): s201.q4cdn.com
- Coeur Mining, second-quarter 2026 results (Nasdaq, 2026): nasdaq.com
- Coeur Mining, third-quarter 2026 results (Investing News, 2026): investingnews.com
- MINING.COM, Coeur Mining acquires Silvertip mine (2017): mining.com
- MINING.COM, Coeur raising $25 million via flow-through shares (2024): mining.com
- The Northern Miner, Coeur halts Silvertip (2020): northernminer.com
- USGS, Mineral Commodity Summaries 2026: Silver: pubs.usgs.gov
- USGS, Mineral Commodity Summaries 2026: Zinc: pubs.usgs.gov
- USGS, Mineral Commodity Summaries 2026: Lead: pubs.usgs.gov
- Fortune, Current price of silver, 12 November 2026: fortune.com
Discussion
Questions, corrections or field experience? Share them below. First-time comments are reviewed before they appear, and your email is never published.
No comments yet. Be the first to add a question or your experience.



Client · Oregon, USA · Gold
Exploration consultancy · South Africa · Gold
Licence holder · Niger · Gold
Licence holder · Nigeria · Gold + lithium
Client · Tanzania · Gold
Client · Somalia · Gold
Client & affiliate partner · Ghana · Gold