Gold processing ยท Heap leach guide
Gold Heap Leaching: Process, Recovery and Costs
Gold heap leaching stacks low-grade ore on a lined pad and drips dilute cyanide through it for weeks or months. The US EPA puts typical recovery at 60 to 80% on ore under about 1.4 g/t; a 2025 Idaho feasibility study costs it at US$10.52 per tonne.

Key takeaways
- The EPA gives 60 to 80% as typical heap leach gold recovery, with an average leach cycle of about three months.
- Heaps are generally used on ore under about 0.04 oz per short ton (about 1.4 g/t); higher grades usually go to a mill (EPA).
- The DeLamar feasibility study (effective December 2025) estimates US$10.52 per tonne site operating cost and 72.3% average gold recovery.
- In the same study, oxide zones recover 68 to 88% of gold in column tests, transitional zones only 37 to 71%.
- Nevada, where commercial gold heap leaching began at Cortez around 1971, produced about 64% of US mine gold in 2025 (USGS, 2026).
In this article
- Gold heap leaching at a glance
- How gold heap leaching works, step by step
- Which gold ores suit heap leaching
- Heap leach gold recovery: what to expect
- Heap leach costs per tonne and capital cost
- Heap leaching vs milling for gold
- Heap leach gold mines in Nevada and the US
- Cyanide, alternatives and the Cyanide Code
- Heap leach monitoring and closure
- How to test whether your gold ore can be heap leached
- Advantages and limits of heap leaching
- Frequently asked questions
Gold heap leaching is a way to pull gold out of low-grade ore without a mill. Ore is stacked on a lined pad, a weak cyanide solution is dripped over it for weeks or months, and the gold-bearing liquid that drains out is run through activated carbon or zinc dust. The US EPA puts typical heap and valley-fill recovery at 60 to 80 percent of the gold, with an average leach cycle of about three months, and says the method is generally used on ore grading under 0.04 troy ounces per short ton (about 1.4 grams per tonne).
This guide is for licence holders, mine owners and consultants deciding whether an oxide gold deposit could be heap leached. It covers the steps, which ores work, what recovery and costs look like in a recent feasibility study, how heaps compare with a mill, and how cyanide is managed. A calculator lets you test your own tonnes, grade, recovery and cost. Every changeable figure carries its source and date.
Gold heap leaching at a glance
| Item | Typical value | Source |
|---|---|---|
| Ore grade suited to heaps | Under about 0.04 oz per short ton (about 1.4 g/t); higher grades usually go to a tank leach mill | US EPA, cyanide treatment report |
| Solution strength | 0.5 to 1.0 lb of sodium cyanide per ton of solution | US EPA |
| Solution pH | 9.5 to 11, best near 10.5 | US EPA |
| Lift height | 5 to 30 feet of ore per lift on permanent heaps | US EPA |
| Gold in pregnant solution | About 1 to 3 ppm | US EPA |
| Leach time | About 3 months on average; Round Mountain used 60 days for crushed ore and about 120 days for run-of-mine ore | US EPA; Kinross 40-F (2019) |
| Gold recovery | 60 to 80% typical; 72.3% life-of-mine average in the DeLamar feasibility study | US EPA; DeLamar FS (2025) |
| Crush size, recent design | P80 of 19 mm (80% of ore passing 19 mm) | DeLamar FS (2025) |
| Site operating cost, recent design | US$10.52 per tonne processed, life of mine | DeLamar FS (2025) |
Two terms recur below. Grade is the amount of gold in the rock, given in grams per tonne (g/t) or troy ounces per short ton (oz/t); 1 oz/t is about 34.3 g/t. Recovery is the share of that gold the process actually gets out.
How gold heap leaching works, step by step
A heap leach is simple in idea and fussy in practice. Most failures come from poor permeability (solution cannot flow evenly through the heap) or from ore that was never suited to cyanide in the first place.
Infographic
Gold heap leaching in 6 steps
- 1Mine and crushRun-of-mine or crushed ore, often to 10 to 25 mm.
- 2AgglomerateCement or lime binds fines in clay-rich ore.
- 3Stack on a lined padLifts of 5 to 30 feet on HDPE liners.
- 4IrrigateDilute sodium cyanide at pH near 10.5.
- 5Collect and recoverPregnant solution to carbon columns or Merrill-Crowe.
- 6Rinse and closeDestroy residual cyanide, reshape and revegetate.
1. Mine and, if needed, crush the ore
Some operations stack ore straight from the pit. This is called run-of-mine (ROM) ore. Others crush it first so the solution can reach more of the gold. The EPA notes that about half of heap operations crush and agglomerate their ore before stacking (Bureau of Mines data cited by EPA). Crushing costs money but usually lifts recovery, because gold locked inside large rocks never sees the solution.
2. Agglomerate clay-rich ore
Agglomeration means tumbling the crushed ore with cement or lime so that fine particles stick to coarse ones. Without it, clay and fines plug the heap and the solution channels down a few paths. In the DeLamar project in Idaho, most DeLamar ore needs cement agglomeration because of its clay content, while the nearby Florida Mountain ore does not (DeLamar feasibility study, 2025).
3. Stack the ore on a lined pad
The pad is a graded surface with a compacted soil or clay base and one or more plastic liners, usually HDPE (high-density polyethylene), with a drain layer on top. Ore is placed in lifts. The EPA describes two pad types: permanent heaps built up lift by lift, and on-off pads where spent ore is removed and the pad reused. A sloped valley-fill design, where the heap fills a lined valley, is a third option on steep ground.
4. Irrigate with cyanide solution
Drip lines or sprinklers spread a dilute sodium cyanide solution over the top lift. Lime keeps the pH high so the cyanide stays in solution instead of forming hydrogen cyanide gas. Oxygen is needed for gold to dissolve, which is why the solution is aerated before or during spraying.
5. Collect the pregnant solution
The gold-bearing liquid, called pregnant leach solution (PLS), drains through the heap onto the liner and runs by pipe or ditch to a lined pond or tank. Irrigation of a lift usually stops once the solution carries less than about 0.005 oz of gold per ton of solution (EPA).
6. Recover the gold
Most heaps pump the PLS through columns of activated carbon (carbon-in-column, CIC). The gold sticks to the carbon, is stripped off in a hot caustic solution, recovered by electrowinning and poured as dorรฉ, an impure gold-silver bar sent to a refiner. Silver-rich ore often uses the Merrill-Crowe process instead, where zinc dust precipitates the gold and silver; DeLamar plans a Merrill-Crowe plant for this reason. The barren solution is topped up with cyanide and sent back to the heap.
7. Rinse, detoxify and close
When leaching ends, the heap is rinsed or treated to break down remaining cyanide, then reshaped, covered and revegetated. Closure is a large cost line: the DeLamar study carries US$65.5 million for site reclamation, including US$26.4 million for long-term water treatment.
โถ How gold goes from rock to refined bar: crushing, dissolving, catching on carbon and refining ยท 5:27
Which gold ores suit heap leaching
The single biggest question is the ore type. Cyanide works best on fine gold that is not locked inside sulfide minerals, in porous, oxidised rock. The EPA describes heap leaching as a method developed for low-grade, oxidised gold ores. Three ore groups behave differently:
Chart
Oxide ore leaches far better than transitional ore
Estimated heap leach gold recovery by pit zone, % (P80 19 mm crush)
- Oxide ore: the sulfide minerals near surface have weathered to iron oxides, opening the rock. This is the classic heap leach feed. Our guide to oxidized gold ore explains how to recognise it.
- Transitional ore: partly oxidised, with some sulfides left. Recovery drops and cyanide use often rises.
- Refractory ore: gold is locked inside sulfides such as pyrite or arsenopyrite, or the rock contains carbon that “robs” dissolved gold back out of solution (preg-robbing). These ores usually need roasting, pressure oxidation or bio-oxidation and a mill.
The DeLamar feasibility study shows how sharp the drop can be. Its column tests at a P80 of 19 mm estimate oxide gold recovery of 68 to 88 percent depending on the pit zone, and only 37 to 71 percent for transitional ore from the same zones. The chart below plots those test-based estimates.
Deposit style matters too. Many Nevada heap-leach mines work Carlin-type and epithermal deposits; our overview of types of ore deposits sets out where each style sits and why some oxidise deeply.
Heap leach gold recovery: what to expect
Recovery depends on gold particle size, rock porosity, crush size, leach time and how evenly the solution reaches every part of the heap. A mill that grinds ore to powder and leaches it in agitated tanks typically recovers more of the gold, but costs far more to build and run.
History gives a useful range. In 1969 US Bureau of Mines metallurgists ran a percolation leach on low-grade strip waste at the Cortez mine in Nevada and recovered 67 to 95 percent of the gold, according to the Mining History Journal (2021). The first commercial gold heap leach pad followed at Cortez around 1971.
Modern designs use the leach time to trade recovery against cash flow. At Round Mountain, Nevada, Kinross stacked higher-grade crushed ore on a reusable pad for 60 days and lower-grade run-of-mine ore on a dedicated pad for about 120 days (Kinross annual information form, 2019). Gold keeps trickling out of a heap long after stacking stops, which is why the DeLamar plan includes five years of residual leaching after ten years of mining.
Because recovery is spread over months, it cannot be measured neatly each quarter. Kinross states that recovery rates at its Bald Mountain heap leach cannot be accurately measured on a quarterly basis (Kinross third-quarter 2026 results).
Before a pad is designed, recovery is predicted from tests:
- Bottle roll tests: finely ground samples rolled with cyanide for a few days. They show the best case.
- Column leach tests: crushed ore in tall columns irrigated like a real heap, often for 60 to 120 days or longer. These are the basis for design recovery.
- Agglomeration and permeability tests: check that the heap will drain under its full height.
Heap leach costs per tonne and capital cost
The appeal of heap leaching is cost. The EPA lists simpler design, lower capital and operating costs and shorter start-up times as its advantages over tank leaching. A current, public example is the DeLamar feasibility study for Integra Resources (effective 8 December 2025), an open-pit oxide heap leach in Owyhee County, Idaho:
Chart
Where a heap leach spends its operating cost
Life-of-mine cost per tonne processed, US$, DeLamar project, Idaho
- Throughput: 35,000 tonnes of ore a day, crushed to P80 19 mm.
- Life-of-mine site operating cost: US$10.52 per tonne processed (mining US$3.95, processing US$5.02, general and administrative US$1.54).
- Initial capital: US$389.1 million, including owner’s costs and the bond collateral; total life-of-mine capital US$747.5 million.
- Output: about 910,000 oz of payable gold and 17.4 million oz of silver over ten years, with 72.3% average heap leach gold recovery.
- All-in sustaining cost (AISC, the cost per ounce including sustaining capital): US$1,480 per gold-equivalent ounce on a co-product basis, at base prices of US$3,000/oz gold and US$35/oz silver.
Use these as one dated reference point, not a rule. Costs scale with strip ratio (waste moved per tonne of ore), haul distance, crush size, reagent use, power and labour rates. Cyanide use alone varied from 0.27 to 0.83 kg of sodium cyanide per tonne across DeLamar’s ore zones. For wider ideas on trimming processing costs, see our notes on cost-effective gold extraction strategies.
A quick screen many owners run: break-even grade equals cost per tonne divided by the value of one gram after recovery. At US$10.52 per tonne, 72% recovery and a gold price of, say, US$100 per gram, the break-even is about 0.15 g/t before royalties, taxes and capital. The calculator below does this with your numbers.
Calculator
How much gold will your heap recover, and does it pay?
Enter your tonnes, grade, expected recovery, cost per tonne and today’s gold price.
- Value of recovered gold (US$): $40,509,910
- Operating cost (US$): $10,520,000
- Margin before capital, royalties and tax (US$): $29,989,910
- Break-even grade (g/t): 0.16
Example values only, not a benchmark. The default cost of US$10.52/t is the DeLamar feasibility study life-of-mine site cost (2025); use your own. Gold price is an input: example, use today’s price. Excludes capital, royalties and taxes. 31.1035 g per troy ounce.
Heap leaching vs milling for gold
| Factor | Heap leach | Mill with tank leach (CIL/CIP) |
|---|---|---|
| Best grade range | Low grade, under about 1.4 g/t (EPA) | Higher grade, above about 1.4 g/t (EPA) |
| Ore preparation | None (ROM) or crushing to roughly 10 to 25 mm | Grinding to fine powder |
| Typical recovery | 60 to 80% (EPA) | Usually higher, because finely ground ore leaches more completely |
| Time to recover gold | Weeks to months, with a long tail | Hours to days |
| Capital cost | Lower | Higher (grinding mills, tanks, tailings dam) |
| Waste | Spent heap stays on the pad and is closed in place | Fine tailings in a tailings storage facility |
| Ore types | Oxide, some transitional | Oxide, transitional and, with pre-treatment, refractory |
Many large mines run both: a mill for the higher-grade or sulfide ore and a heap for the low-grade oxide that would not pay for grinding. Fort Knox in Alaska and Round Mountain in Nevada both ran a mill alongside heap leach pads (Kinross, 2019). For how ore reaches the pad in the first place, our tutorial on surface mining methods for gold covers open-pit benches and stripping. The trade-offs are laid out in more detail in our list of heap leaching pros and cons.
Heap leach gold mines in Nevada and the US
Nevada is where modern gold heap leaching began and where it is most used. The USGS reports that Nevada produced about 64% of US mine gold in 2025, out of an estimated 160 tonnes nationally (USGS Mineral Commodity Summaries, 2026). Our page on gold deposits in Nevada maps the main trends.
Chart
US mine gold production
Tonnes of gold per year; Nevada about 64% in 2025
Three Nevada operations show how heaps are used today:
- Cortez (central Nevada): site of the 1969 Bureau of Mines test and the first commercial gold heap leach pad around 1971 (Mining History Journal, 2021).
- Round Mountain (Nye County, Kinross): open pit with crushed-ore and run-of-mine heaps plus a mill. In January 2026 Kinross announced construction of the Phase X underground, which moves future reserves to higher-grade underground ore (Kinross year-end 2025 release).
- Bald Mountain (White Pine County, Kinross): a heap leach operation. Kinross poured first gold from the Redbird 1 deposit in early October 2026, with leach pad construction for Redbird 2 nearing completion (Kinross Q3 2026 results).
Outside Nevada, the DeLamar project in Idaho is a heap leach development project at the feasibility stage. Heap leaching is also used widely in other gold regions with oxide ore and dry climates, including parts of South America and West Africa.
Cyanide, alternatives and the Cyanide Code
Sodium cyanide is still the standard reagent for gold heaps. It is toxic, so the industry built a voluntary standard, the International Cyanide Management Code. Its website lists over 250 signatory companies, covering gold and silver mines and cyanide producers and transporters (cyanidecode.org, November 2026). Certified mines are audited against detailed questions, including:
- Is weak acid dissociable (WAD) cyanide in open ponds kept at or below 50 mg/l, or are birds and animals kept away from water above that level?
- Is solution applied so as to avoid significant ponding on the heap and overspray beyond the liner?
- Is any direct discharge to surface water no greater than 0.5 mg/l WAD cyanide?
Those questions come from the Cyanide Code mining verification protocol (June 2021).
Alternatives exist but are rare in heaps. Thiosulfate is the best known. At Barrick’s Goldstrike mine in Nevada, a copper-catalysed calcium thiosulfate circuit treated pressure-oxidised, preg-robbing carbonaceous ore in tanks for about four years before the site went back to cyanide, according to engineering firm Ausenco’s input in a 2020 letter filed with Oregon’s DOGAMI for the Grassy Mountain project. The same letter says thiosulfate suits mainly highly preg-robbing ores or places where cyanide is banned. Halide (chlorine or bromine) and biological leaching are used mostly in research or for other metals. Any claim that a gold heap runs without cyanide should be checked against the operator’s own technical report.
Heap leach monitoring and closure
Monitoring on a gold heap leach covers three things: the process, the containment and the surroundings.
- Process: irrigation rate on each cell, solution pH and cyanide strength, and the gold content of pregnant and barren solution. Together these show how fast each lift is leaching.
- Containment: flow in the leak-detection layer between liners, pond freeboard (spare depth before a pond overflows), the site water balance and the stability of heap slopes.
- Surroundings: sampling of groundwater and surface water for WAD cyanide and metals, and checks for wildlife contact with solution.
At closure, heaps are rinsed or chemically treated to destroy residual cyanide before the pad is reshaped and covered, as set out in the EPA’s report on treatment of cyanide heap leaches and tailings. Long-term seepage can need water treatment for years, which is why closure budgets and bonds are large. Our guide to sustainable gold mining practices covers reclamation planning in more depth.
Satellite imagery adds a wide-area view of pad footprint, surface water on the heap, pond levels and revegetation over time, but it does not replace on-site sampling and leak-detection readings. Teams that want those layers in their own systems can use the Farmonaut satellite API.
โถ The seven environmental impacts of mining, explained in plain words ยท 2:31
How to test whether your gold ore can be heap leached
For a licence or claim owner with an oxide gold showing, the path to a heap leach decision usually runs in this order:
- Map the oxide zone. Use surface mapping, trenching and drilling to find how deep oxidation goes. Heap leach ore is usually the near-surface oxide cap.
- Assay and check for refractory signs. High sulfide sulfur, arsenic, carbon or copper warn that cyanide may not work well or will be consumed fast.
- Run bottle roll tests on drill samples from each rock type and oxidation state.
- Run column leach tests at two or three crush sizes, plus agglomeration and permeability tests if the ore is clay-rich.
- Estimate costs per tonne for mining, crushing, stacking, reagents and gold recovery, and check the break-even grade with the calculator above.
- Plan water, permits and closure. A heap needs a lined pad, ponds, a water supply and a closure bond. Permits depend on your country or state.
- Commission a technical study. A preliminary economic assessment or feasibility study by qualified persons ties recovery, cost and reserves together.
Satellite screening can help at step one by showing iron-oxide and clay alteration across a licence before trenching, so field crews start in the right place. It does not measure grade or recovery.
Advantages and limits of heap leaching
Advantages
- Makes low-grade oxide ore pay that would not cover grinding costs.
- Lower capital cost and faster start-up than a mill (EPA).
- No fine tailings dam; spent ore is closed in place.
- Can be expanded in stages by adding pad cells.
Limits
- Lower and slower recovery than milling; gold is tied up in the heap for months.
- Works poorly on refractory, clay-rich or preg-robbing ore without extra treatment.
- Needs a large, flat or gently sloped footprint and careful water management in wet climates.
- Cyanide handling, leak risk and long closure liabilities.
Newer pad, sensor and reagent ideas are reviewed in our piece on heap leaching innovations, and the related in-ground method is covered in in-situ leaching and gold heap leach.
Frequently asked questions
What is heap leaching in mining?
Heap leaching is a process where crushed or run-of-mine ore is piled on a lined pad and irrigated with a chemical solution that dissolves the metal. The metal-bearing solution drains from the base and is processed to recover the metal. It is used for gold, silver, copper and uranium ores.
How does the heap leaching process for gold work?
Ore is stacked in lifts on a lined pad, dilute sodium cyanide solution at a pH near 10.5 is dripped over it, and the pregnant solution is collected and passed through activated carbon or zinc dust to recover the gold, which is then poured as dorรฉ (EPA).
What is the recovery rate of heap leaching for gold?
The EPA gives 60 to 80 percent as a typical range. Recent feasibility work at DeLamar, Idaho, estimates 72.3% average gold recovery over the life of mine, with oxide zones at 68 to 88% and transitional zones at 37 to 71% (2025).
How long does a gold heap leach take?
An average leach cycle is about three months (EPA). Round Mountain leached crushed ore for 60 days and run-of-mine ore for about 120 days (Kinross, 2019). Some gold keeps draining for years after stacking stops.
What grade of gold ore is suitable for heap leaching?
The EPA says heaps are generally used on ore under about 0.04 oz per short ton (about 1.4 g/t). The real cut-off depends on cost per tonne, recovery and the gold price; low-cost heaps can treat ore well under 0.5 g/t.
How much does a heap leach operation cost?
It varies with scale and site. The DeLamar study (2025) estimates US$389.1 million initial capital for a 35,000 tonne-per-day operation and a life-of-mine site operating cost of US$10.52 per tonne processed.
Is cyanide the only chemical used for gold heap leaching?
Cyanide is by far the most common. Thiosulfate has been used commercially for gold, but in tanks rather than heaps: Barrick’s Goldstrike plant ran it for about four years on preg-robbing ore (Ausenco, via Oregon DOGAMI, 2020).
What is the difference between heap leaching and in-situ leaching?
Heap leaching mines the ore and stacks it on a pad. In-situ leaching pumps solution through the ore where it lies underground and pumps it back up, with no excavation. In-situ methods are used mainly for uranium and some copper.
What are the main environmental risks of a heap leach?
Leaks through the liner, pond overflow in storms, wildlife exposure to cyanide solution and long-term seepage after closure. Liners with leak detection, pond freeboard, WAD cyanide limits and closure rinsing address these risks (Cyanide Code; EPA).
Why is heap leaching common in Nevada?
Nevada has large, low-grade oxidised gold deposits, a dry climate that suits water balance on open heaps, and a long history with the method since Cortez in 1969 to 1971. The state produced about 64% of US mine gold in 2025 (USGS, 2026).
More from Farmonaut: carbon footprinting, crop loan and insurance, fleet management, product traceability, manganese supply chain 7 mining impacts on industry, uranium mining on navajo land 7 key health environment effects, best practices for sustainable gold mining 10 steps.
This page is for information only. It is not investment or engineering advice. Process choices need metallurgical testing and a study by qualified persons; companies are named for factual reference only.
Farmonaut mining
Screen your licence for oxide alteration before you drill
Mine owners can send a licence outline as KML/KMZ or a polygon and get a quote for a satellite mineral screen, delivered in 5 to 20 business days.
Mining Pro sample view, synthetic data
Sources
- US EPA, Treatment of Cyanide Heap Leaches and Tailings (technical report): archive.epa.gov
- US EPA, Technical Resource Document: Extraction and Beneficiation of Ores and Minerals, Volume 2: Gold: archive.epa.gov
- Forte Dynamics for Integra Resources, DeLamar Project Feasibility Study and Technical Report (effective 8 Dec 2025): minedocs.com
- Mining History Journal, McQueen, Heap Leaching in Nevada (2021): mininghistoryassociation.org
- Kinross Gold, Annual Information Form 2019 (SEC EDGAR, Form 40-F exhibit): sec.gov
- Kinross Gold, Q4 and year-end 2025 results and exploration release (February 2026): s204.q4cdn.com
- Kinross Gold, Q2 2026 results release: s204.q4cdn.com
- Kinross Gold, third-quarter 2026 results (news release text): finviz.com
- USGS, Mineral Commodity Summaries 2026: Gold: pubs.usgs.gov
- International Cyanide Management Institute, The Cyanide Code: cyanidecode.org
- International Cyanide Management Institute, signatory overview (home page): cyanidecode.org
- International Cyanide Management Institute, Mining Operations Verification Protocol (June 2021): cyanidecode.org
- Calico Resources / Ausenco, Use of Thiosulfate as an Alternative to Cyanidation at Grassy Mountain Mine (filed with Oregon DOGAMI, 2020): oregon.gov
Discussion
Questions, corrections or field experience? Share them below. First-time comments are reviewed before they appear, and your email is never published.
No comments yet. Be the first to add a question or your experience.



Client · Oregon, USA · Gold
Exploration consultancy · South Africa · Gold
Licence holder · Niger · Gold
Licence holder · Nigeria · Gold + lithium
Client · Tanzania · Gold
Client · Somalia · Gold
Client & affiliate partner · Ghana · Gold