Comment

Mining titles ยท Fees and how-to guide

Mining License: Types, Fees and How to Apply

A miner’s licence is usually a cheap personal permit (A$30 in Western Australia); a mining license for production is a long, ground-based title with rent and work rules. Fees, terms and steps by country, with sources.

Authored by Farmonaut Research & Content Team
Reviewed and verified by Farmonaut Mining & Mineral Exploration Team
Updated 5 November 2026 ยท 17 min read
Sentinel-2 Satellite View Of Fimiston Open Pit (Super Pit), Kalgoorlie, Western Australia
Sentinel-2 true-colour composite of Fimiston open pit (Super Pit), Kalgoorlie, Western Australia (30.78ยฐS, 121.50ยฐE). Contains modified Copernicus Sentinel data, 2022 to 2026, processed in Google Earth Engine.

Key takeaways

  • A personal miner’s licence is cheap: a Western Australian Miner’s Right costs A$30 and allows samples of up to 20 kg, but no mining (WA DMPE, 2026โ€“27).
  • A new US lode claim costs $274 in the first year and $200 a year after that; the small-miner waiver applies to 10 or fewer claims (BLM, checked 5 November 2026).
  • Kenya lists KShs 50,000 to apply for a mining licence and a KShs 500,000 minimum annual rent; a mining permit is KShs 1,000 plus KShs 10,000 a year (Ministry of Mining FAQ).
  • Titles run on a ladder. Ghana’s goes from a 12-month reconnaissance licence to a mining lease of up to 30 years (Minerals Commission).
  • Rent is the small cost. In Western Australia the minimum spend per hectare is roughly three to nine times the rent.
In this article
  1. What a license for mining is, and what it is not
  2. Types of license for mining, from reconnaissance to mining lease
  3. How much does a license for mining cost?
  4. Requirements for a license for mining: what regulators ask for
  5. How to apply for a license for mining, step by step
  6. Getting a license for mining in the USA, Canada, Australia and Africa
  7. Gold mining licenses and gold panning permits
  8. Before you apply: make sure the ground is worth licensing
  9. Frequently asked questions
Mining Licensing Guide ยท Permits, Leases & Claims ยท USA, Canada, Australia & Africa

How to get a license for mining: types, requirements, costs and application steps

Panning a creek, testing a greenfield block and building a mine all start with the same thing: the right legal title. Here is how the licence ladder works, what regulators ask for, what holding a title really costs, and how applications run in the USA, Canada, Australia and Africa, with the official source for every figure.

Topic Mining licenses & permits
Jurisdictions 10+ profiled
Audience Prospectors, explorers, investors
Sources Regulators & statutes
$274US lode claim, first yearBLM processing + location + maintenance fees
A$30WA Miner’s Rightprospect on Crown land, keep up to 20 kg
21 yrsWA mining lease termrenewable for further terms
1.5 haSA mining permit capup to 2 years, 3 one-year renewals
30 yrsMax SA mining rightunder the MPRDA

A license for mining is the legal permission a government gives you to search for, or extract, minerals from a defined piece of ground. In most countries the state owns the minerals, not the landowner, so without that title even the owner of the land cannot legally dig, drill or sell ore. The name changes from place to place (licence, permit, lease, concession, right or claim), but the logic behind them is remarkably similar.

Most people who search for a mining license hit a wall of legal jargon. So we have kept it practical: what each type of title allows, what regulators typically ask for, what fees look like in real jurisdictions, and how an application moves from a map selection to a granted title. Every fee and rule below comes from a regulator’s own website or the governing statute. Each one changes over time, so we give the date of the schedule we used and the page where you can check for a newer one.

“In Western Australia, a A$30 Miner’s Right lets you prospect on Crown land and keep samples of up to 20 kg.”

๐Ÿ”‘ The title answers a legal question, not a geological one
A licence tells you whether you may work the ground and on what terms. It says nothing about whether anything worth finding is there; that is the job of the work described in our guide to mineral exploration stages, methods and costs. Applicants who answer both questions before paying fees waste far less money, and we come back to the second one near the end.

What a license for mining is, and what it is not

Think of a mineral title as a bundle of three things: an area (a polygon, a set of grid blocks or a staked claim), a set of rights (to prospect, explore, retain or mine), and a set of obligations (rent, minimum work spend, reporting, environmental care and eventual rehabilitation). Every mining title you will ever hold is some mix of those three, fixed for a term of years.

The words vary, and the differences matter when you read a law or a sale document:

  • Mining license / licence. The general term, and the formal name of the production title in Kenya, Tanzania and Uganda. “License” is the US spelling; “licence” is used in Australia, Canada and most of Africa, so a mineral licence in Perth and a mineral license in Nevada are the same idea spelt two ways.
  • Mining permit. Often a smaller or shorter title. In South Africa a mining permit covers no more than 1.5 hectares; in Kenya it is the small-scale production title. Some codes also use “mineral permits” as a catch-all for every small title they issue.
  • Mining lease. The production title in Western Australia and Ghana. A WA mining lease runs for 21 years and can be renewed.
  • Mining or mineral concession. The term used in Lusophone and several Latin legal systems. Mozambique’s Mining Law 20/2014 grants a Concessรฃo Mineira, and you will see “mineral concession” in many Latin American contracts.
  • Mining right. South Africa’s large-scale production title under the Mineral and Petroleum Resources Development Act (MPRDA), granted for up to 30 years.
  • Mining claim. In the USA and Canada you usually “locate” or “register” a claim over open land rather than apply for a discretionary licence. The claim is still a mineral title, with fees and rules.

What a mining license is not: it is not proof of a deposit, it is not normally a right to the surface of the land, and it rarely excuses you from other approvals. Environmental authorisations, water use, explosives, heritage clearances and landowner consultation usually sit alongside it. South Africa, for example, asks applicants for a prospecting right to apply for environmental authorisation at the same time.

โš  Owning the land rarely means owning the minerals
In most jurisdictions the state holds the mineral rights, and a separate mineral title is needed before any extraction. Even recreational panning usually needs a permit, as the Western Australian and Victorian rules further down show.

Miner’s licence, miner’s right and prospector’s licence

People who search for a miner’s licence usually mean a personal permit, not a production title. These are cheap, they name the person rather than the ground, and they only allow light work. In Western Australia a Miner’s Right costs A$30 on the 2026โ€“27 schedule (DMPE Fees and Charges). It lets the holder pass over Crown land to prospect and keep samples of up to 20 kg, and it does not authorise mining operations (WA Miner’s Rights page, updated 19 June 2026).

Ontario works the same way in spirit. To register a claim in MLAS you must hold a valid prospector’s license, which you can apply for in MLAS once you have a user account (Ontario MLAS page). Kenya adds a trading layer: anyone who buys or sells minerals needs a mineral dealing licence or permit, and a dealing permit does not cover exports (Kenya Ministry of Mining FAQ). In the USA the BLM fee schedule lists fees per claim, not a personal licence (BLM mining claim fees).

Types of license for mining, from reconnaissance to mining lease

Most modern mining laws build a ladder. You start with a broad, short, low-commitment title and climb towards a narrow, long, high-commitment one as your knowledge of the ground improves. Each rung asks more of you and grants more in return. Work out which rung you are on and you have worked out which title you need.

Chart

Ghana’s licence ladder: maximum term

Years per title type, from reconnaissance to mining lease

0 yr8 yr16 yr24 yr32 yrReconnaissance1 yrProspecting3 yrSmall-scale5 yrRestricted lease15 yrMining lease30 yrSource: Minerals Commission of Ghana, mineral rights page (checked 5 November 2026).
0 yr8 yr16 yr24 yr32 yrReconnaissance1 yrProspecting3 yrSmall-scale5 yrRestricted lease15 yrMining lease30 yrSource: Minerals Commission of Ghana, mineral rights page(checked 5 November 2026).
The term grows from one year to 30 as the commitment grows.
The mineral title ladder Five typical stages of mineral title, from reconnaissance through prospecting or exploration, retention, small-scale mining and large-scale mining, with area shrinking and commitment rising. The licence ladder: broad and short to narrow and long Typical sequence in most mining codes; names and limits differ by country 1 ยท Reconnaissance licence / permit Regional look, no drilling. Ghana: up to 5,000 blocks for 12 months 2 ยท Prospecting / exploration licence Sampling and drilling. Nigeria EL: up to 200 kmยฒ for 3 years 3 ยท Retention licence Holds a found deposit that cannot yet be mined 4 ยท Small-scale mining permit Small area, often citizens only 5 ยท Mining lease / licence / right Production. WA: 21 yrs; SA: up to 30 yrs More commitment, longer term, smaller area Less commitment Source: Ghana Minerals Commission, Nigeria Minerals and Mining Act 2007, WA DMPE, gov.za (MPRDA), checked Sep 2026

The ladder simplified. Some countries skip a rung (the USA has no reconnaissance licence), and some add one (Western Australia has a special prospecting licence for gold).

Reconnaissance: looking before you commit

A reconnaissance licence or permit covers a large area for a short time and usually rules out drilling or trenching. Ghana’s Reconnaissance Licence, for instance, can cover up to 5,000 contiguous 21-hectare blocks for 12 months, renewable, according to the Minerals Commission’s mineral rights page. It suits companies scanning a region for targets. Not every country offers one.

Prospecting and exploration: finding and testing a deposit

This is the workhorse mining license for exploration, and the one most juniors hold. It gives an exclusive right to search for specified minerals, including by sampling and drilling. Terms run for years and often come with compulsory area reduction. Ghana’s Prospecting Licence covers up to 750 blocks for three years and is renewable with the area cut to no more than half. Kenya’s prospecting licence can reach 1,500 contiguous blocks for up to three years. In Western Australia a prospecting licence runs four years plus one four-year extension, and an exploration licence applied for after 10 February 2006 runs five years, then one five-year extension, then further two-year periods. Victoria’s prospecting licence is the odd one out: seven years at most, and no renewal. Our prospecting licence comparison across eight jurisdictions sets the rent and minimum spend for each side by side.

Exploration titles: first term versus longest term with extensions Exploration titles: first term vs longest term with extensions Years. Teal dot = first grant; gold dot = maximum with the extensions the law allows 0 4 8 12 years WA prospecting licence 4 โ†’ 8 WA exploration licence 5 โ†’ 12+ Victoria prospecting licence 7, not renewable Kenya prospecting licence up to 3 Source: WA DMPE licence pages and 2026โ€“27 fee schedule, Resources Victoria, Kenya Mining Act 2016, checked Sep 2026

WA exploration licences applied for after 10 February 2006 can keep extending in two-year steps after year ten, so “12+” is a floor, not a cap.

Retention: holding a deposit you cannot mine yet

Suppose you find something that is uneconomic today because of price, infrastructure or technology. A retention licence lets you hold it without the work obligations of an exploration title. Western Australia’s Retention Licence has no maximum area and runs for up to five years, renewable.

Small-scale and artisanal mining titles

Many countries reserve small production titles for their own citizens. Ghana’s Small Scale Mining Licence is for Ghanaians only and runs for five years, renewable. Kenya’s artisanal and small-scale permits require the holder to be a Kenyan citizen or a company at least 60% owned by Kenyan citizens.

Mining lease, licence or right: production

The top rung is the production licence: it authorises extraction and sale. It covers a much smaller area, usually tied to a defined deposit, and demands the most: a mine plan, environmental approvals, rehabilitation security, social commitments and royalties. Kenya’s Mining Licence runs for up to 25 years or the forecast life of the mine, whichever is shorter. A Western Australian mining lease runs 21 years and is renewable.

How much does a license for mining cost?

“Mining permit cost” is one of the most searched questions on this topic, and the application fee is the smallest part of the answer. The real cost of a mining title is the recurring bill: annual rent per hectare or block, minimum work expenditure, security deposits, reporting and, at the production stage, royalties. The table sets out published figures from four regulators so you can see the structure. Each row names the schedule it came from; confirm the amount on that page before paying.

Chart

Kenya: application fee versus yearly cost

KShs; licence rent is KShs 2,000 per hectare with a KShs 500,000 minimum

Application feeAnnual fee or rentKShs 0KShs 125,000KShs 250,000KShs 375,000KShs 500,000Mining permitKShs 1,000KShs 10,000Mining licenceKShs 50,000KShs 500,000Source: Kenya Ministry of Mining, FAQs (checked 5 November 2026).
Application feeAnnual fee or rentKShs 0KShs 125,000KShs 250,000KShs 375,000KShs 500,000Mining permitKShs 1,000KShs 10,000Mining licenceKShs 50,000KShs 500,000Source: Kenya Ministry of Mining, FAQs (checked 5 November2026).
The yearly bill is ten to fifty times the application fee.
Jurisdiction & title Application / filing Recurring cost Other commitments
USA (BLM), lode claim filed on or after 1 Sep 2024 $25 processing + $49 location $200 maintenance per claim, due by 1 September Small-miner waiver if you hold 10 or fewer claims
USA (BLM), placer claim $25 processing + $49 location $200 per 20 acres or part Same waiver rules
Western Australia, prospecting licence A$478 Rent A$4.40/ha (2026โ€“27 schedule) Min. spend A$40/ha (A$2,000 min); A$5,000 security
Western Australia, mining lease A$703 Rent A$30.10/ha (2026โ€“27 schedule) Min. spend A$100/ha (A$10,000 min above 5 ha); A$5,000 security
Kenya, mining licence KShs 50,000 Rent KShs 2,000/ha/yr (min. KShs 500,000) Ministry of Mining FAQ, checked Sep 2026
Kenya, mining permit KShs 1,000 KShs 10,000 per year Citizens / 60% Kenyan-owned firms
Nigeria, exploration licence NGN 500,000 for the first 100 cadastral units Annual service fees via Remita Mining lease: NGN 3,000,000

Western Australia’s Fees and Charges 2026โ€“27 schedule, effective 1 July 2026, shows where the money goes. A prospecting licence costs A$4.40 per hectare in rent but A$40 per hectare in minimum annual expenditure. A mining lease costs A$30.10 in rent and A$100 in expenditure. In both cases the work commitment is roughly three to nine times the rent. WA reissues the schedule each July, so check the DMPE site for the current year’s figures.

Western Australia: annual rent versus minimum expenditure per hectare WA per-hectare charges: rent vs minimum work spend A$ per hectare per year, Fees and Charges 2026โ€“27 (effective 1 July 2026) 0 50 100 4.40 40.00 30.10 100.00 PL rent PL min. spend ML rent ML min. spend Source: WA DMPE, Fees and Charges 2026โ€“27, Mining Act 1978 tenements, checked Sep 2026. PL = prospecting licence, ML = mining lease

Teal bars are rent paid to the state; gold bars are the minimum you must spend on the ground each year.

Two lessons follow. Recurring costs scale with area, so an oversized licence is an expensive one. And minimum expenditure is often the biggest line, so budget for the full term, not the lodgement day. The calculator below puts four very different titles side by side for the same piece of ground.

๐Ÿ“ˆ Ask the vendor for the rent and expenditure history
When you review a project, ask for every rent receipt and expenditure report on the title. A licence with unpaid rent or unmet work commitments may be liable to forfeiture, whatever the vendor’s presentation says. Check it against the public register yourself. This is general information, not investment advice.

One search in this cluster trips people up: “surpac license cost”. That is a software licence for mine-planning tools, priced by the software vendor. It has nothing to do with the right to explore or mine.

Mining permit cost: what a small holder pays

If you are asking how much a mining permit is, the answer depends on the title. A Kenyan mining permit, the small-scale title, has a non-refundable application fee of KShs 1,000 and an annual fee of KShs 10,000. A Kenyan mining licence for large-scale work costs KShs 50,000 to apply and KShs 2,000 per hectare a year, with a minimum of KShs 500,000, so even a 100-hectare licence pays the KShs 500,000 minimum; stamp duty is charged on top at issue (Kenya Ministry of Mining FAQ).

In the USA the BLM lists $274 for a new lode claim filed on or after 1 September 2024 ($25 processing, $49 location and $200 maintenance), then $200 a year per claim (BLM). Holding five lode claims for three years therefore costs $1,370 in the first year and $1,000 in each of the next two, $3,370 in all, before the small-miner waiver (10 or fewer claims). Our own sum from the BLM schedule: if you qualify, the waiver removes the maintenance part. The calculator below does the same sum for a Western Australian prospecting licence.

Calculator

What does a prospecting licence cost over its term?

Enter your area and the rates from the regulator’s schedule. The defaults are the Western Australian prospecting licence rates.

ha

years

A$

A$/ha

A$/ha

A$
$18,238 A$total over the term
  • Rent over the term: $1,760
  • Minimum work spend over the term: $16,000
  • Average cost per hectare per year: $46

Example values only, not a benchmark. Defaults use DMPE Fees and Charges 2026โ€“27: application A$478, rent A$4.40 per hectare, minimum spend A$40 per hectare (A$2,000 minimum). The prospecting licence maximum is 200 ha, and WA charges at least A$40.70 rent for 9 ha or less, which this sum does not apply. Security deposits, royalties and professional fees are excluded. Rates are inputs: use the current schedule.

Requirements for a license for mining: what regulators ask for

Requirements for a mining permit or licence differ in detail, but the checklist regulators work through is much the same everywhere. Expect to prove who you are, where you want to work, what you intend to do, and that you can pay for it and clean up afterwards. The heavier the title, the more evidence you need.

Chart

Ghana: bigger area, shorter term

Reconnaissance, prospecting, restricted lease and mining lease

081522301001,00010,000Maximum term, yearsMaximum area, 21 ha blocksReconnaissanceProspectingRestricted leaseMining leaseSource: Minerals Commission of Ghana, mineral rights page (checked 5 November 2026).
081522301001,00010,000Maximum term, yearsMaximum area, 21 ha blocksReconnaissanceProspectingRestricted leaseMining leaseSource: Minerals Commission of Ghana, mineral rights page(checked 5 November 2026).
Wide, short titles sit left to right at the top; narrow production titles run longest.
  • Identity and eligibility. ID for individuals; incorporation papers, directors and shareholders for companies. Some titles are citizens-only, such as Ghana’s small-scale licence and Tanzania’s Primary Mining Licence.
  • A defined area. Coordinates or grid blocks in the datum the registry uses. The area must be free of existing rights; Tanzania’s Mining Commission states this explicitly.
  • A work programme. What you will do, when, and at what cost. Western Australia sets a minimum annual expenditure for every exploration title.
  • Technical and financial capacity. South Africa grants prospecting rights only where the applicant has access to financial resources and expertise and a compatible financing plan.
  • Environmental approvals. An environmental management plan or authorisation, often lodged in parallel.
  • Consultation. South Africa requires applicants to consult the landowner and lawful occupier and report the outcome within 30 days of acceptance of a prospecting right application.
  • Production-stage proof. For a WA mining lease you must lodge a mining proposal, a mineralisation report by a qualified person, or a JORC-compliant resource report.
๐Ÿ’ก Fix the boundary file before anything else
Almost every registry checks overlaps automatically, and a polygon in the wrong datum can land on someone else’s ground. Build the application around a clean, correctly projected boundary. The same KML or KMZ file will also feed a satellite prospectivity screen of the area.

Mining license requirements by type of title

Requirements grow with the rung of the ladder. A personal permit such as a Miner’s Right or prospector’s license asks for identity and a fee, and in Victoria the holder must carry it while prospecting. An exploration or prospecting title adds a defined area, a work programme and proof that you can fund it. A production title adds a mine plan, environmental approvals and rehabilitation security. If you are comparing mining permit requirements across countries, sort them into those three groups first. The detailed rules then become easier to read.

Gold has no separate rulebook in most places, so a gold mining license or gold mining permit is the same title with gold named as the target mineral. Western Australia is the exception covered below, with its Special Prospecting Licence for gold.

How to apply for a license for mining, step by step

Application processes have converged, largely because so many registries now run on similar online cadastre software. Our mining cadastre portal guide by country lists the official portals for 17 countries. The sequence below is what you will meet in most of them.

  1. Choose the right title. Match the stage of your project to the ladder above, then apply for the title that fits it. Applying for a production title before you have exploration results is a common and costly error.
  2. Register with the registry. Online systems such as Ontario’s MLAS, the BLM’s MLRS and Western Australia’s Mineral Titles Online need an account before you can lodge anything.
  3. Search the register. Confirm the ground is open. Most portals show existing titles and pending applications on a map.
  4. Select or mark out the area. Pick grid blocks, enter coordinates, or physically mark out the ground where the law still requires it (WA prospecting licences and mining leases must be marked out).
  5. Lodge and pay. Application fees are usually non-refundable. Keep every receipt, because lodgement time often decides priority.
  6. Notice, objections and consultation. Many systems publish applications and allow objections. In WA, native title parties have four months to object where the expedited procedure applies.
  7. Grant and ongoing compliance. Rent, minimum spend, annual reports and renewals keep the title alive. Miss a payment date and you can lose the licence.

Finding the mining licence application form

Few regulators still publish a single paper application form for a mining licence. In most of the places covered here the form is the portal itself: you fill in the mining licence application online, attach documents and pay there. Ghana moved every application online in November 2021. Kenya’s cadastre portal takes new applications once you have registered and been verified. Where a paper form still exists, the regulator’s own site is the only safe place to download it. Copies passed around online are often out of date.

โš  A public map is not a register search
Maps can lag the register, and pending applications are not always drawn. Run the registry’s formal search, save a dated copy, and only then pay the fee.

If you already have a boundary in mind, you can get a satellite read on it while the paperwork moves. Draw it on mining.farmonaut.com (Map Your Mining Site), or send the coordinates through our mining query form for a quote.

Mining licences near me: finding open ground and nearby titles

Before you lodge anything, look at who already holds the ground around you. Victoria’s regulator runs a Licences near me tool that shows resource licences across the state (Resources Victoria). Ontario’s MLAS Map Viewer shows active unpatented claims to anyone, with no account (Ontario MLAS). In the USA, MLRS holds the federal claim records and its built-in mapping replaces the old LR2000 system (BLM MLRS). Save a dated copy of what you see, because the register changes daily.

Applying in Australia: each state and territory has its own act and register, so a mining license in Australia for Western Australia is a different application from one in Victoria or the Northern Territory. Start with the department that runs the register for your state.

Getting a license for mining in the USA, Canada, Australia and Africa

United States: claiming mineral rights on federal land

On open federal public land there is no discretionary mining license at the exploration stage. The US system is claim-based under the General Mining Law: you locate a lode or placer claim, then record it with the Bureau of Land Management within 90 days. For a lode claim filed on or after 1 September 2024, the BLM’s mining claim fee page lists a $25 processing fee, a $49 location fee and a $200 maintenance fee: $274 in total. Placer claims pay the same $74 at filing plus $200 maintenance for each 20 acres or part of it. Existing claims pay the maintenance fee on or before 1 September each year, and the BLM adjusts these fees from time to time, so check that page before you file.

Cumulative BLM fees for one lode claim held for five years One US lode claim: what the fees add up to Cumulative US$ paid to the BLM, no small-miner waiver $274 $474 $674 $874 $1,074 Year 1 Year 2 Year 3 Year 4 Year 5 Source: BLM Mining Claim Fees, claims filed on or after 1 Sep 2024 ($274 at filing, $200/yr after), checked Sep 2026

The gold point is the filing year. After that the only BLM charge is the $200 annual maintenance fee, unless you qualify for the waiver.
  • Online filing: the BLM’s Mineral & Land Records System (MLRS) at mlrs.blm.gov lets you file claims and sites online. It replaced LR2000, and the BLM says every LR2000 serial number was carried into MLRS, so old LR2000 BLM mining claims records can still be traced by their case number.
  • The BLM mineral rights map: there is no separate paper map any more. MLRS has built-in geospatial mapping, and the BLM also publishes its open and closed mining claim cases as public GIS map layers you can load in ArcGIS or Google Earth.
  • Small-miner waiver: if you and all related parties hold 10 or fewer claims nationwide, you can file Form 3830-2 instead of paying maintenance fees.
  • โš  Other permits: a claim is not an operating permit. Surface disturbance needs separate federal and state approvals.

Canada: provincial online staking

Canada leaves minerals mostly to the provinces, so the title you need depends on where the ground is, and most provinces have replaced physical staking with online map selection. In Ontario, MLAS lets you register claims online, 24 hours a day, from anywhere. To register a claim you need an MLAS account and a valid prospector’s licence, which you buy through MLAS. Once you hold claims, early exploration needs an exploration plan or permit, and the usual time from circulation of an exploration plan to effect is 30 days.

  • Newfoundland and Labrador: mineral claims in Newfoundland are staked online through the Mineral Rights Administration System (MIRIAD), and the province’s mines FAQ confirms registration is free.
  • Ontario claim maps: people still search for “MNDM claim maps”, after the old Ministry of Northern Development and Mines. The current equivalent is the MLAS Map Viewer, which non-registered users can open to see active unpatented claims; paper claim maps are still sold by the ministry.
  • Saskatchewan: the Mineral Administration Registry Saskatchewan (MARS) handles tenure online, and a Free Miner’s Certificate is needed before staking. Potash mineral rights in Saskatchewan are handled differently: they are subsurface mineral dispositions covering mineral salts more than 60 metres below surface, and the province sells them through competitive public offerings under The Subsurface Mineral Tenure Regulations.
  • British Columbia: Mineral Titles Online handles claim registration.
  • Manitoba: Manitoba mining claims run from 16 to 256 hectares. You need a prospecting licence (anyone 18 or older; C$15 for life), and you check open ground on the iMaQs Mining Map before staking. The province’s staking page listed recording fees of C$16 per claim in unsurveyed territory and C$67 in surveyed territory when we checked in September 2026.
  • โš  Other provinces: check the provincial mines branch directly for the staking method and claim maps in force when you apply.

“Ontario’s online system lets prospectors register a mining claim 24 hours a day, from anywhere in the world.”

Australia: state-based tenements

Each Australian state runs its own mining act, so a licence in Perth is not the same as one in Melbourne. Western Australia, the largest mining state, administers tenure through the Department of Mines, Petroleum and Exploration (DMPE), which replaced DEMIRS on 1 July 2025. WA’s Mining Act 1978 offers prospecting licences (under 200 ha, four years plus one four-year extension), exploration licences (1 to 70 graticular blocks, or 200 outside mineralised areas), retention licences, mining leases (21 years, renewable), general purpose leases and miscellaneous licences. Applications and searches run through Mineral Titles Online. For fees, office addresses and each tenement type in detail, see our guide to WA mining tenements and the Dept of Mines.

Victoria regulates under the Mineral Resources (Sustainable Development) Act 1990. Its prospecting licence is capped at 5 hectares, runs for a maximum of seven years and cannot be renewed.

Africa: online cadastres and citizen-reserved titles

Much of Africa runs licensing through online cadastre portals, with small-scale titles often reserved for citizens. A few examples, each checked in September 2026:

  • Kenya (Mining Act, 2016): a mining license in Kenya can be one of several titles: reconnaissance, prospecting and retention licences and a mining licence for large-scale work, plus reconnaissance, prospecting and mining permits for small-scale operators. Applications go through portal.miningcadastre.go.ke, and the Ministry of Mining FAQ lists the fees.
  • Tanzania (Mining Act, Cap. 123): the mining license in Tanzania comes as a Prospecting Licence, Primary Mining Licence, Mining Licence and Special Mining Licence, handled by the Mining Commission. The PML is for Tanzanian citizens.
  • Sierra Leone (Mines and Minerals Development Act, 2022): a mining license in Sierra Leone can be a reconnaissance, exploration, small-scale, large-scale and artisanal licences, filed with the National Minerals Agency’s Mining Cadastre Office.
  • Ghana (Act 703): reconnaissance and prospecting licences, mining leases and small-scale licences. Every application has been online since November 2021.
  • South Africa (MPRDA): prospecting right, mining right and mining permit. Applications go through SAMRAD while the Indwe Mining Licensing System is piloted in the Western Cape, where the first rightholders were registered in October 2025. Our South African mining rights and permits guide covers each one step by step.
Explains whether a foreigner can get a small scale mining license in Africa: mostly no, but three doors are open.

โ–ถ Explains whether a foreigner can get a small scale mining license in Africa: mostly no, but three doors are open. ยท 5:16

Gold mining licenses and gold panning permits

Why does gold get its own rules? Because it draws hobbyists and serious operators to the same creeks. The line that matters runs between recreational prospecting, which usually needs a cheap personal permit, and commercial gold mining, which needs a full mineral title. Legally, a gold mining license is simply a licence to mine gold, but some jurisdictions offer gold-specific shortcuts.

  • Western Australia, Miner’s Right: every person who prospects or fossicks on Crown land needs one. It costs A$30 on the 2026โ€“27 schedule and allows samples of up to 20 kg, but no mining operations. Metal detecting counts as prospecting.
  • Western Australia, Special Prospecting Licence for gold: up to 10 hectares, marked out inside an existing prospecting or exploration licence that has been in force for more than 12 months. You may hold an interest in no more than 10 at once.
  • Victoria, Miner’s Right: required to search for gold, gems or minerals, and must be carried while prospecting. Check the fee with Resources Victoria when you buy it.
  • USA, placer claims: gold in stream gravels is usually claimed as a placer claim, with maintenance fees per 20 acres. Many popular panning streams are already claimed, so check MLRS before you dig.
  • โš  Artisanal gold in Africa: a small-scale gold mining licence is often citizens-only and tied to designated areas. Mercury use and river-bed disturbance are closely regulated.
๐ŸŒฑ Hobby permits come with obligations too
Fill your holes, stay off reserved land, and get the tenement holder’s consent before prospecting on someone else’s title. Regulators treat unauthorised digging on a live tenement as a serious offence, whatever the scale.

Buying a mining permit instead of applying

Searches for “mining permit for sale” are common. Some titles can be transferred with regulator approval; others cannot. South African mining permits, for example, are not transferable. Where a transfer is possible, the buyer of a title inherits every unpaid obligation. Treat any purchase as due diligence: check the register, the rent history, the boundary and the geology. Our list of checks to run before buying a gold claim works for most transferable titles. We are not a broker and do not buy or sell titles, but a satellite read of the boundary is a quick independent check on what you would be buying.

Before you apply: make sure the ground is worth licensing

A mining licence costs money every year you hold it. In first-come, first-served registries applicants often rush to file on ground they know little about, then carry rent and work commitments on an area that never justifies a drill rig. The cheapest time to improve the odds is before the application goes in. A day spent on reading the published geological maps for the area, or an hour with a mining consultant who knows the local code, costs far less than a year of rent on the wrong ground.

This is where satellite analysis fits. Once you have an open area and a draft licence application, you already have what we need: a boundary. Our satellite-based mineral detection analyses multispectral and hyperspectral imagery of that polygon. Each mineral and alteration zone reflects energy in its own spectral signature, which lets us flag likely mineralised target zones, alteration halos and structures such as faults and fractures, without anyone setting foot on the ground.

  • โœ” Input you already have: the coordinates, KML/KMZ or polygon from your licence application, plus the country and target mineral.
  • โœ” Speed: reports arrive in 5โ€“20 business days, depending on area size and mineral complexity.
  • ๐Ÿ“Š Deliverables: prospectivity heatmaps, high-potential zones with estimated location and depth ranges, geological interpretation, and PDF plus georeferenced GIS files. Premium+ adds TargetMaxโ„ข drilling intelligence and 3D subsurface models.
  • ๐Ÿ“Š Cost and time: satellite screening can cut early-exploration costs by up to 80โ€“85% and shorten timelines from months to days, compared with starting on the ground.
  • โš  Limitation: satellite targets are exploration targets, not a resource estimate. They tell you where to sample and drill first; fieldwork confirms them.

The satellite-driven 3D mineral prospectivity mapping overview shows what a typical deliverable looks like. We have scanned 100,000+ hectares for 20+ mineral types across 25+ countries.

Choosing ground for a licence? Check what’s under it first.

Send us the boundary you plan to apply for. We’ll return a satellite prospectivity read, with ranked target zones, geology and next steps, before you commit to rent and work programmes.

A pre-application checklist

  1. Pick the right rung of the licence ladder for your stage of work.
  2. Register on the official portal early, because account verification can take days.
  3. Search the register and save a dated copy of the result.
  4. Prepare the boundary in the registry’s grid or datum.
  5. Screen prospectivity on that boundary so you apply for the best ground, not just open ground.
  6. Budget the full term: rent, minimum expenditure, security, reporting and renewal.
  7. Lodge a complete application, because incomplete ones can lose their place in the queue.
๐Ÿ”‘ Plan the year-six surrender from day one
Many laws force you to give up part of an exploration licence at renewal. Western Australian exploration licences applied for after 10 February 2006 must surrender 40% of the ground at the end of year six. Knowing which blocks carry the strongest signal tells you what to keep.

Country and licence guides in this series

Each of these goes deeper on one registry or one rung of the ladder:

Shows how Farmonaut Mining Pro answers where to drill first on a mining license, from orbit.

โ–ถ Shows how Farmonaut Mining Pro answers where to drill first on a mining license, from orbit. ยท 1:46

Frequently asked questions

What is a license for mining?

It is a government-issued title that gives you the legal right to explore for or extract minerals from a defined area, for a set term and on set conditions. Depending on the country it may be called a licence, permit, lease, concession, right or claim.

What is the difference between a mining permit and a mining lease?

The words mean different things in different laws. Often a permit is a smaller or shorter title, such as South Africa’s 1.5-hectare mining permit, while a lease is a long production title, such as Western Australia’s 21-year mining lease. Always read the definition in the relevant act.

How much does a mining permit cost?

Application fees range from a few hundred dollars to a few thousand. A BLM lode claim filed on or after 1 September 2024 costs $274 in first-year fees, and a Western Australian mining lease application is A$703 on the 2026โ€“27 schedule. Recurring rent and minimum work spend usually cost far more over the life of the title. Confirm the fee on the regulator’s schedule before you pay.

What are the requirements for a mining permit?

A typical application needs proof of identity or incorporation, eligibility (some titles are citizens-only), a defined and available area, a work programme, evidence of technical and financial capacity, environmental approvals and, in many countries, consultation with landowners and communities.

What does a mining license actually give me?

An exclusive right to explore for or extract named minerals inside a defined area, for a fixed term, as long as you keep paying rent and meeting the work and reporting conditions. It does not normally give you the surface of the land, and other approvals (environment, water, explosives) still apply.

What is a mining concession?

It is the name many civil-law countries give to a production title. Mozambique’s Mining Law 20/2014, for example, grants a Concessรฃo Mineira. Legally it plays the same role as a mining lease in Western Australia or a mining right in South Africa.

Is a mineral license in the USA the same as a mineral licence in Australia?

The spelling differs and so does the system. The USA mostly uses located claims on federal land rather than discretionary licences, while Western Australia grants licences and leases under its Mining Act 1978. The idea, a state-granted right to minerals in a defined area, is the same.

What happens after I lodge an application for a mining permit?

Most regulators check the area for overlaps, publish the application and allow objections. In Western Australia, native title parties have four months to object where the expedited procedure applies. In South Africa, applicants for a prospecting right must consult the landowner and report the outcome within 30 days of acceptance. Grant follows once those steps are cleared.

Where do I get an application form for a mining licence?

From the regulator’s own online cadastre in most countries: Kenya, Ghana, Western Australia, Ontario and the BLM all take applications through their portals. Download any paper form only from the regulator’s website, because copies shared elsewhere are often outdated.

Do I need a license to pan for gold?

Usually yes. In Western Australia and Victoria you need a Miner’s Right to prospect, including with a metal detector. In the USA, many streams are covered by existing placer claims, so check the BLM’s MLRS records and local rules before panning.

Can Farmonaut apply for a license for mining on my behalf?

No. We are not a licensing agent, lawyer or broker. We provide the geological side: a satellite prospectivity analysis of the area you plan to apply for or already hold, so you can decide where to apply and where to explore first.

Licence types, terms and fees in this guide come from those regulators’ own websites and published schedules, and from our verified cadastre research. Fees are revised on each regulator’s own cycle (WA every July, the BLM by periodic adjustment), so always confirm with the licensing authority before you file or pay. Nothing here is legal or investment advice.

What is a miner’s licence?

It is usually a personal permit that lets one person prospect on public land and take small samples, without a right to mine. Western Australia’s Miner’s Right costs A$30 on the 2026โ€“27 schedule and allows samples of up to 20 kg; Ontario requires a prospector’s license before you can register a claim.

How much is a mining permit?

It depends on the country and the size of the title. A Kenyan small-scale mining permit costs KShs 1,000 to apply and KShs 10,000 a year. A new US lode claim costs $274 in the first year and $200 a year after that. Check the regulator’s schedule before you pay.

Do I need a gold mining license to pan for gold?

Usually you need a personal permit and permission to be on the land, not a full mining title. Western Australia and Victoria require a Miner’s Right to prospect, including with a metal detector. A mining license is for commercial extraction.

Is there one mining licence application form?

Mostly no. Ghana, Kenya, Western Australia, Ontario and the BLM take applications through their online systems, so the form is the portal. Use the regulator’s own site and be careful with copies of forms from other websites, because they may be out of date.







This page is for information only. It is not legal advice. Confirm the rules with the regulator.

Prospecting safety: get permission from the landowner or holder, hold the right permit, and never use mercury.

Authored by: Farmonaut Research & Content Team

Reviewed and verified by: Farmonaut Mining & Mineral Exploration Team

Reviewed November 2026 against the BLM mining claim fee page, WA DMPE Fees and Charges 2026โ€“27 and Miner’s Rights page, Ontario MLAS, Kenya Ministry of Mining FAQ, Ghana Minerals Commission and Resources Victoria.

Farmonaut mining

Check the ground before you apply

Send the boundary you plan to license and request a quote for a satellite prospectivity read ahead of rent and work commitments.

Farmonaut Mining Pro 3D Target View (Sample, Synthetic Data)

Mining Pro sample view, synthetic data

Sources

  1. WA DMPE, Fees and Charges 2026โ€“27: wa.gov.au
  2. WA, Miner’s Rights (updated 19 June 2026): wa.gov.au
  3. WA, How to obtain a Miner’s Right: wa.gov.au
  4. Ontario, MLAS: Mining Lands Administration System: ontario.ca
  5. Kenya Ministry of Mining, FAQs: mining.go.ke
  6. US BLM, Mining Claim Fees: blm.gov
  7. US BLM, Mineral and Land Records System (MLRS): blm.gov
  8. Minerals Commission of Ghana, Mineral rights: mincom.gov.gh
  9. Resources Victoria, Mineral licences: earthresources.vic.gov.au
  10. WA, Mining leases: wa.gov.au
  11. Manitoba, Mineral staking: manitoba.ca
  12. Tanzania Mining Commission, application procedure: tumemadini.go.tz


Discussion

Questions, corrections or field experience? Share them below. First-time comments are reviewed before they appear, and your email is never published.

No comments yet. Be the first to add a question or your experience.

Leave a comment

Farmonaut Farmonaut Trusted by 200,000+ users and 100+ businesses 200,000+ users trust us Get started