Iron ore ยท Project profile
Simandou Mine: Owners, Output and Ramp-Up Timeline
The Simandou mine in south-east Guinea shipped first ore in December 2025 and ran at about 10 Mtpa in Q3 2026. Two mines share one railway and port built to export up to 120 Mt a year, with full rate targeted for H2 2028.

Key takeaways
- Simandou is two mines: SimFer (Blocks 3 and 4, Rio Tinto 53% / Chinalco-led CIOH 47%) and WCS (Blocks 1 and 2, with Baowu at 49%); Guinea holds 15% of each (Rio Tinto, 2026).
- First shipment left in December 2025; first sales came in April 2026, and H1 2026 sales of 0.4 Mt averaged 65.8% Fe (Rio Tinto half-year results, July 2026).
- The run-rate reached about 10 Mtpa in Q3 2026; SimFer targets 60 Mtpa in H2 2028 and the shared system up to 120 Mtpa (Rio Tinto, 2026).
- At 120 Mtpa Simandou would ship more iron ore than all but four producing countries, close to 5% of world output of about 2.6 billion tonnes (USGS, 2026).
- An EITI study (June 2025) puts Guinea’s annual revenue from Simandou at US$0.7-1.7 billion before 2035.
In this article
- Simandou mine at a glance
- Where is the Simandou mine?
- Who owns the Simandou mine?
- How big is the Simandou mine? Reserves and grade
- Simandou ramp-up: where construction stands
- Why the Simandou mine matters for the iron ore market
- What Simandou means for Guinea
- Environmental and social issues at Simandou
- Satellite monitoring of a project like Simandou
- What to watch at the Simandou mine next
- Frequently asked questions
The Simandou mine is a high-grade iron ore operation in the Simandou range of south-east Guinea. It shipped its first ore in December 2025 and was running at about 10 million tonnes a year (100% basis) in the third quarter of 2026, according to Rio Tinto’s third-quarter 2026 production results. Two separate mines share one new railway and port, and together they are designed to export up to 120 million tonnes a year once ramp-up ends, which Rio Tinto targets for the second half of 2028.
This guide is written for consultants, investors and mining professionals who need the facts in one place: who owns which block, how big the reserves are, what the ore grade means, where construction stands, what the project is worth to Guinea and what to watch next. Every changeable figure carries its date and source.
Simandou mine at a glance
| Item | Fact | Source and date |
|---|---|---|
| Location | Simandou range, Nzรฉrรฉkorรฉ region, south-east Guinea | Rio Tinto project page (2026) |
| Commodity | High-grade iron ore (hematite), used to make steel | Rio Tinto (2026) |
| Structure | Four blocks: Blocks 1 and 2 (Simandou North, WCS) and Blocks 3 and 4 (Simandou South, SimFer) | Rio Tinto Q4 2025 operations review |
| Planned exports | Up to 120 Mt a year combined; SimFer mine 60 Mtpa | Rio Tinto, November 2025 and July 2026 |
| First shipment | December 2025 | Rio Tinto Q4 2025 operations review |
| First sales | April 2026; 0.4 Mt sold at an average 65.8% Fe in the first half of 2026 | Rio Tinto half-year results, July 2026 |
| Run-rate | About 10 Mtpa (100% basis) in Q3 2026 | Rio Tinto Q3 2026 production results |
| Full rate target | 60 Mtpa at SimFer during H2 2028 | Rio Tinto Q3 2026 production results |
| Infrastructure | More than 600 km of new rail, plus barge and transhipment-vessel ports in Forรฉcariah prefecture | Rio Tinto, November 2025 |
A quick word on units. “Mt” means million tonnes and “Mtpa” means million tonnes per annum. “Fe” is the chemical symbol for iron, so “65% Fe” means the ore is 65% iron by weight. Most traded iron ore is priced against a 62% Fe benchmark, which is why a few points of extra iron matter so much for Simandou.
Where is the Simandou mine?
The Simandou range is a long, narrow ridge in the far south-east of Guinea, close to the borders with Liberia and Cรดte d’Ivoire. The SimFer mine (Blocks 3 and 4) lies in the Nzรฉrรฉkorรฉ region, and Rio Tinto’s Simandou project page describes the area as hosting a world-class reserve of high-grade ore. The WCS mine (Blocks 1 and 2) sits at the northern end of the same range.
The location explains most of the project’s history. The ore is roughly 600 km from the coast, across forest, rivers and hills. A U.S. Commerce Department country guide on Guinea notes that large amounts of high-quality iron ore stayed unmined because moving it to a port was so difficult. Without a railway, the deposit had no route to market, which is why it took about three decades to get from discovery to first shipment.
For readers who want to compare it with the other great high-grade iron district, our guide to Carajรกs iron ore in Brazil covers a mine that solved the same problem with its own long railway.
Who owns the Simandou mine?
Simandou is not one company’s mine. It is two mines, owned by two groups, that share common rail and port assets. The ownership chain is set out in the notes to Rio Tinto’s fourth-quarter 2025 operations review filed on the ASX.
Blocks 3 and 4: SimFer (Simandou South)
- SimFer S.A. holds the mining concession. It is owned 85% by SimFer Jersey and 15% by the Government of Guinea.
- SimFer Jersey is a joint venture of Rio Tinto (53%) and Chalco Iron Ore Holdings, or CIOH (47%).
- CIOH is a Chinalco-led group: Chinalco 75%, Baowu 20%, China Rail Construction Corporation 2.5% and China Harbour Engineering Company 2.5%.
- Rio Tinto manages the mine. Its share of the 60 Mtpa capacity is about 27 Mtpa.
Blocks 1 and 2: WCS (Simandou North)
- Winning Consortium Simandou (WCS) holds the concession, with the Government of Guinea holding 15% of the mining company and WCS 85%.
- WCS was formed by Winning International Group of Singapore and Weiqiao Aluminium, part of China Hongqiao Group.
- Baowu Resources bought 49% of the WCS mine and infrastructure projects on 19 June 2024, with an option to rise to 51% of the mine during operations (Rio Tinto, Q4 2025 review).
Rail and port: La Compagnie du TransGuinรฉen
Once built, the shared rail and port assets pass to La Compagnie du TransGuinรฉen (CTG). Rio Tinto’s project page gives the split as 42.5% SimFer, 42.5% WCS and 15% Government of Guinea. WCS builds the roughly 536 km shared dual-track main line, its own 16 km spur and its barge port. SimFer builds a roughly 70 km spur to its mine and the transhipment-vessel port.
For anyone doing due diligence, the practical point is this: “Simandou” headlines can refer to either mine, to the shared railway or to the whole system. Always check which entity and which basis (100% or attributable share) a number uses. Our separate profile of the Simandou iron ore project led by Rio Tinto looks at the SimFer side in more detail.
How big is the Simandou mine? Reserves and grade
An ore reserve is the part of a mineral deposit that has been shown, with studies, to be mineable at a profit. It is smaller and more certain than a resource. Rio Tinto’s project page puts the ore reserves of Blocks 3 and 4 at around 1.5 billion tonnes. Across all four blocks, trade press reporting on the November 2025 launch, such as Mysteel’s report on the start of operations, gives reserves of more than 3 billion tonnes at an average of over 65% iron.
Chart
Simandou at full rate vs national iron ore output
Million tonnes of usable ore a year; selected countries, 2025 estimates, Simandou planned capacity
The EITI country page for Guinea calls Simandou the world’s largest undeveloped high-grade iron ore reserve, citing about 4 billion tons of recoverable ore (Rio Tinto, 2023). Figures differ because they cover different blocks, dates and reporting categories; treat the company’s own reserve statements as the reference.
Grade is where Simandou stands out. In the first half of 2026 SimFer sold 0.4 Mt at an average of 65.8% Fe (Rio Tinto half-year results, July 2026). Most Pilbara fines in Australia are sold nearer the 62% benchmark. Higher-grade ore carries less waste rock and fewer impurities, so a steel mill uses less coke and energy per tonne of iron. That is the reason for the quality premium and for the interest from steelmakers trying to cut emissions. Our guide to the main types of iron ore explains hematite, magnetite and the other ore minerals.
How Simandou compares with national output
At 120 Mt a year, the combined Simandou system would ship more iron ore than most producing countries mine. The USGS Mineral Commodity Summaries 2026 estimates world usable iron ore output at about 2.6 billion tonnes in 2025. Australia led with about 980 Mt and Brazil followed with about 420 Mt. Canada mined about 69 Mt and South Africa about 66 Mt. Simandou at full rate would therefore be close to 5% of world supply, from a single mountain range.
Simandou ramp-up: where construction stands
Here is the timeline from Rio Tinto’s own filings. Each date is a reported milestone, not a forecast.
Chart
SimFer construction progress
Percent complete, end of 2025 vs mid-2026
- July 2024: Rio Tinto approves its share of investment in SimFer. Its share of total capital cost is US$6.2 billion.
- November 2025: The President of Guinea and the partners mark the start of operations at the port in Forรฉcariah prefecture. Rio Tinto described it in its start-of-operations release as Africa’s largest greenfield integrated mine and infrastructure project.
- December 2025: First ore shipment. Ore is railed from the SimFer mine via its spur and shipped through the WCS port while the SimFer port is finished. The SimFer mine was 62% complete and its port 66% complete.
- Q1 2026: Commissioning of the common rail infrastructure is completed.
- April 2026: First sales of Simandou ore in China. Final (tertiary) crushing is done in China at first.
- June 2026: SimFer mine about 77% complete and port about 85% complete. 2.2 Mt had been shipped to China in the half. The SimFer workforce stood at 19,460, with 76% Guinean participation.
- Q3 2026: Annualised run-rate of about 10 Mtpa (100% basis).
- Q4 2026 (planned): First ore through the permanent primary crusher at the SimFer mine.
- Q1 2027 (planned): SimFer port commissioning.
- H2 2028 (target): 60 Mtpa run-rate at SimFer.
Rio Tinto’s 2026 sales guidance for Simandou is 5 to 10 Mt on a 100% basis. It also notes a two-to-three-month lag between ore leaving the mine gate and a recognised sale, because the trip to China takes weeks. If you want context on why big projects take this long, see our explainer on how long it takes to build a mine.
Why the Simandou mine matters for the iron ore market
Iron ore is the main raw material for steel; our page on the main uses of iron shows where that steel goes. Seaborne supply has long been dominated by Australia and Brazil. Simandou adds a third large source of high-grade ore, mostly aimed at Chinese mills, with Chinese partners in both mines and in the rail and port.
Three effects are worth tracking:
- Supply growth. Up to 120 Mtpa of new supply is large against a market where seaborne prices react to changes of a few tens of millions of tonnes.
- Price pressure. Benchmark prices were already soft in October 2026. Kallanish put the KORE 62% Fe Qingdao price at US$90.3 per tonne CFR on 27 October 2026, down 6.1% from 25 August, as reported by GMK Center. Analysts cited weak Chinese demand and expected new supply. CFR means cost and freight: the price delivered to a Chinese port.
- Grade premium. As the world moves toward lower-emission steel routes such as direct-reduced iron, demand for ore above about 65% Fe is expected to grow. Simandou is one of very few large new sources of it.
For context, the USGS reports that U.S. mines received an average unit value of about US$89 per tonne in 2025, down from US$100 in 2024. That is a different measure from the Chinese port price, but it points the same way.
Estimate the value of Simandou shipments
The calculator below lets you adjust tonnes, grade, price and a royalty rate to see the rough gross value of a year of shipments. It scales the 62% benchmark price by iron content, which is a simple first-pass method. Real contracts add or subtract for silica, alumina, phosphorus and moisture, and deduct freight.
Calculator
What is a year of Simandou-grade shipments worth?
Enter tonnes, iron grade, today’s 62% Fe price and a royalty rate to see a rough gross value.
- Grade-adjusted price (US$ per tonne): $96
- Royalty at your rate (US$ million): 201
Example values only, not a benchmark or forecast. The price is scaled by iron content (grade / 62), a simple first-pass method; real contracts adjust for impurities and moisture and deduct freight. Default tonnage is SimFer’s 60 Mtpa design capacity and grade is the 65.8% Fe H1 2026 average (Rio Tinto, 2026). Price and royalty are examples: use today’s price and the royalty in the applicable agreement.
What Simandou means for Guinea
Guinea is already the world’s largest holder of bauxite reserves and a major bauxite exporter. The EITI notes that extractive industries supplied over 17% of government revenue, 92% of exports and 20% of GDP in 2022. Simandou adds iron ore to that base.
Chart
Guinea’s estimated yearly revenue from Simandou
US$ billion a year, by price scenario
An EITI fiscal modelling study published in June 2025 estimated Guinea’s annual government revenue from Simandou at US$700 million to US$1.7 billion before 2035, rising to as much as US$2.7 billion after that, depending on the iron ore price. The state also holds 15% of each mining company and 15% of CTG.
The infrastructure has wider uses. The rail line is described as multi-use, which means it could, in principle, carry other freight and passengers along the corridor. The project also built new port capacity at Morebaya in Forรฉcariah prefecture. Jobs are large in number during construction: about 26,700 people worked on SimFer’s scope at the end of 2025, with 82% Guinean participation, before the total eased to 19,460 by mid-2026 as construction moved toward completion.
Guinea’s Mining Code also matters for logistics. In March 2022 the government told mining companies it intends to use its right, under the code, to carry 50% of mining output by sea transport (U.S. Commerce Department, Guinea country guide). Investors should follow how rules like this apply to iron ore cargoes.
โถ How mining feeds a national economy: taxes, royalties, jobs and infrastructure. ยท 5:03
Environmental and social issues at Simandou
The Simandou range carries forest, water sources and sacred sites, and it is home to western chimpanzees, a critically endangered species. Rio Tinto says it is developing the project to international environmental, social and governance standards and reports work on community consultation, sacred forests and chimpanzee protection on its project page.
Safety has been a serious issue during construction. Rio Tinto has reported fatal incidents at the SimFer port site in October 2024, at the SimFer mine site in August 2025 and one more at Simandou in the first half of 2026. In 2026 it set up a Simandou Safety Advisory Panel of six external advisers to help strengthen fatality risk management across the mine and port.
A 600 km rail corridor also crosses farmland, rivers and villages. Resettlement, land compensation, dust, water quality and forest loss along the line and around the pits are the main issues that lenders, NGOs and the EITI process follow. For companies that need to report emissions along their supply chains, tools for carbon footprinting and product traceability are becoming part of how raw materials are sold.
โถ The seven main environmental impacts of mining, explained in claymation. ยท 2:31
Satellite monitoring of a project like Simandou
A project this large and remote is hard to follow from the ground. Sentinel-2 satellite images, taken every few days, show pit expansion, waste dumps, new roads, rail progress and forest change across the whole corridor. Consultants use this kind of imagery to check reported progress, to map vegetation change around mine leases and to plan site visits.
The same approach supports logistics: rainfall and weather data, for example through a satellite weather API, help plan haulage in Guinea’s long wet season, and fleet management software tracks trucks and equipment on large sites. Farmonaut’s mining platform screens exploration ground from satellite data for clients who want to map their own licence areas. For early-stage targets near large deposits, our explainer on greenfield and brownfield exploration sets out how the two differ.
What to watch at the Simandou mine next
- Primary crusher start-up at the SimFer mine, planned for Q4 2026.
- SimFer port commissioning, expected in Q1 2027. Until then SimFer ore moves through the WCS port.
- Quarterly run-rate. Rio Tinto reports Simandou output each quarter; the path from about 10 Mtpa toward 60 Mtpa is the clearest test of the ramp-up.
- WCS output from Blocks 1 and 2, reported by its partners rather than by Rio Tinto.
- Grade and premium. Watch whether sales hold close to the 65.8% Fe average reported for the first half of 2026.
- Iron ore price at the 62% benchmark, which sets the base for every tonne shipped.
- Safety record and the work of the Safety Advisory Panel.
- Government revenue disclosures through EITI Guinea reports.
โถ Remote sensing for mining explained in three minutes. ยท 2:01
Frequently asked questions
Is the Simandou mine operating?
Yes. Operations started in November 2025, the first shipment left Guinea in December 2025 and first sales followed in April 2026. Rio Tinto reported an annualised run-rate of about 10 Mtpa in the third quarter of 2026.
Who owns Simandou?
Blocks 3 and 4 belong to SimFer S.A. (85% SimFer Jersey, a Rio Tinto 53% and Chinalco-led CIOH 47% venture, and 15% Government of Guinea). Blocks 1 and 2 belong to WCS, with Baowu holding 49% of the WCS mine and infrastructure projects and Guinea holding 15% of the mining company.
How much iron ore does Simandou have?
Rio Tinto puts reserves in Blocks 3 and 4 at around 1.5 billion tonnes. Reports on the whole project give more than 3 billion tonnes at over 65% iron.
What is the grade of Simandou iron ore?
In the first half of 2026, SimFer ore was sold at an average of 65.8% Fe, according to Rio Tinto. That is well above the 62% Fe benchmark used to price most seaborne ore.
How much will Simandou produce?
The SimFer mine is designed for 60 Mtpa and the rail and port system for up to 120 Mtpa combined from both mines. Rio Tinto targets the 60 Mtpa SimFer run-rate during the second half of 2028.
How long is the Simandou railway?
The project includes more than 600 km of new rail. The shared main line built by WCS is about 536 km, with a 16 km WCS spur and a roughly 70 km SimFer spur.
How much did Simandou cost?
Rio Tinto gives its own share of total capital cost as US$6.2 billion. The full cost across all partners is higher, because WCS and the Chinese partners fund their own mine and share of infrastructure.
Where does Simandou iron ore go?
Mostly to China. In the first half of 2026, 2.2 Mt was shipped to China, and final crushing of SimFer ore is done there at first.
Why did Simandou take so long to develop?
The deposit is about 600 km from the coast with no existing railway, and its ownership changed several times over three decades. Building the rail and port was the main barrier.
What does Simandou mean for iron ore prices?
It adds a large new source of high-grade supply as Chinese demand is soft. Analysts cited expected new supply among the reasons the 62% Fe price fell to about US$90 per tonne in late October 2026.
How much will Guinea earn from Simandou?
An EITI study from June 2025 estimated US$700 million to US$1.7 billion a year before 2035 and up to US$2.7 billion after, depending on prices.
More from Farmonaut: agro admin app, crop loan and insurance.
This page is for information only. It is not investment advice.
Farmonaut mining
Map your mining site from space
Consultants can screen a licence area, track land change and plan site visits from satellite data before going into the field.
Mining Pro sample view, synthetic data
Sources
- Rio Tinto, Simandou project page (2026): riotinto.com
- Rio Tinto, third quarter 2026 production results (October 2026): riotinto.com
- Rio Tinto, fourth quarter 2025 operations review, ASX (January 2026): announcements.asx.com.au
- Rio Tinto, 2026 half-year results, ASX (July 2026): announcements.asx.com.au
- Rio Tinto, Simandou partners celebrate start of operations (November 2025): riotinto.com
- USGS, Mineral Commodity Summaries 2026: Iron ore: pubs.usgs.gov
- USGS, 2016 Minerals Yearbook: Guinea: pubs.usgs.gov
- U.S. International Trade Administration, Guinea country commercial guide: Mining and minerals: trade.gov
- EITI, Guinea country page (fiscal modelling study, June 2025): eiti.org
- GMK Center, iron ore prices in the second half of October (October 2026): gmk.center
- Mysteel, Simandou iron ore project officially starts operations (November 2025): mysteel.net
Discussion
Questions, corrections or field experience? Share them below. First-time comments are reviewed before they appear, and your email is never published.
No comments yet. Be the first to add a question or your experience.



Client · Oregon, USA · Gold
Exploration consultancy · South Africa · Gold
Licence holder · Niger · Gold
Licence holder · Nigeria · Gold + lithium
Client · Tanzania · Gold
Client · Somalia · Gold
Client & affiliate partner · Ghana · Gold