Mine profile ยท California gold
Western Mesquite Mines Inc: Owner, Output and Status
Western Mesquite Mines, Inc. is the Equinox Gold subsidiary that owns and runs the Mesquite heap leach gold mine in Imperial County, California. It produced 85,998 oz in 2025; 2026 guidance is 70,000 to 80,000 oz.

Key takeaways
- Equinox Gold has owned 100% of Western Mesquite Mines, Inc. since 2018, after buying it from New Gold for US$158 million (Equinox Gold, 2018).
- Mesquite produced 85,998 oz of gold in 2025 at an AISC of US$1,885/oz, down from 141,270 oz in 2020 (Equinox Gold, 2026).
- 2026 guidance is 70,000 to 80,000 oz at an AISC of US$2,500 to US$2,600/oz; output to 30 September was 48,861 oz (Equinox Gold, Aug and Oct 2026).
- Gold Fields started production in March 1986; mining stopped in 2001 and Western Goldfields restarted it, with commercial production from January 2008 (SEC-filed technical report, 2010).
- The site employed 322 people (297 permanent, 25 contractors) in 2025 (Equinox Gold Sustainability Report, 2025).
In this article
- What Western Mesquite Mines Inc is today
- Who owns the Mesquite mine: the full ownership chain
- Mesquite mine production and costs by year
- Latest quarterly results
- Reserves, resources and mine life
- How the Mesquite heap leach works
- Land position, claims and location
- Workforce, environment and permits
- What to check before working on or near Mesquite
- Frequently asked questions
Western Mesquite Mines, Inc. (WMMI) is the company that holds and operates the Mesquite gold mine near Glamis in Imperial County, California. Since October 2018 it has been a wholly owned subsidiary of Equinox Gold, which bought its shares from New Gold for US$158 million (Equinox Gold, acquisition release, 2018). Mesquite is an open-pit, run-of-mine heap leach mine that produced 85,998 ounces of gold in 2025, and Equinox Gold guides 70,000 to 80,000 ounces for 2026 at an all-in sustaining cost of US$2,500 to US$2,600 per ounce (Equinox Gold, Mesquite mine page, guidance of 5 August 2026).
This page sets out who owned the mine and when, the production and cost record year by year, the latest quarterly figures, the reserve base, how the leach pads work, the land package and the workforce. Every number has a date and a source, so consultants and analysts can check it against the next filing. A calculator further down lets you test leach-pad output with your own tonnes, grade and price.
What Western Mesquite Mines Inc is today
WMMI is not a separate listed company and has no share ticker. It is the operating entity that controls the Mesquite mineral rights and runs the site. Its parent, Equinox Gold Corp., trades on the Toronto Stock Exchange and NYSE American under the symbol EQX (Equinox Gold, Orla combination release, 2026).
The name dates from the Western Goldfields era. A 2010 technical report filed with the US Securities and Exchange Commission states that the property is operated as Western Mesquite Mines, Inc., then a wholly owned subsidiary of New Gold (Scott Wilson RPA, Mesquite Mine Technical Report NI 43-101, February 2010). When Equinox Gold bought the mine in 2018, it did so by acquiring all the shares of that same subsidiary, so the operating company name carried through to the new owner.
Equinox Gold describes Mesquite as its first operating mine. The purchase turned Equinox from a developer into a producer, and the company says strong gold prices and drilling of old waste dumps and leach pads have since extended the mine life (Equinox Gold, Mesquite mine page, 2026).
Key facts at a glance
| Item | Value | Date and source |
|---|---|---|
| Operating company | Western Mesquite Mines, Inc. | SEC-filed technical report, 2010; Equinox Gold, 2018 |
| Parent company | Equinox Gold Corp. (TSX and NYSE American: EQX) | Equinox Gold, 2026 |
| Ownership | 100% | Equinox Gold mine page, 2026 |
| Mine type | Open pit, run-of-mine heap leach | Equinox Gold mine page, 2026 |
| Gold produced | 85,998 oz | Equinox Gold, 2025 actuals |
| Production guidance | 70,000 to 80,000 oz | Equinox Gold, guidance of 5 August 2026 |
| AISC guidance | US$2,500 to US$2,600 per oz | Equinox Gold, guidance of 5 August 2026 |
| Cumulative output | More than 5 million oz since 1986 | Equinox Gold mine page, 2026 |
| Land package | About 5,200 acres | SEC-filed technical report, 2010 |
Who owns the Mesquite mine: the full ownership chain
Mesquite has changed hands five times. The 2010 technical report gives the early history: Gold Fields Mining Corporation started commercial production in March 1986 as a heap leach operation; Santa Fe Pacific Gold bought the mine in 1993; and Newmont took it over when it acquired Santa Fe in May 1997 (Mesquite technical report, 2010).
Newmont mined until May 2001, when a slope failure in the Big Chief pit and a gold price near US$300 per ounce made the remaining reserves uneconomic. Mining stopped, but gold kept draining from the existing leach pads through 2007. About 3.05 million ounces were recovered between 1985 and 2007 at a calculated average recovery of 76.5% (same report).
Western Goldfields Inc. (WGI) bought the mine from Newmont in November 2003, completed a feasibility study in 2006 and won regulatory approval to restart mining on 2 July 2007, after the Imperial County Air Pollution Control District issued its air quality permit. Commercial production resumed in January 2008. In June 2009 New Gold took over through a business combination with WGI. Newmont’s 2% net smelter return (NSR) royalty, a payment based on the value of metal sold after smelting and refining charges, was transferred to Franco-Nevada in 2007 (same report).
| Period | Owner or operator | What happened |
|---|---|---|
| 1986 to 1993 | Gold Fields Mining Corporation | Commercial heap leach production from March 1986 |
| 1993 to 1997 | Santa Fe Pacific Gold | Bought the mine from Gold Fields |
| 1997 to 2003 | Newmont | Mining stopped in May 2001; residual leaching continued |
| 2003 to 2009 | Western Goldfields Inc. | Restart approved July 2007; commercial production January 2008 |
| 2009 to 2018 | New Gold Inc. | Ran the mine through its subsidiary WMMI |
| 2018 onward | Equinox Gold Corp. | Bought WMMI for US$158 million cash |
A common mistake in older write-ups is to say that Western Mesquite Mines Inc. opened the mine in the 1980s. The filings show Gold Fields built and started it. Another mix-up is the restart: WGI, not New Gold, brought the mine back in 2007 and 2008.
Mesquite mine production and costs by year
Equinox Gold publishes six years of operating data on its mine page. Two cost terms matter. Cash cost is the site operating cost per ounce sold. All-in sustaining cost (AISC) adds sustaining capital, such as capitalised waste stripping, and some overheads, so it is closer to the real cost of keeping the mine going.
Chart
All-in sustaining cost per ounce
US$ per ounce sold; 2026 is the midpoint of guidance
Chart
Mesquite gold production by year
Troy ounces of gold produced, 2020 to 2025
| Year | Gold produced (oz) | Cash cost (US$/oz) | AISC (US$/oz) | Sustaining capital (US$M) |
|---|---|---|---|---|
| 2020 | 141,270 | 899 | 1,091 | 24 |
| 2021 | 137,467 | 974 | 1,327 | 46 |
| 2022 | 123,965 | 978 | 1,285 | 36 |
| 2023 | 87,753 | 1,105 | 1,251 | 11 |
| 2024 | 71,984 | 1,259 | 1,306 | 0.6 |
| 2025 | 85,998 | 1,345 | 1,885 | 40.5 |
Output has roughly halved since 2020. The jump in AISC in 2025 follows a rise in sustaining capital to US$40.5 million, and Equinox Gold’s 2026 capital plan for Mesquite is mainly capitalised stripping, the cost of removing waste rock to reach the next ore. For 2026 the company guides cash costs of US$1,800 to US$1,900 per ounce and AISC of US$2,500 to US$2,600 per ounce (Equinox Gold, Q2 2026 results and updated guidance).
Gold prices explain why a mine with these costs keeps running. Equinox Gold sold gold at an average realised price of US$4,256 per ounce across its operations in the second quarter of 2026, and the Kitco spot bid was US$3,876.80 per ounce at midday New York time on 12 November 2026 (Kitco, gold spot, 12 November 2026). For context, the US Geological Survey estimates national mine output at 160 metric tons of gold in 2025, with Nevada at about 64% and Alaska at about 22% (USGS Mineral Commodity Summaries 2026, gold). Mesquite’s 2025 output, about 2.7 metric tons, is a little under 2% of that national total.
Latest quarterly results
Equinox Gold reports Mesquite each quarter. The fourth quarter of 2025 produced 14,761 ounces (Equinox Gold, Q4 2025 production release, January 2026). The second quarter of 2026 produced 18,572 ounces (Q2 2026 results). The third quarter produced 17,116 ounces from 2,180,873 tonnes of ore at a processed grade of 0.43 grams per tonne (g/t), and the year to 30 September reached 48,861 ounces (Equinox Gold, Q3 2026 production release, 13 October 2026). Subtracting the second and third quarters from the year-to-date total gives about 13,173 ounces for the first quarter.
Chart
Mesquite gold production by quarter
Troy ounces; Q1 2026 derived from year-to-date total
Grade here means grams of gold per metric tonne of ore. At 0.43 g/t, a tonne of rock holds less than half a gram of gold, which is why Mesquite moves millions of tonnes each quarter. With 48,861 ounces by the end of September, the mine needs about 21,000 to 31,000 ounces in the fourth quarter to land inside its 70,000 to 80,000 ounce guidance.
Reserves, resources and mine life
Equinox Gold’s reserve table lists Mesquite proven and probable mineral reserves of 22.4 million tonnes at 0.38 g/t for 275,000 ounces of contained gold. Measured and indicated resources, reported in addition to reserves, are 83.3 million tonnes at 0.41 g/t for 1.09 million ounces, and inferred resources are 5.6 million tonnes at 0.32 g/t for 58,000 ounces (Equinox Gold, Reserves and Resources).
A reserve is the part of a deposit that a qualified person has shown can be mined at a profit under stated prices and costs. A resource has reasonable prospects for extraction but has not passed that economic test. The page names the April 2020 Mesquite technical report, with an effective date of 31 December 2019, as the basis for its Mesquite figures, so check the date of the table before using it.
Equinox Gold says its work at Mesquite focuses on turning resources into reserves, permitting, exploring for new mineralisation, heap leach optimisation and designing new leach pads to extend the mine life. Its 2026 capital plan for the site covers capitalised stripping and studies on mine life expansion, with exploration aimed at resource growth (Equinox Gold, Q4 2025 production and guidance release). The company also expects residual leaching to keep producing gold for two to three years after the last ore is placed.
For a wider view of how deposits like this compare, see our guide to types of gold deposits, and our list of active gold mines in the USA.
How the Mesquite heap leach works
Mining uses owner-operated trucks and shovels in open pits. Run-of-mine ore, meaning rock that goes straight from the pit without crushing, is hauled to a lined leach pad. A dilute cyanide solution trickles through the heap and dissolves the gold. The gold-bearing solution drains to ponds and passes through a carbon-in-column circuit, where activated carbon absorbs the gold before it is stripped and refined into dorรฉ bars (Equinox Gold, Mesquite mine page, 2026).
Infographic
From pit to dorรฉ in 5 steps
- 1MineTrucks and shovels dig ore from open pits.
- 2StackRun-of-mine ore goes straight to a lined leach pad.
- 3LeachDilute cyanide solution dissolves gold over about 90 days.
- 4RecoverCarbon columns absorb gold from the solution.
- 5RefineGold is stripped from carbon and poured as dorรฉ.
Equinox Gold reports average recoveries of about 75% for oxide ore and 35% for non-oxide ore on a 90-day leach cycle. Oxide ore has been weathered, so the solution reaches the gold easily; non-oxide ore still holds sulphide or unweathered minerals that lock some gold away. While one ore body is mined, the crew starts stripping waste from the next deposit so that ore supply does not stop.
The deposit itself sits on the southwest flank of the Chocolate Mountains. Gold occurs in Mesozoic gneiss intruded by granite, in two near-parallel Oligocene deposits called Big Chief-Vista and Rainbow, under up to 300 feet of younger sediment and bounded by faults linked to the San Andreas system (Equinox Gold, 2026). Our article on heap leaching innovations in metal extraction covers how other operators design and monitor leach pads.
Calculator
How much gold does a leach pad give back?
Enter tonnes stacked, grade, recovery, gold price and cost per ounce.
- Contained gold (oz): 25,721
- Revenue (US$): $73,303,647
- Margin over AISC (US$): $25,077,564
Example values only, not a benchmark. Default recovery uses Equinox Gold’s 75% oxide average for Mesquite (2026). Gold price and AISC are inputs: use today’s price and your own cost.
โถ How gold is mined and refined, from rock to bar ยท 5:27
Land position, claims and location
Mesquite lies about 24 miles north of the Mexican border and 16 miles west of the Arizona state line. Access is from California State Highway 78, and the nearest town with services is Brawley, about 35 miles away (Equinox Gold, Mesquite mine page, 2026; Mesquite technical report, 2010). Equinox Gold’s Castle Mountain mine is about 200 miles to the north.
The 2010 report lists 213 unpatented and 53 patented lode claims, 127 patented and 97 unpatented mill site claims, 658 acres of California state leased land and 315 acres of fee land, for about 5,200 acres in all, controlled by WMMI. Claims on federal land are administered by the Bureau of Land Management (BLM). A patented claim gives title to the land; an unpatented claim gives the right to mine federal land as long as annual maintenance fees are paid. Equinox Gold’s 2018 release gives the mineral rights as about 1,890 hectares, or about 4,670 acres, smaller than the 2010 figure; neither source explains the difference.
If you work on claims nearby, our California gold mining claims compliance guide explains filings and fees.
โถ Why owning a mining claim is not the same as owning the land ยท 3:19
Workforce, environment and permits
Equinox Gold’s 2025 Sustainability Report lists the Mesquite workforce as 297 permanent employees, no temporary staff and 25 contractors, a total of 322 people. The same report records zero fatalities at Mesquite in 2025 and notes an external assurance site visit to the mine (Equinox Gold, 2025 Sustainability Report).
The mine needs both federal and state approvals. The 2007 restart depended on an air quality permit from the Imperial County Air Pollution Control District. California’s Surface Mining and Reclamation Act (SMARA) requires an approved reclamation plan and financial assurance for every surface mine; when Equinox Gold bought Mesquite it took over the bonding obligations for long-term reclamation (Equinox Gold, 2018).
Operators that want to track haul fleets, emissions or the origin of metal can look at satellite tools such as fleet management, carbon footprint monitoring and product traceability.
โถ The main environmental impacts of mining, explained ยท 2:31
What to check before working on or near Mesquite
Consultants, contractors and analysts often need a figure that is newer than any article. Use this order:
- Quarterly numbers: Equinox Gold production releases (about two weeks after each quarter) and the financial results releases that follow.
- Guidance: the latest guidance table, which Equinox Gold updated on 5 August 2026 after the Orla Mining combination.
- Reserves and resources: the Equinox Gold reserve table and the technical report it names, filed on SEDAR+.
- Historical record: the 2010 technical report on SEC EDGAR for ownership dates, claim counts and early production.
- Land status: BLM records for the unpatented claims and Imperial County for permits.
- Market context: USGS Mineral Commodity Summaries for national output and a dated spot price from Kitco or the LBMA.
- Ground change: recent satellite images show new pits, waste dumps and leach pad lifts between reporting dates.
For a framework on margins at mines like this, see our article on mining profitability.
Frequently asked questions
What is Western Mesquite Mines Inc?
It is the operating subsidiary that holds and runs the Mesquite gold mine in Imperial County, California. Equinox Gold has owned all of its shares since October 2018.
Who owns the Mesquite gold mine?
Equinox Gold Corp. owns 100% of the mine through Western Mesquite Mines, Inc. It bought the subsidiary from New Gold for US$158 million in 2018.
Is the Mesquite mine still operating?
Yes. It produced 17,116 ounces in the third quarter of 2026 and 48,861 ounces in the first nine months, per Equinox Gold’s October 2026 release.
How much gold does Mesquite produce a year?
It produced 85,998 ounces in 2025. Guidance is 70,000 to 80,000 ounces, and output was above 137,000 ounces a year in 2020 and 2021.
Where is the Mesquite mine located?
Near Glamis in eastern Imperial County, about 16 miles west of Arizona and 24 miles north of Mexico, reached from State Highway 78. Brawley is about 35 miles away.
When did the Mesquite mine open?
Gold Fields Mining Corporation began commercial production in March 1986. Mining stopped in 2001 and restarted under Western Goldfields, with commercial production from January 2008.
Why did the Mesquite mine close in 2001?
The 2010 technical report cites a slope failure in the Big Chief pit and a gold price near US$300 per ounce, which made the remaining reserves uneconomic. Gold recovery from the leach pads continued.
What does it cost to produce an ounce at Mesquite?
AISC was US$1,885 per ounce in 2025. The current guidance range is US$2,500 to US$2,600 per ounce, with cash costs of US$1,800 to US$1,900.
How many people work at the Mesquite mine?
Equinox Gold’s 2025 Sustainability Report lists 297 permanent employees and 25 contractors, a total of 322.
Is there a royalty on Mesquite?
The 2010 technical report records a 2% net smelter return royalty that passed from Newmont to Franco-Nevada in 2007. Check Equinox Gold’s latest annual information form for the current terms.
What gold recovery does the Mesquite heap leach get?
About 75% for oxide ore and 35% for non-oxide ore over a 90-day leach cycle, according to Equinox Gold.
More from Farmonaut: agro admin app, crop loan and insurance, farmonaut satellite weather api developer docs, amethyst mining 7 powerful sustainable practices for 2026, mesquite mine western mesquite mines inc gold 2026.
This page is for information only. It is not investment advice. Company figures are as reported by Equinox Gold on the dates shown.
Farmonaut mining
Map your mining site from space
Consultants can screen ground near an operating mine with satellite mineral mapping before field work.
Mining Pro sample view, synthetic data
Sources
- Equinox Gold, Mesquite Gold Mine page (2026): equinoxgold.com
- Equinox Gold, Reserves and Resources: equinoxgold.com
- Equinox Gold, Q3 2026 production results (13 October 2026): equinoxgold.com
- Equinox Gold, Q2 2026 financial results and updated guidance (5 August 2026): equinoxgold.com
- Equinox Gold, Q4 2025 production and 2026 guidance (14 January 2026): equinoxgold.com
- Equinox Gold, 2025 Sustainability Report: equinoxgold.com
- Equinox Gold, acquisition of the Mesquite Gold Mine (2018): equinoxgold.com
- Equinox Gold, completion of Orla Mining combination (2026): equinoxgold.com
- Scott Wilson RPA for New Gold, Mesquite Mine Technical Report NI 43-101, SEC EDGAR (2010): sec.gov
- USGS, Mineral Commodity Summaries 2026: Gold: pubs.usgs.gov
- Kitco, gold spot price (12 November 2026): kitco.com
- Bureau of Land Management, Mining Claims information packet (2026): blm.gov
Discussion
Questions, corrections or field experience? Share them below. First-time comments are reviewed before they appear, and your email is never published.
No comments yet. Be the first to add a question or your experience.




Client · Oregon, USA · Gold
Exploration consultancy · South Africa · Gold
Licence holder · Niger · Gold
Licence holder · Nigeria · Gold + lithium
Client · Tanzania · Gold
Client · Somalia · Gold
Client & affiliate partner · Ghana · Gold